Wood biomassOperatingJEA

Fernandina Beach Mill

Wood biomass power plant in Nassau County, Florida. 96.9 MW of nameplate capacity across 2 generators, operated by WestRock, Fernandina Beach.

Also known as EIA plant 10202

Analyst: free account, 1 question a day.

Eight Flags EnergyKings Bay Solar FacilityStarratt SolarAEP Jacksonville Solar ProjectNorthside Generating…Fernandina Beach Mill10 km
Open in the map
6 plants within 31 km, from EIA coordinates.

Key facts

Capacity
96.9 MWNameplate
Generators
2 operatingEIA-860M, August 2026
Operating since
September 1982First generator online
Operator
WestRock, Fernandina BeachEIA operator ID 9686
Grid
JEABalancing authority JEA
Price nodes
None linkedNo verified ISO node
Location
Nassau County, FL30.6818, −81.4554
EIA plant ID
10202EIA plant page

Data as of EIA-860M August 2026 (published 2026-09-24). Capacity is nameplate, not live output.

How much power Fernandina Beach Mill produces

Free · EIA-923

Net generation, 2025

592 GWh

591,865 MWh, final

Capacity factor, 2025

69.7%

2024: 66.7%

January to July 2026

307 GWh

Provisional

Range, 2015 to 2025

557.7–688.2

GWh a year. Low 2023, high 2018

Annual net generation, GWhCapacity factor below each year
Annual net generation from EIA-923
YearNet generation, MWhCapacity factorMonths reported
2000550,835Not reported12 of 12
2001650,926Not reported12 of 12
2002376,768Not reported12 of 12
2003Not reportedNot reported0 of 12
2004577,972Not reported12 of 12
2005581,192Not reported12 of 12
2006582,784Not reported12 of 12
2007610,377Not reported12 of 12
2008651,135Not reported12 of 12
2009657,605Not reported12 of 12
2010658,00063.4%12 of 12
2011734,54470.8%12 of 12
2012578,14155.6%12 of 12
2013596,970Not reported12 of 12
2014624,54560.2%12 of 12
2015631,458Not reported12 of 12
2016660,115Not reported12 of 12
2017640,99375.5%12 of 12
2018688,15981.1%12 of 12
2019634,14774.7%12 of 12
2020612,41972.0%12 of 12
2021636,10874.9%12 of 12
2022582,63368.6%12 of 12
2023557,72465.7%12 of 12
2024568,15166.7%12 of 12
2025591,86569.7%12 of 12
2026 (provisional, partial year)307,19562.3%7 of 7

* 2026 covers January to July and is provisional. Capacity factor is net generation divided by nameplate capacity times the hours of each reported month.

Power prices and basis

Free account

No verified ISO price node is linked to this plant, or its price history could not load.

Emissions

Free · EPA CAMPD

No EPA emissions units are linked to this plant.

Water use

Free · EIA-923 cooling, USGS

Withdrawal, 2024

6,160

million gallons as reported; not used, see note

Consumption, 2024

92

million gallons

Source

Wells

Ground, Fresh. Induced-draft tower

Watershed stress

Very low/none · 0.121

USGS SUI, HUC12 Amelia River

12 of 12 cooling months report withdrawal. Groundwater user; SUI describes surface water and is context only. Consumption is below 5% of a large reported withdrawal, so the withdrawal is not used. Blank volumes are unreported, not zero.

Generators

Free · EIA-860M
GeneratorTechnologyNameplate MWOnline since
GEN5Wood/Wood Waste Biomass37.4January 1988
GEN6Wood/Wood Waste Biomass59.5September 1982

Ownership and offtake

Pro
Pro

Ownership and offtake are part of Pro

Owners and their shares, parent companies, and power purchase agreements with their buyers. EIA-860M lists WestRock, Fernandina Beach as the operator, which is not always the owner.

Modeled data

Pro

Pro adds modeled values for this plant. Everything above stays free.

Modeled

Generation potential vs reported

Monthly potential at seasonal net capability, next to EIA-923 output. Shows how much of the plant's capability was used.

Analyst and MCP

300 analyst questions a month, plus MCP

Query Fernandina Beach Mill and 14,224 other projects from Claude or your own tools. Free accounts get 1 question a day.

Power plants near Fernandina Beach Mill

Questions about Fernandina Beach Mill

How much power does Fernandina Beach Mill produce?

Fernandina Beach Mill reported 591,865 MWh (592 GWh) of net generation in 2025, a 69.7% capacity factor on 96.9 MW of nameplate capacity. From January to July 2026 it reported 307 GWh, which is provisional.

Where is Fernandina Beach Mill?

Fernandina Beach Mill is in Nassau County, Florida, at 30.6818, −81.4554. It is in the JEA balancing area (JEA).

Who operates Fernandina Beach Mill?

EIA-860M for August 2026 lists WestRock, Fernandina Beach as the operator (EIA operator ID 9686). The operator is not always the owner.

When did Fernandina Beach Mill start operating?

Its first generator began operating in September 1982, according to EIA-860M.

Sources

  • EIA-860 2025 (final) and EIA-860M August 2026: plant, generators, capacity, operator and location
  • EIA-923 monthly net generation, 2000 to July 2026 (2026 provisional)
  • EIA-923 cooling water 2024 and the USGS surface water supply and use index, Water years 2010-2020 (Oct 2009 to Sep 2020), mean of monthly values

Page updated 2026-10-04 from the InfraMap data build. Methodology · Data sources · EIA plant page