Wood biomassOperatingISO-NE

NE Renewable Power West Enfield

Wood biomass power plant in Penobscot County, Maine. 27.5 MW of nameplate capacity across 1 generator, operated by Stored Solar J&WE.

Also known as Indeck West Enfield Energy Center · EIA plant 10766

Analyst: free account, 1 question a day.

Corkwood Solar (CSG)Lincoln ME 1Pumpkin HillNE Renewable Power We…5 km
Open in the map
5 plants within 15 km, from EIA coordinates.

Key facts

Capacity
27.5 MWNameplate
Generators
1 operatingEIA-860M, August 2026
Operating since
December 1987First generator online
Operator
Stored Solar J&WEEIA operator ID 62815
Grid
ISO-NEBalancing authority ISNE
Price nodes
1 ISONE nodeResource nodes with prices
Location
Penobscot County, ME45.2537, −68.6279
EIA plant ID
10766EIA plant page

Data as of EIA-860M August 2026 (published 2026-09-24). Capacity is nameplate, not live output.

How much power NE Renewable Power West Enfield produces

Free · EIA-923

Net generation, 2025

42.6 GWh

42,629 MWh, final

Capacity factor, 2025

17.7%

2024: 21.0%

January to July 2026

Not reported

Provisional. 0 of 7 months reported

Range, 2015 to 2025

9.3–136.2

GWh a year. Low 2020, high 2015

Annual net generation, GWhCapacity factor below each year
Annual net generation from EIA-923
YearNet generation, MWhCapacity factorMonths reported
2000Not reportedNot reported0 of 12
200171,454Not reported12 of 12
2002131,111Not reported12 of 12
2003131,322Not reported11 of 12
2004124,190Not reported12 of 12
2005147,557Not reported12 of 12
2006176,823Not reported12 of 12
2007171,645Not reported12 of 12
2008178,741Not reported12 of 12
2009175,134Not reported12 of 12
2010167,80769.7%12 of 12
2011142,51359.2%12 of 12
2012107,92344.7%12 of 12
2013111,41446.2%12 of 12
201478,44748.5%8 of 12
2015136,21856.5%12 of 12
201647,29119.6%12 of 12
201790,38137.5%12 of 12
201829,20912.1%12 of 12
201923,1959.6%12 of 12
20209,3413.9%12 of 12
202139,86116.5%12 of 12
202222,2239.2%12 of 12
202313,4555.6%12 of 12
202450,62821.0%12 of 12
202542,62917.7%12 of 12
2026 (provisional, partial year)Not reportedNot reported0 of 7

* 2026 covers January to July and is provisional. Capacity factor is net generation divided by nameplate capacity times the hours of each reported month.

Power prices and basis

Free account · ISONE

Emissions

Free · EPA CAMPD

No EPA emissions units are linked to this plant.

Water use

Free · EIA-923 cooling, USGS

No EIA cooling-water record for this plant in 2024.

Generators

Free · EIA-860M
GeneratorTechnologyNameplate MWOnline since
GEN1Wood/Wood Waste Biomass27.5December 1987

Ownership and offtake

Pro
Pro

Ownership and offtake are part of Pro

Owners and their shares, parent companies, and power purchase agreements with their buyers. EIA-860M lists Stored Solar J&WE as the operator, which is not always the owner.

Modeled data

Pro

Pro adds modeled values for this plant. Everything above stays free.

Modeled

Generation potential vs reported

Monthly potential at seasonal net capability, next to EIA-923 output. Shows how much of the plant's capability was used.

Analyst and MCP

300 analyst questions a month, plus MCP

Query NE Renewable Power West Enfield and 14,224 other projects from Claude or your own tools. Free accounts get 1 question a day.

Power plants near NE Renewable Power West Enfield

Questions about NE Renewable Power West Enfield

How much power does NE Renewable Power West Enfield produce?

NE Renewable Power West Enfield reported 42,629 MWh (42.6 GWh) of net generation in 2025, a 17.7% capacity factor on 27.5 MW of nameplate capacity.

Where is NE Renewable Power West Enfield?

NE Renewable Power West Enfield is in Penobscot County, Maine, at 45.2537, −68.6279. It is in the ISO New England Inc. balancing area (ISNE).

Who operates NE Renewable Power West Enfield?

EIA-860M for August 2026 lists Stored Solar J&WE as the operator (EIA operator ID 62815). The operator is not always the owner.

When did NE Renewable Power West Enfield start operating?

Its first generator began operating in December 1987, according to EIA-860M.

Does InfraMap have power prices for NE Renewable Power West Enfield?

Yes. InfraMap has ISONE day-ahead and real-time prices at 1 price node linked to NE Renewable Power West Enfield, with the hub price and node-to-hub basis. Prices are free with an InfraMap account; pricing node names are part of InfraMap Pro.

Sources

  • EIA-860 2025 (final) and EIA-860M August 2026: plant, generators, capacity, operator and location
  • EIA-923 monthly net generation, 2000 to July 2026 (2026 provisional)
  • ISONE day-ahead and real-time prices; node and hub assignments as of 2026-10-05
  • Plant names from OpenStreetMap, © OpenStreetMap contributors (ODbL)

Page updated 2026-10-04 from the InfraMap data build. Methodology · Data sources · EIA plant page