OilOperatingSPP

Baldwin City Plant No 1

Oil power plant in Douglas County, Kansas. 4.2 MW of nameplate capacity across 3 generators, operated by City of Baldwin City- (KS).

Also known as EIA plant 1262

Analyst: free account, 1 question a day.

West GardnerOttawaKansas River ProjectGardner Energy CenterLawrence Energy CenterBaldwin City Plant No 110 km
Open in the map
6 plants within 27 km, from EIA coordinates.

Key facts

Capacity
4.2 MWNameplate
Generators
3 operatingEIA-860M, August 2026
Operating since
October 1964First generator online
Operator
City of Baldwin City- (KS)EIA operator ID 1148
Grid
SPPBalancing authority SWPP
Price nodes
None linkedNo verified ISO node
Location
Douglas County, KS38.7745, −95.1867
EIA plant ID
1262EIA plant page

Data as of EIA-860M August 2026 (published 2026-09-24). Capacity is nameplate, not live output.

How much power Baldwin City Plant No 1 produces

Free · EIA-923

Net generation, 2025

13 MWh

13 MWh, final

Capacity factor, 2025

0.0%

2024: 0.0%

January to July 2026

Not reported

Provisional. 0 of 7 months reported

Range, 2015 to 2025

12.0–62.0

MWh a year. Low 2024, high 2017

Annual net generation, MWhCapacity factor below each year
Annual net generation from EIA-923
YearNet generation, MWhCapacity factorMonths reported
20000Not reported12 of 12
2001179Not reported12 of 12
2002183Not reported12 of 12
2003135Not reported12 of 12
200445Not reported12 of 12
200597Not reported12 of 12
200667Not reported12 of 12
200749Not reported12 of 12
200872Not reported12 of 12
200938Not reported12 of 12
2010410.1%12 of 12
2011510.1%12 of 12
2012480.1%12 of 12
2013510.1%12 of 12
2014380.1%12 of 12
2015590.1%12 of 12
2016530.1%12 of 12
201762Not reported12 of 12
2018430.1%12 of 12
2019310.1%12 of 12
2020350.1%12 of 12
2021280.1%12 of 12
2022170.0%12 of 12
2023190.1%12 of 12
2024120.0%12 of 12
2025130.0%12 of 12
2026 (provisional, partial year)Not reportedNot reported0 of 7

* 2026 covers January to July and is provisional. Capacity factor is net generation divided by nameplate capacity times the hours of each reported month.

Power prices and basis

Free account

No verified ISO price node is linked to this plant, or its price history could not load.

Emissions

Free · EPA CAMPD

No EPA emissions units are linked to this plant.

Water use

Free · EIA-923 cooling, USGS

No EIA cooling-water record for this plant in 2024.

Generators

Free · EIA-860M
GeneratorTechnologyNameplate MWOnline since
4Petroleum Liquids2.0May 1970
5Petroleum Liquids1.1October 1964
6Petroleum Liquids1.1October 1964

Ownership and offtake

Pro
Pro

Ownership and offtake are part of Pro

Owners and their shares, parent companies, and power purchase agreements with their buyers. EIA-860M lists City of Baldwin City- (KS) as the operator, which is not always the owner.

Modeled data

Pro

Pro adds modeled values for this plant. Everything above stays free.

Modeled

Generation potential vs reported

Monthly potential at seasonal net capability, next to EIA-923 output. Shows how much of the plant's capability was used.

Analyst and MCP

300 analyst questions a month, plus MCP

Query Baldwin City Plant No 1 and 14,224 other projects from Claude or your own tools. Free accounts get 1 question a day.

Power plants near Baldwin City Plant No 1

More plants operated by City of Baldwin City- (KS)

Questions about Baldwin City Plant No 1

How much power does Baldwin City Plant No 1 produce?

Baldwin City Plant No 1 reported 13 MWh (13 MWh) of net generation in 2025, a 0.0% capacity factor on 4.2 MW of nameplate capacity.

Where is Baldwin City Plant No 1?

Baldwin City Plant No 1 is in Douglas County, Kansas, at 38.7745, −95.1867. It is in the Southwest Power Pool balancing area (SWPP).

Who operates Baldwin City Plant No 1?

EIA-860M for August 2026 lists City of Baldwin City- (KS) as the operator (EIA operator ID 1148). The operator is not always the owner.

When did Baldwin City Plant No 1 start operating?

Its first generator began operating in October 1964, according to EIA-860M.

Sources

  • EIA-860 2025 (final) and EIA-860M August 2026: plant, generators, capacity, operator and location
  • EIA-923 monthly net generation, 2000 to July 2026 (2026 provisional)

Page updated 2026-10-04 from the InfraMap data build. Methodology · Data sources · EIA plant page