Natural gasOperatingISO-NE

Waters River

Natural gas power plant in Essex County, Massachusetts. 43.6 MW of nameplate capacity across 1 generator, operated by City of Peabody - (MA).

Also known as Waters River Power Plant · EIA plant 1678

Analyst: free account, 1 question a day.

IXYS - BeverlySalem Harbor Power Development LPKearsarge 100 Sohier RdBeverlyWaters River2 km
Open in the map
6 plants within 5.4 km, from EIA coordinates.

Key facts

Capacity
43.6 MWNameplate
Generators
1 operatingEIA-860M, August 2026
Operating since
November 1990First generator online
Operator
City of Peabody - (MA)EIA operator ID 14605
Grid
ISO-NEBalancing authority ISNE
Price nodes
1 ISONE nodeResource nodes with prices
Location
Essex County, MA42.5429, −70.9283
EIA plant ID
1678EIA plant page

Data as of EIA-860M August 2026 (published 2026-09-24). Capacity is nameplate, not live output.

How much power Waters River produces

Free · EIA-923

Net generation, 2025

5.52 GWh

5,521 MWh, final

Capacity factor, 2025

1.0%

2024: 0.8%

January to July 2026

Not reported

Provisional. 0 of 7 months reported

Range, 2015 to 2025

2.2–14.3

GWh a year. Low 2019, high 2017

Annual net generation, GWhCapacity factor below each year
Annual net generation from EIA-923
YearNet generation, MWhCapacity factorMonths reported
200018,338Not reported12 of 12
200122,333Not reported12 of 12
200211,230Not reported12 of 12
20037,658Not reported11 of 12
20047,779Not reported12 of 12
200528,181Not reported12 of 12
200613,580Not reported12 of 12
20072,697Not reported12 of 12
200810,035Not reported12 of 12
20093,992Not reported12 of 12
201019,3593.4%12 of 12
201112,4492.2%12 of 12
201212,6502.2%12 of 12
20137,1521.3%12 of 12
201410,6471.9%12 of 12
201510,5781.9%12 of 12
20166,1321.1%12 of 12
201714,3062.5%12 of 12
20184,7600.8%12 of 12
20192,1730.4%12 of 12
20203,3030.6%12 of 12
20213,1240.5%12 of 12
20226,3181.1%12 of 12
20234,3140.8%12 of 12
20244,5840.8%12 of 12
20255,5211.0%12 of 12
2026 (provisional, partial year)Not reportedNot reported0 of 7

* 2026 covers January to July and is provisional. Capacity factor is net generation divided by nameplate capacity times the hours of each reported month.

Power prices and basis

Free account · ISONE

Emissions

Free · EPA CAMPD

CO₂, 2025

Not reported

US short tons. 2024: Not reported

SO₂, 2025

Not reported

US short tons

NOx, 2025

17

US short tons

1 of 2 EPA units reported CO₂ in 2025 (1, 2), matched to EIA plant 1678 through the EPA–EIA crosswalk.

Water use

Free · EIA-923 cooling, USGS

No EIA cooling-water record for this plant in 2024.

Generators

Free · EIA-860M
GeneratorTechnologyNameplate MWOnline since
2Natural Gas Fired Combustion Turbine43.6November 1990

Ownership and offtake

Pro
Pro

Ownership and offtake are part of Pro

Owners and their shares, parent companies, and power purchase agreements with their buyers. EIA-860M lists City of Peabody - (MA) as the operator, which is not always the owner.

Modeled data

Pro

Pro adds modeled values for this plant. Everything above stays free.

Modeled

Generation potential vs reported

Monthly potential at seasonal net capability, next to EIA-923 output. Shows how much of the plant's capability was used.

Analyst and MCP

300 analyst questions a month, plus MCP

Query Waters River and 14,224 other projects from Claude or your own tools. Free accounts get 1 question a day.

Power plants near Waters River

Questions about Waters River

How much power does Waters River produce?

Waters River reported 5,521 MWh (5.52 GWh) of net generation in 2025, a 1.0% capacity factor on 43.6 MW of nameplate capacity.

Where is Waters River?

Waters River is in Essex County, Massachusetts, at 42.5429, −70.9283. It is in the ISO New England Inc. balancing area (ISNE).

Who operates Waters River?

EIA-860M for August 2026 lists City of Peabody - (MA) as the operator (EIA operator ID 14605). The operator is not always the owner.

When did Waters River start operating?

Its first generator began operating in November 1990, according to EIA-860M.

Does InfraMap have power prices for Waters River?

Yes. InfraMap has ISONE day-ahead and real-time prices at 1 price node linked to Waters River, with the hub price and node-to-hub basis. Prices are free with an InfraMap account; pricing node names are part of InfraMap Pro.

Sources

  • EIA-860 2025 (final) and EIA-860M August 2026: plant, generators, capacity, operator and location
  • EIA-923 monthly net generation, 2000 to July 2026 (2026 provisional)
  • EPA CAMPD annual emissions through the EPA–EIA crosswalk, 1995 to 2025
  • ISONE day-ahead and real-time prices; node and hub assignments as of 2026-10-05
  • Plant names from OpenStreetMap, © OpenStreetMap contributors (ODbL)

Page updated 2026-10-04 from the InfraMap data build. Methodology · Data sources · EIA plant page