OilOperatingISO-NE

Exelon Framingham LLC

Oil power plant in Norfolk County, Massachusetts. 42.6 MW of nameplate capacity across 3 generators, operated by Constellation Power, Inc.

Also known as Exelon Framingham · EIA plant 1586

Analyst: free account, 1 question a day.

Centaurus Solar - MANatick MallHolliston LLCAshland SolarExelon Framingham2 km
Open in the map
6 plants within 6.5 km, from EIA coordinates.

Key facts

Capacity
42.6 MWNameplate
Generators
3 operatingEIA-860M, August 2026
Operating since
September 1969First generator online
Operator
Constellation Power, IncEIA operator ID 6035
Grid
ISO-NEBalancing authority ISNE
Price nodes
3 ISONE nodesResource nodes with prices
Location
Norfolk County, MA42.2672, −71.3983
EIA plant ID
1586EIA plant page

Data as of EIA-860M August 2026 (published 2026-09-24). Capacity is nameplate, not live output.

How much power Exelon Framingham produces

Free · EIA-923

Net generation, 2025

1.17 GWh

1,174 MWh, final

Capacity factor, 2025

0.3%

2024: 0.1%

January to July 2026

Not reported

Provisional. 0 of 7 months reported

Range, 2015 to 2025

0.3–1.2

GWh a year. Low 2024, high 2015

Annual net generation, GWhCapacity factor below each year
Annual net generation from EIA-923
YearNet generation, MWhCapacity factorMonths reported
2000Not reportedNot reported0 of 12
2001660Not reported12 of 12
20022,684Not reported12 of 12
20031,168Not reported9 of 12
2004Not reportedNot reported0 of 12
2005959Not reported12 of 12
2006798Not reported12 of 12
2007318Not reported12 of 12
2008475Not reported12 of 12
2009483Not reported12 of 12
20105480.1%12 of 12
20116640.2%12 of 12
20122750.1%12 of 12
20138970.2%12 of 12
20142,7690.7%12 of 12
20151,2230.3%12 of 12
20168080.2%12 of 12
20179640.3%12 of 12
20185160.1%12 of 12
20194020.1%12 of 12
20207430.2%12 of 12
20215990.2%12 of 12
20229150.2%12 of 12
20237920.2%12 of 12
20242730.1%12 of 12
20251,1740.3%12 of 12
2026 (provisional, partial year)Not reportedNot reported0 of 7

* 2026 covers January to July and is provisional. Capacity factor is net generation divided by nameplate capacity times the hours of each reported month.

Power prices and basis

Free account · ISONE

Emissions

Free · EPA CAMPD

CO₂, 2025

Not reported

US short tons. 2024: Not reported

SO₂, 2025

Not reported

US short tons

NOx, 2025

5

US short tons

0 of 3 EPA units reported CO₂ in 2025 (FJ-1, FJ-2, FJ-3), matched to EIA plant 1586 through the EPA–EIA crosswalk.

Water use

Free · EIA-923 cooling, USGS

No EIA cooling-water record for this plant in 2024.

Generators

Free · EIA-860M
GeneratorTechnologyNameplate MWOnline since
GT1Petroleum Liquids14.2March 1970
GT2Petroleum Liquids14.2September 1969
GT3Petroleum Liquids14.2September 1969

Ownership and offtake

Pro
Pro

Ownership and offtake are part of Pro

Owners and their shares, parent companies, and power purchase agreements with their buyers. EIA-860M lists Constellation Power, Inc as the operator, which is not always the owner.

Modeled data

Pro

Pro adds modeled values for this plant. Everything above stays free.

Modeled

Generation potential vs reported

Monthly potential at seasonal net capability, next to EIA-923 output. Shows how much of the plant's capability was used.

Analyst and MCP

300 analyst questions a month, plus MCP

Query Exelon Framingham LLC and 14,224 other projects from Claude or your own tools. Free accounts get 1 question a day.

Power plants near Exelon Framingham

More plants operated by Constellation Power, Inc

Questions about Exelon Framingham

How much power does Exelon Framingham LLC produce?

Exelon Framingham LLC reported 1,174 MWh (1.17 GWh) of net generation in 2025, a 0.3% capacity factor on 42.6 MW of nameplate capacity.

Where is Exelon Framingham LLC?

Exelon Framingham LLC is in Norfolk County, Massachusetts, at 42.2672, −71.3983. It is in the ISO New England Inc. balancing area (ISNE).

Who operates Exelon Framingham LLC?

EIA-860M for August 2026 lists Constellation Power, Inc as the operator (EIA operator ID 6035). The operator is not always the owner.

When did Exelon Framingham LLC start operating?

Its first generator began operating in September 1969, according to EIA-860M.

Does InfraMap have power prices for Exelon Framingham LLC?

Yes. InfraMap has ISONE day-ahead and real-time prices at 3 price nodes linked to Exelon Framingham LLC, with the hub price and node-to-hub basis. Prices are free with an InfraMap account; pricing node names are part of InfraMap Pro.

Sources

  • EIA-860 2025 (final) and EIA-860M August 2026: plant, generators, capacity, operator and location
  • EIA-923 monthly net generation, 2000 to July 2026 (2026 provisional)
  • EPA CAMPD annual emissions through the EPA–EIA crosswalk, 1995 to 2025
  • ISONE day-ahead and real-time prices; node and hub assignments as of 2026-10-05
  • Plant names from OpenStreetMap, © OpenStreetMap contributors (ODbL)

Page updated 2026-10-04 from the InfraMap data build. Methodology · Data sources · EIA plant page