Other fuelsOperatingTEC

Mosaic South Pierce Operations

Other fuels power plant in Polk County, Florida. 38 MW of nameplate capacity across 1 generator, operated by Mosaic Fertilizer LLC.

Also known as EIA plant 10004

Analyst: free account, 1 question a day.

DurranceJamison Solar (FL)PolkHines Energy ComplexTiger BayMosaic South Pierce O…5 km
Open in the map
6 plants within 9.7 km, from EIA coordinates.

Key facts

Capacity
38 MWNameplate
Generators
1 operatingEIA-860M, August 2026
Operating since
January 1992First generator online
Operator
Mosaic Fertilizer LLCEIA operator ID 9383
Grid
TECBalancing authority TEC
Price nodes
None linkedNo verified ISO node
Location
Polk County, FL27.7652, −81.9388
EIA plant ID
10004EIA plant page

Data as of EIA-860M August 2026 (published 2026-09-24). Capacity is nameplate, not live output.

How much power Mosaic South Pierce Operations produces

Free · EIA-923

Net generation, 2025

87.5 GWh

87,532 MWh, final

Capacity factor, 2025

Not reported

2024: 30.1%

January to July 2026

32.1 GWh

Provisional

Range, 2015 to 2025

87.5–254.5

GWh a year. Low 2025, high 2019

Annual net generation, GWhCapacity factor below each year
Annual net generation from EIA-923
YearNet generation, MWhCapacity factorMonths reported
2000Not reportedNot reported0 of 12
2001Not reportedNot reported0 of 12
2002306,821Not reported12 of 12
2003Not reportedNot reported0 of 12
2004274,021Not reported12 of 12
2005251,031Not reported11 of 12
2006203,097Not reported12 of 12
2007138,613Not reported12 of 12
2008135,224Not reported12 of 12
200942,948Not reported12 of 12
201078,26019.6%12 of 12
2011158,72539.8%12 of 12
2012161,046Not reported12 of 12
2013207,94252.2%12 of 12
2014238,28459.8%12 of 12
2015242,41060.8%12 of 12
2016204,75751.2%12 of 12
2017220,91155.4%12 of 12
2018247,54562.1%12 of 12
2019254,54463.9%12 of 12
2020195,87149.0%12 of 12
2021119,25629.9%12 of 12
202299,91325.1%12 of 12
2023155,75639.1%12 of 12
2024120,39830.1%12 of 12
202587,532Not reported12 of 12
2026 (provisional, partial year)32,14716.6%7 of 7

* 2026 covers January to July and is provisional. Capacity factor is net generation divided by nameplate capacity times the hours of each reported month.

Power prices and basis

Free account

No verified ISO price node is linked to this plant, or its price history could not load.

Emissions

Free · EPA CAMPD

No EPA emissions units are linked to this plant.

Water use

Free · EIA-923 cooling, USGS

No EIA cooling-water record for this plant in 2024.

Generators

Free · EIA-860M
GeneratorTechnologyNameplate MWOnline since
TG2All Other38.0January 1992

Ownership and offtake

Pro
Pro

Ownership and offtake are part of Pro

Owners and their shares, parent companies, and power purchase agreements with their buyers. EIA-860M lists Mosaic Fertilizer LLC as the operator, which is not always the owner.

Modeled data

Pro

Pro adds modeled values for this plant. Everything above stays free.

Modeled

Generation potential vs reported

Monthly potential at seasonal net capability, next to EIA-923 output. Shows how much of the plant's capability was used.

Analyst and MCP

300 analyst questions a month, plus MCP

Query Mosaic South Pierce Operations and 14,224 other projects from Claude or your own tools. Free accounts get 1 question a day.

Power plants near Mosaic South Pierce Operations

More plants operated by Mosaic Fertilizer LLC

Questions about Mosaic South Pierce Operations

How much power does Mosaic South Pierce Operations produce?

Mosaic South Pierce Operations reported 87,532 MWh (87.5 GWh) of net generation in 2025. From January to July 2026 it reported 32.1 GWh, which is provisional.

Where is Mosaic South Pierce Operations?

Mosaic South Pierce Operations is in Polk County, Florida, at 27.7652, −81.9388. It is in the Tampa Electric Company balancing area (TEC).

Who operates Mosaic South Pierce Operations?

EIA-860M for August 2026 lists Mosaic Fertilizer LLC as the operator (EIA operator ID 9383). The operator is not always the owner.

When did Mosaic South Pierce Operations start operating?

Its first generator began operating in January 1992, according to EIA-860M.

Sources

  • EIA-860 2025 (final) and EIA-860M August 2026: plant, generators, capacity, operator and location
  • EIA-923 monthly net generation, 2000 to July 2026 (2026 provisional)

Page updated 2026-10-04 from the InfraMap data build. Methodology · Data sources · EIA plant page