OilOperatingMISO

Ubly

Oil power plant in Huron County, Michigan. 12.4 MW of nameplate capacity across 9 generators, operated by Thumb Electric Coop of Mich.

Also known as EIA plant 1875

Analyst: free account, 1 question a day.

Michigan Wind 1Minden Wind ParkMichigan Wind 2Sigel Wind ParkBig Turtle Wind Farm, LLCHarvest 2Ubly10 km
Open in the map
6 plants within 24 km, from EIA coordinates.

Key facts

Capacity
12.4 MWNameplate
Generators
9 operatingEIA-860M, August 2026
Operating since
June 1938First generator online
Operator
Thumb Electric Coop of MichEIA operator ID 18895
Grid
MISOBalancing authority MISO
Price nodes
None linkedNo verified ISO node
Location
Huron County, MI43.7217, −82.9388
EIA plant ID
1875EIA plant page

Data as of EIA-860M August 2026 (published 2026-09-24). Capacity is nameplate, not live output.

How much power Ubly produces

Free · EIA-923

Net generation, 2025

0 MWh

0 MWh, final

Capacity factor, 2025

0.0%

2024: 0.0%

January to July 2026

Not reported

Provisional. 0 of 7 months reported

Range, 2015 to 2025

0.0–44.1

MWh a year. Low 2020, high 2017

Annual net generation, MWhCapacity factor below each year
Annual net generation from EIA-923
YearNet generation, MWhCapacity factorMonths reported
20000Not reported12 of 12
200154Not reported12 of 12
200263Not reported12 of 12
20032Not reported12 of 12
200416Not reported12 of 12
200511Not reported12 of 12
2006159Not reported12 of 12
2007−609Not reported12 of 12
20086Not reported12 of 12
200912Not reported12 of 12
2010100.0%12 of 12
201140.0%12 of 12
201290.0%12 of 12
201300.0%12 of 12
201410.0%12 of 12
2015200.0%12 of 12
201610Not reported12 of 12
2017440.0%12 of 12
2018230.0%12 of 12
2019110.0%12 of 12
202000.0%12 of 12
2021180.0%12 of 12
2022100.0%12 of 12
2023170.0%12 of 12
2024120.0%12 of 12
202500.0%12 of 12
2026 (provisional, partial year)Not reportedNot reported0 of 7

* 2026 covers January to July and is provisional. Capacity factor is net generation divided by nameplate capacity times the hours of each reported month.

Power prices and basis

Free account

No verified ISO price node is linked to this plant, or its price history could not load.

Emissions

Free · EPA CAMPD

No EPA emissions units are linked to this plant.

Water use

Free · EIA-923 cooling, USGS

No EIA cooling-water record for this plant in 2024.

Generators

Free · EIA-860M
GeneratorTechnologyNameplate MWOnline since
1Petroleum Liquids0.6June 1938
2Petroleum Liquids0.7June 1938
3Petroleum Liquids0.7June 1938
4Petroleum Liquids0.9August 1947
5Petroleum Liquids1.5October 1987
6Petroleum Liquids1.5November 1993
7Petroleum Liquids2.5May 2000
8Petroleum Liquids2.5October 2001
9Petroleum Liquids1.5August 2002

Ownership and offtake

Pro
Pro

Ownership and offtake are part of Pro

Owners and their shares, parent companies, and power purchase agreements with their buyers. EIA-860M lists Thumb Electric Coop of Mich as the operator, which is not always the owner.

Modeled data

Pro

Pro adds modeled values for this plant. Everything above stays free.

Modeled

Generation potential vs reported

Monthly potential at seasonal net capability, next to EIA-923 output. Shows how much of the plant's capability was used.

Analyst and MCP

300 analyst questions a month, plus MCP

Query Ubly and 14,224 other projects from Claude or your own tools. Free accounts get 1 question a day.

Power plants near Ubly

More plants operated by Thumb Electric Coop of Mich

Questions about Ubly

How much power does Ubly produce?

Ubly reported 0 MWh (0 MWh) of net generation in 2025.

Where is Ubly?

Ubly is in Huron County, Michigan, at 43.7217, −82.9388. It is in the Midcontinent Independent Transmission System Operator, Inc.. balancing area (MISO).

Who operates Ubly?

EIA-860M for August 2026 lists Thumb Electric Coop of Mich as the operator (EIA operator ID 18895). The operator is not always the owner.

When did Ubly start operating?

Its first generator began operating in June 1938, according to EIA-860M.

Sources

  • EIA-860 2025 (final) and EIA-860M August 2026: plant, generators, capacity, operator and location
  • EIA-923 monthly net generation, 2000 to July 2026 (2026 provisional)

Page updated 2026-10-04 from the InfraMap data build. Methodology · Data sources · EIA plant page