Perryman

Natural gas and oil power plant in Harford County, Maryland. 492.3 MW of nameplate capacity across 5 generators, operated by Constellation Power Source Generation, LLC.

Also known as Perryman Generating Station · EIA plant 1556

Analyst: free account, 1 question a day.

Archdiocese of Baltimore JArchdiocese of Baltim…Baltimore City BPerryman500 m
Open in the map
6 plants within 775 m, from EIA coordinates.

Key facts

Capacity
492.3 MWNatural gas 333.0 · Oil 159.3
Generators
5 operatingEIA-860M, August 2026
Operating since
January 1972First generator online
Operator
Constellation Power Source Generation, LLCEIA operator ID 4161
Grid
PJMBalancing authority PJM
Price nodes
5 PJM nodesResource nodes with prices
Location
Harford County, MD39.4428, −76.2218
EIA plant ID
1556EIA plant page

Data as of EIA-860M August 2026 (published 2026-09-24). Capacity is nameplate, not live output.

How much power Perryman produces

Free · EIA-923

Net generation, 2025

251 GWh

250,760 MWh, final

Capacity factor, 2025

5.8%

2024: 3.5%

January to July 2026

270 GWh

Provisional

Range, 2015 to 2025

152.4–552.8

GWh a year. Low 2024, high 2016

Annual net generation, GWhCapacity factor below each year
Annual net generation from EIA-923
YearNet generation, MWhCapacity factorMonths reported
2000151,253Not reported12 of 12
2001301,949Not reported12 of 12
2002181,420Not reported12 of 12
2003105,097Not reported11 of 12
2004137,983Not reported12 of 12
2005127,437Not reported12 of 12
200672,169Not reported12 of 12
200753,999Not reported12 of 12
200874,676Not reported12 of 12
200955,496Not reported12 of 12
201069,4642.0%12 of 12
201166,1011.9%12 of 12
2012101,9632.9%12 of 12
201393,2872.6%12 of 12
2014116,8703.3%12 of 12
2015430,179Not reported12 of 12
2016552,786Not reported12 of 12
2017228,4365.3%12 of 12
2018270,9546.8%11 of 12
2019203,1024.7%12 of 12
2020193,5474.9%11 of 12
2021239,9365.6%12 of 12
2022329,7947.6%12 of 12
2023246,8645.7%12 of 12
2024152,3863.5%12 of 12
2025250,7605.8%12 of 12
2026 (provisional, partial year)270,31210.8%7 of 7

* 2026 covers January to July and is provisional. Capacity factor is net generation divided by nameplate capacity times the hours of each reported month.

Power prices and basis

Free account · PJM

Emissions

Free · EPA CAMPD

CO₂, 2025

178,570

US short tons. 2024: Not reported

SO₂, 2025

1

US short tons

NOx, 2025

138

US short tons

CO₂ per MWh, calculated

0.71 t

About 1,424 lb per MWh

6 of 6 EPA units reported CO₂ in 2025 (**51, 6-1, 6-2, CT1, CT2, CT3, CT4), matched to EIA plant 1556 through the EPA–EIA crosswalk. The per-MWh rate is EPA CO₂ divided by EIA-923 net generation. The two reporting boundaries can differ.

Water use

Free · EIA-923 cooling, USGS

No EIA cooling-water record for this plant in 2024.

Generators

Free · EIA-860M
GeneratorTechnologyNameplate MWOnline since
GT1Petroleum Liquids53.1January 1972
GT3Petroleum Liquids53.1April 1972
GT4Petroleum Liquids53.1April 1972
GT5Natural Gas Fired Combustion Turbine192.0June 1995
GT6Natural Gas Fired Combustion Turbine141.0June 2015

Ownership and offtake

Pro
Pro

Ownership and offtake are part of Pro

Owners and their shares, parent companies, and power purchase agreements with their buyers. EIA-860M lists Constellation Power Source Generation, LLC as the operator, which is not always the owner.

Modeled data

Pro

Pro adds modeled values for this plant. Everything above stays free.

Modeled

Generation potential vs reported

Monthly potential at seasonal net capability, next to EIA-923 output. Shows how much of the plant's capability was used.

Analyst and MCP

300 analyst questions a month, plus MCP

Query Perryman and 14,224 other projects from Claude or your own tools. Free accounts get 1 question a day.

Power plants near Perryman

More plants operated by Constellation Power Source Generation, LLC

Questions about Perryman

How much power does Perryman produce?

Perryman reported 250,760 MWh (251 GWh) of net generation in 2025, a 5.8% capacity factor on 492.3 MW of nameplate capacity. From January to July 2026 it reported 270 GWh, which is provisional.

Where is Perryman?

Perryman is in Harford County, Maryland, at 39.4428, −76.2218. It is in the PJM Interconnection, LLC balancing area (PJM).

Who operates Perryman?

EIA-860M for August 2026 lists Constellation Power Source Generation, LLC as the operator (EIA operator ID 4161). The operator is not always the owner.

Is Perryman a natural gas or a oil plant?

Both. Natural gas capacity totals 333 MW and oil capacity totals 159.3 MW.

When did Perryman start operating?

Its first generator began operating in January 1972, according to EIA-860M.

Does InfraMap have power prices for Perryman?

Yes. InfraMap has PJM day-ahead and real-time prices at 5 price nodes linked to Perryman, with the hub price and node-to-hub basis. Prices are free with an InfraMap account; pricing node names are part of InfraMap Pro.

Sources

  • EIA-860 2025 (final) and EIA-860M August 2026: plant, generators, capacity, operator and location
  • EIA-923 monthly net generation, 2000 to July 2026 (2026 provisional)
  • EPA CAMPD annual emissions through the EPA–EIA crosswalk, 1995 to 2025
  • PJM day-ahead and real-time prices; node and hub assignments as of 2026-10-05
  • Plant names from OpenStreetMap, © OpenStreetMap contributors (ODbL)

Page updated 2026-10-04 from the InfraMap data build. Methodology · Data sources · EIA plant page