R S Nelson

Coal and natural gas power plant in Calcasieu Parish, Louisiana. 1,433.6 MW of nameplate capacity across 4 generators, operated by Entergy Louisiana LLC.

Also known as Roy S. Nelson Generating Plant · R.S. Nelson · RS Nelson · EIA plant 1393

Analyst: free account, 1 question a day.

Lake Charles PowerPPG Powerhouse CRS CogenR S Nelson2 km
Open in the map
5 plants within 7.1 km, from EIA coordinates.

Key facts

Capacity
1,433.6 MWCoal 614.6 · Natural gas 591.8 · Petroleum coke 227.2
Generators
4 operatingEIA-860M, August 2026
Operating since
February 1959First generator online
Operator
Entergy Louisiana LLCEIA operator ID 11241
Grid
MISOBalancing authority MISO
Price nodes
1 MISO nodeResource nodes with prices
Location
Calcasieu Parish, LA30.2844, −93.2911
EIA plant ID
1393EIA plant page

Data as of EIA-860M August 2026 (published 2026-09-24). Capacity is nameplate, not live output.

How much power R S Nelson produces

Free · EIA-923

Net generation, 2025

1.98 TWh

1,982,885 MWh, final

Capacity factor, 2025

15.8%

2024: 11.7%

January to July 2026

1.54 TWh

Provisional

Range, 2015 to 2025

1.5–4.3

TWh a year. Low 2024, high 2018

Annual net generation, TWhCapacity factor below each year
Annual net generation from EIA-923
YearNet generation, MWhCapacity factorMonths reported
20006,228,444Not reported12 of 12
20015,721,980Not reported12 of 12
20027,579,841Not reported12 of 12
20034,622,615Not reported12 of 12
20046,891,379Not reported12 of 12
20056,069,600Not reported12 of 12
20066,094,581Not reported12 of 12
20072,805,730Not reported6 of 12
20086,748,186Not reported12 of 12
20096,067,735Not reported12 of 12
20105,848,40141.8%12 of 12
20116,790,96148.5%12 of 12
20126,212,24244.3%12 of 12
20136,069,25043.4%12 of 12
20145,023,29135.9%12 of 12
20154,035,70028.9%12 of 12
20164,148,85029.6%12 of 12
20174,279,702Not reported12 of 12
20184,283,30834.1%12 of 12
20193,211,24825.6%12 of 12
20202,077,11816.5%12 of 12
20212,862,05822.8%12 of 12
20223,274,61326.1%12 of 12
20231,740,15313.9%12 of 12
20241,475,44211.7%12 of 12
20251,982,88515.8%12 of 12
2026 (provisional, partial year)1,538,26121.1%7 of 7

* 2026 covers January to July and is provisional. Capacity factor is net generation divided by nameplate capacity times the hours of each reported month.

Power prices and basis

Free account · MISO

Emissions

Free · EPA CAMPD

CO₂, 2023

Not reported

US short tons. 2022: Not reported

SO₂, 2023

Not reported

US short tons

NOx, 2023

1,545

US short tons

1 of 3 EPA units reported CO₂ in 2023 (4, 6, 1A, 2A), matched to EIA plant 1393 through the EPA–EIA crosswalk.

Water use

Free · EIA-923 cooling, USGS

Withdrawal, 2024

194

million gallons

Consumption, 2024

165

million gallons

Source

Sabine River Authority Canal

Surface, Fresh. Induced-draft tower

Watershed stress

Low · 0.212

USGS SUI, HUC12 Richards Lake-Houston River

48 of 48 cooling months report withdrawal. SUI of the HUC12 containing the plant. Blank volumes are unreported, not zero.

Generators

Free · EIA-860M
GeneratorTechnologyNameplate MWOnline since
1Petroleum Coke113.6February 1959
2Petroleum Coke113.6May 1959
4Natural Gas Steam Turbine591.8July 1970
6Conventional Steam Coal614.6May 1982

Ownership and offtake

Pro
Pro

Ownership and offtake are part of Pro

Owners and their shares, parent companies, and power purchase agreements with their buyers. EIA-860M lists Entergy Louisiana LLC as the operator, which is not always the owner.

Modeled data

Pro

Pro adds modeled values for this plant. Everything above stays free.

Modeled

Generation potential vs reported

Monthly potential at seasonal net capability, next to EIA-923 output. Shows how much of the plant's capability was used.

Analyst and MCP

300 analyst questions a month, plus MCP

Query R S Nelson and 14,224 other projects from Claude or your own tools. Free accounts get 1 question a day.

Power plants near R S Nelson

More plants operated by Entergy Louisiana LLC

Questions about R S Nelson

How much power does R S Nelson produce?

R S Nelson reported 1,982,885 MWh (1.98 TWh) of net generation in 2025, a 15.8% capacity factor on 1,433.6 MW of nameplate capacity. From January to July 2026 it reported 1.54 TWh, which is provisional.

Where is R S Nelson?

R S Nelson is in Calcasieu Parish, Louisiana, at 30.2844, −93.2911. It is in the Midcontinent Independent Transmission System Operator, Inc.. balancing area (MISO).

Who operates R S Nelson?

EIA-860M for August 2026 lists Entergy Louisiana LLC as the operator (EIA operator ID 11241). The operator is not always the owner.

Is R S Nelson a coal or a natural gas plant?

Both. Coal capacity totals 614.6 MW and natural gas capacity totals 591.8 MW, with 227.2 MW of petroleum coke.

When did R S Nelson start operating?

Its first generator began operating in February 1959, according to EIA-860M.

Does InfraMap have power prices for R S Nelson?

Yes. InfraMap has MISO day-ahead and real-time prices at 1 price node linked to R S Nelson, with the hub price and node-to-hub basis. Prices are free with an InfraMap account; pricing node names are part of InfraMap Pro.

Sources

  • EIA-860 2025 (final) and EIA-860M August 2026: plant, generators, capacity, operator and location
  • EIA-923 monthly net generation, 2000 to July 2026 (2026 provisional)
  • EPA CAMPD annual emissions through the EPA–EIA crosswalk, 1995 to 2025
  • MISO day-ahead and real-time prices; node and hub assignments as of 2026-10-05
  • EIA-923 cooling water 2024 and the USGS surface water supply and use index, Water years 2010-2020 (Oct 2009 to Sep 2020), mean of monthly values
  • Plant names from OpenStreetMap, © OpenStreetMap contributors (ODbL)

Page updated 2026-10-04 from the InfraMap data build. Methodology · Data sources · EIA plant page