CoalOperatingLGEE

Mill Creek (KY)

Coal power plant in Jefferson County, Kentucky. 1,361.7 MW of nameplate capacity across 3 generators, operated by Louisville Gas & Electric Co.

Also known as Mill Creek Generating Station · EIA plant 1364

Analyst: free account, 1 question a day.

Cane RunPaddys RunLanesville Solar RESOhio FallsGreen River SolarHardin County LFGTEMill Creek (KY)20 km
Open in the map
6 plants within 40 km, from EIA coordinates.

Key facts

Capacity
1,361.7 MWNameplate
Generators
3 operatingEIA-860M, August 2026
Operating since
July 1974First generator online
Operator
Louisville Gas & Electric CoEIA operator ID 11249
Grid
LGEEBalancing authority LGEE
Price nodes
None linkedNo verified ISO node
Location
Jefferson County, KY38.0525, −85.9103
EIA plant ID
1364EIA plant page

Data as of EIA-860M August 2026 (published 2026-09-24). Capacity is nameplate, not live output.

How much power Mill Creek (KY) produces

Free · EIA-923

Net generation, 2025

7.18 TWh

7,183,287 MWh, final

Capacity factor, 2025

60.2%

2024: Not reported

January to July 2026

4.17 TWh

Provisional

Range, 2015 to 2025

6.6–8.9

TWh a year. Low 2020, high 2017

Annual net generation, TWhCapacity factor below each year
Annual net generation from EIA-923
YearNet generation, MWhCapacity factorMonths reported
20009,033,702Not reported12 of 12
20018,882,437Not reported12 of 12
20029,075,622Not reported12 of 12
20039,348,954Not reported12 of 12
20049,587,102Not reported12 of 12
200510,115,227Not reported12 of 12
20069,804,862Not reported12 of 12
20076,120,776Not reported7 of 12
200810,416,132Not reported12 of 12
200910,374,395Not reported12 of 12
201010,373,56369.0%12 of 12
20119,061,57360.2%12 of 12
2012602,36348.7%1 of 12
20138,286,91355.1%12 of 12
20148,715,10957.9%12 of 12
20157,935,22452.8%12 of 12
20167,930,42652.6%12 of 12
20178,862,65058.9%12 of 12
2018819,07366.2%1 of 12
2019823,22264.4%1 of 12
20206,647,969Not reported12 of 12
20217,403,79949.2%12 of 12
20227,312,010Not reported12 of 12
20237,540,56550.1%12 of 12
20246,930,258Not reported12 of 12
20257,183,28760.2%12 of 12
2026 (provisional, partial year)4,169,92560.2%7 of 7

* 2026 covers January to July and is provisional. Capacity factor is net generation divided by nameplate capacity times the hours of each reported month.

Power prices and basis

Free account

No verified ISO price node is linked to this plant, or its price history could not load.

Emissions

Free · EPA CAMPD

CO₂, 2025

7.61M

US short tons. 2024: 7.40M

SO₂, 2025

3,594

US short tons

NOx, 2025

5,504

US short tons

CO₂ per MWh, calculated

1.06 t

About 2,118 lb per MWh

3 of 3 EPA units reported CO₂ in 2025 (1, 2, 3, 4), matched to EIA plant 1364 through the EPA–EIA crosswalk. The per-MWh rate is EPA CO₂ divided by EIA-923 net generation. The two reporting boundaries can differ.

Water use

Free · EIA-923 cooling, USGS

Withdrawal, 2024

64,158

million gallons

Consumption, 2024

3,877

million gallons

Source

Ohio River

Surface, Fresh. Once-through

Watershed stress

Very low/none · 0.126

USGS SUI, HUC12 Brier Creek-Pond Creek

48 of 48 cooling months report withdrawal. SUI of the source river HUC12 within 3 km. Blank volumes are unreported, not zero.

Generators

Free · EIA-860M
GeneratorTechnologyNameplate MWOnline since
2Conventional Steam Coal355.5July 1974
3Conventional Steam Coal462.6August 1978
4Conventional Steam Coal543.6September 1982

Ownership and offtake

Pro
Pro

Ownership and offtake are part of Pro

Owners and their shares, parent companies, and power purchase agreements with their buyers. EIA-860M lists Louisville Gas & Electric Co as the operator, which is not always the owner.

Modeled data

Pro

Pro adds modeled values for this plant. Everything above stays free.

Modeled

Generation potential vs reported

Monthly potential at seasonal net capability, next to EIA-923 output. Shows how much of the plant's capability was used.

Analyst and MCP

300 analyst questions a month, plus MCP

Query Mill Creek (KY) and 14,224 other projects from Claude or your own tools. Free accounts get 1 question a day.

Power plants near Mill Creek (KY)

More plants operated by Louisville Gas & Electric Co

Questions about Mill Creek (KY)

How much power does Mill Creek (KY) produce?

Mill Creek (KY) reported 7,183,287 MWh (7.18 TWh) of net generation in 2025, a 60.2% capacity factor on 1,361.7 MW of nameplate capacity. From January to July 2026 it reported 4.17 TWh, which is provisional.

Where is Mill Creek (KY)?

Mill Creek (KY) is in Jefferson County, Kentucky, at 38.0525, −85.9103. It is in the Louisville Gas and Electric Company and Kentucky Utilities Company balancing area (LGEE).

Who operates Mill Creek (KY)?

EIA-860M for August 2026 lists Louisville Gas & Electric Co as the operator (EIA operator ID 11249). The operator is not always the owner.

When did Mill Creek (KY) start operating?

Its first generator began operating in July 1974, according to EIA-860M.

Sources

  • EIA-860 2025 (final) and EIA-860M August 2026: plant, generators, capacity, operator and location
  • EIA-923 monthly net generation, 2000 to July 2026 (2026 provisional)
  • EPA CAMPD annual emissions through the EPA–EIA crosswalk, 1995 to 2025
  • EIA-923 cooling water 2024 and the USGS surface water supply and use index, Water years 2010-2020 (Oct 2009 to Sep 2020), mean of monthly values
  • Plant names from OpenStreetMap, © OpenStreetMap contributors (ODbL)

Page updated 2026-10-04 from the InfraMap data build. Methodology · Data sources · EIA plant page