HydroOperatingISO-NE

Brassua Hydroelectric Project

Hydro power plant in Somerset County, Maine. 3.6 MW of nameplate capacity across 1 generator, operated by Brassua Hydroelectric LP.

Also known as EIA plant 10555

Analyst: free account, 1 question a day.

Harris HydroMoscowBrassua Hydroelectric…25 km
Open in the map
2 plants within 57 km, from EIA coordinates.

Key facts

Capacity
3.6 MWNameplate
Generators
1 operatingEIA-860M, August 2026
Operating since
September 1989First generator online
Operator
Brassua Hydroelectric LPEIA operator ID 2179
Grid
ISO-NEBalancing authority ISNE
Price nodes
1 ISONE nodeResource nodes with prices
Location
Somerset County, ME45.6603, −69.8122
EIA plant ID
10555EIA plant page

Data as of EIA-860M August 2026 (published 2026-09-24). Capacity is nameplate, not live output.

How much power Brassua Hydroelectric Project produces

Free · EIA-923

Net generation, 2025

10.9 GWh

10,932 MWh, final

Capacity factor, 2025

34.7%

2024: 32.9%

January to July 2026

Not reported

Provisional. 0 of 7 months reported

Range, 2015 to 2025

9.6–19.9

GWh a year. Low 2021, high 2023

Annual net generation, GWhCapacity factor below each year
Annual net generation from EIA-923
YearNet generation, MWhCapacity factorMonths reported
2000Not reportedNot reported0 of 12
200113,265Not reported12 of 12
200213,009Not reported12 of 12
200315,314Not reported12 of 12
200417,276Not reported12 of 12
200520,698Not reported12 of 12
200623,815Not reported12 of 12
200717,963Not reported12 of 12
200821,108Not reported12 of 12
200922,720Not reported12 of 12
201021,50268.2%12 of 12
201121,83269.2%12 of 12
201218,92759.9%12 of 12
201316,74053.1%12 of 12
201415,54849.3%12 of 12
201515,58249.4%12 of 12
201617,40455.0%12 of 12
201719,29561.2%12 of 12
201816,33951.8%12 of 12
201915,20748.2%12 of 12
202012,43139.3%12 of 12
20219,59330.4%12 of 12
202212,54139.8%12 of 12
202319,86063.0%12 of 12
202410,41332.9%12 of 12
202510,93234.7%12 of 12
2026 (provisional, partial year)Not reportedNot reported0 of 7

* 2026 covers January to July and is provisional. Capacity factor is net generation divided by nameplate capacity times the hours of each reported month.

Power prices and basis

Free account · ISONE

Emissions

Free · EPA CAMPD

No EPA emissions units are linked to this plant.

Water use

Free · EIA-923 cooling, USGS

No EIA cooling-water record for this plant in 2024. Plants without steam cooling, such as wind, solar and batteries, do not report cooling water.

Generators

Free · EIA-860M
GeneratorTechnologyNameplate MWOnline since
1Conventional Hydroelectric3.6September 1989

Ownership and offtake

Pro
Pro

Ownership and offtake are part of Pro

Owners and their shares, parent companies, and power purchase agreements with their buyers. EIA-860M lists Brassua Hydroelectric LP as the operator, which is not always the owner.

Modeled data

Pro

Pro adds modeled values for this plant. Everything above stays free.

Analyst and MCP

300 analyst questions a month, plus MCP

Query Brassua Hydroelectric Project and 14,224 other projects from Claude or your own tools. Free accounts get 1 question a day.

Power plants near Brassua Hydroelectric Project

Questions about Brassua Hydroelectric Project

How much power does Brassua Hydroelectric Project produce?

Brassua Hydroelectric Project reported 10,932 MWh (10.9 GWh) of net generation in 2025, a 34.7% capacity factor on 3.6 MW of nameplate capacity.

Where is Brassua Hydroelectric Project?

Brassua Hydroelectric Project is in Somerset County, Maine, at 45.6603, −69.8122. It is in the ISO New England Inc. balancing area (ISNE).

Who operates Brassua Hydroelectric Project?

EIA-860M for August 2026 lists Brassua Hydroelectric LP as the operator (EIA operator ID 2179). The operator is not always the owner.

When did Brassua Hydroelectric Project start operating?

Its first generator began operating in September 1989, according to EIA-860M.

Does InfraMap have power prices for Brassua Hydroelectric Project?

Yes. InfraMap has ISONE day-ahead and real-time prices at 1 price node linked to Brassua Hydroelectric Project, with the hub price and node-to-hub basis. Prices are free with an InfraMap account; pricing node names are part of InfraMap Pro.

Sources

  • EIA-860 2025 (final) and EIA-860M August 2026: plant, generators, capacity, operator and location
  • EIA-923 monthly net generation, 2000 to July 2026 (2026 provisional)
  • ISONE day-ahead and real-time prices; node and hub assignments as of 2026-10-05

Page updated 2026-10-04 from the InfraMap data build. Methodology · Data sources · EIA plant page