Natural gasSolarBattery storageOperatingCPLE

Butler-Warner Generation Plant

Natural gas project in Cumberland County, North Carolina. 304.9 MW of nameplate capacity across 11 generators, operated by Fayetteville Public Works Commission.

Also known as EIA plant 1016

This project groups Butler-Warner Generation Plant (EIA 1016). EIA reports them as separate plants.

Analyst: free account, 1 question a day.

Quincy Solar (NC)Panda Solar NC 5, LLCBoykin PV1Carter PV1Collier BESSRockfish SolarButler-Warner Generat…5 km
Open in the map
6 plants within 15 km, from EIA coordinates.

Key facts

Capacity
304.9 MWNatural gas 303.4 · Solar 1.0 · Battery storage 0.5
Generators
11 operatingEIA-860M, August 2026
Operating since
July 1976First generator online
Operator
Fayetteville Public Works CommissionEIA operator ID 6235
Grid
CPLEBalancing authority CPLE
Price nodes
None linkedNo verified ISO node
Location
Cumberland County, NC35.0986, −78.8294
EIA plant ID
1016EIA plant page

Data as of EIA-860M August 2026 (published 2026-09-24). Capacity is nameplate, not live output.

How much power Butler-Warner Generation Plant produces

Free · EIA-923

Net generation, 2025

113 GWh

112,819 MWh, final

Capacity factor, 2025

4.2%

2024: 1.6%

January to July 2026

52.9 GWh

Provisional

Range, 2016 to 2025

−1.9–112.8

GWh a year. Low 2021, high 2025

Annual net generation, GWhCapacity factor below each year
Annual net generation from EIA-923
YearNet generation, MWhCapacity factorMonths reported
2000158,207Not reported12 of 12
2001104,679Not reported12 of 12
2002216,426Not reported12 of 12
2003Not reportedNot reported0 of 12
200472,622Not reported12 of 12
2005110,835Not reported12 of 12
2006Not reportedNot reported0 of 12
200774,418Not reported12 of 12
200824,698Not reported9 of 12
200911,389Not reported12 of 12
201075,2642.8%12 of 12
201144,5041.7%12 of 12
201230,6941.2%12 of 12
2013−2,653Not reported12 of 12
201414,3760.5%12 of 12
201517,0560.7%11 of 12
20165,5440.2%12 of 12
201710,2960.4%12 of 12
201867,2632.5%12 of 12
20199,0920.3%12 of 12
2020−1,758-0.1%12 of 12
2021−1,884-0.1%12 of 12
202251,4541.9%12 of 12
202319,4170.7%12 of 12
202441,3531.6%12 of 12
2025112,8194.2%12 of 12
2026 (provisional, partial year)52,8593.4%7 of 7

* 2026 covers January to July and is provisional. Capacity factor is net generation divided by nameplate capacity times the hours of each reported month.

Power prices and basis

Free account

No verified ISO price node is linked to this plant, or its price history could not load.

Emissions

Free · EPA CAMPD

CO₂, 2025

Not reported

US short tons. 2024: Not reported

SO₂, 2025

0

US short tons

NOx, 2025

185

US short tons

0 of 8 EPA units reported CO₂ in 2025 (GT-1, GT-2, GT-3, GT-4, GT-5, GT-6, GT-7, GT-8), matched to EIA plant 1016 through the EPA–EIA crosswalk.

Water use

Free · EIA-923 cooling, USGS

No EIA cooling-water record for this plant in 2024.

Generators

Free · EIA-860M
GeneratorTechnologyNameplate MWOnline since
1Natural Gas Fired Combined Cycle28.8December 1976
2Natural Gas Fired Combined Cycle28.8December 1976
3Natural Gas Fired Combined Cycle28.8July 1976
4Natural Gas Fired Combustion Turbine28.8July 1976
5Natural Gas Fired Combustion Turbine28.8July 1977
6Natural Gas Fired Combined Cycle28.8June 1978
7Natural Gas Fired Combined Cycle28.8June 1979
8Natural Gas Fired Combined Cycle28.8May 1980
9Natural Gas Fired Combined Cycle73.0December 1988
10Solar Photovoltaic1.0June 2019
11Batteries0.5September 2019

Ownership and offtake

Pro
Pro

Ownership and offtake are part of Pro

Owners and their shares, parent companies, and power purchase agreements with their buyers. EIA-860M lists Fayetteville Public Works Commission as the operator, which is not always the owner.

Modeled data

Pro

Pro adds modeled values for this plant. Everything above stays free.

Modeled

Generation potential vs reported

Monthly potential at seasonal net capability, next to EIA-923 output. Shows how much of the plant's capability was used.

Analyst and MCP

300 analyst questions a month, plus MCP

Query Butler-Warner Generation Plant and 14,224 other projects from Claude or your own tools. Free accounts get 1 question a day.

Power plants near Butler-Warner Generation Plant

More plants operated by Fayetteville Public Works Commission

Questions about Butler-Warner Generation Plant

How much power does Butler-Warner Generation Plant produce?

Butler-Warner Generation Plant reported 112,819 MWh (113 GWh) of net generation in 2025, a 4.2% capacity factor on 304.9 MW of nameplate capacity. From January to July 2026 it reported 52.9 GWh, which is provisional.

Where is Butler-Warner Generation Plant?

Butler-Warner Generation Plant is in Cumberland County, North Carolina, at 35.0986, −78.8294. It is in the Duke Energy Progress East balancing area (CPLE).

Who operates Butler-Warner Generation Plant?

EIA-860M for August 2026 lists Fayetteville Public Works Commission as the operator (EIA operator ID 6235). The operator is not always the owner.

When did Butler-Warner Generation Plant start operating?

Its first generator began operating in July 1976, according to EIA-860M.

Sources

  • EIA-860 2025 (final) and EIA-860M August 2026: plant, generators, capacity, operator and location
  • EIA-923 monthly net generation, 2000 to July 2026 (2026 provisional)
  • EPA CAMPD annual emissions through the EPA–EIA crosswalk, 1995 to 2025

Page updated 2026-10-04 from the InfraMap data build. Methodology · Data sources · EIA plant page