CoalOperatingMISO

Clay Boswell

Coal power plant in Itasca County, Minnesota. 922.5 MW of nameplate capacity across 2 generators, operated by ALLETE, Inc..

Also known as Clay Boswell Energy Center · EIA plant 1893

Analyst: free account, 1 question a day.

Rapids Energy CenterPrairie RiverHibbingClay Boswell25 km
Open in the map
4 plants within 57 km, from EIA coordinates.

Key facts

Capacity
922.5 MWNameplate
Generators
2 operatingEIA-860M, August 2026
Operating since
May 1973First generator online
Operator
ALLETE, Inc.EIA operator ID 12647
Grid
MISOBalancing authority MISO
Price nodes
3 MISO nodesResource nodes with prices
Location
Itasca County, MN47.2611, −93.6528
EIA plant ID
1893EIA plant page

Data as of EIA-860M August 2026 (published 2026-09-24). Capacity is nameplate, not live output.

How much power Clay Boswell produces

Free · EIA-923

Net generation, 2025

5.81 TWh

5,808,694 MWh, final

Capacity factor, 2025

71.8%

2024: 54.2%

January to July 2026

3.15 TWh

Provisional

Range, 2015 to 2025

4.2–7.5

TWh a year. Low 2020, high 2016

Annual net generation, TWhCapacity factor below each year
Annual net generation from EIA-923
YearNet generation, MWhCapacity factorMonths reported
20006,466,481Not reported12 of 12
20016,947,707Not reported12 of 12
20027,266,941Not reported12 of 12
20037,270,592Not reported12 of 12
20046,334,400Not reported12 of 12
20057,248,194Not reported12 of 12
20067,124,945Not reported12 of 12
20076,713,973Not reported12 of 12
20087,069,246Not reported12 of 12
20096,152,653Not reported12 of 12
20106,269,47466.7%12 of 12
20117,300,25477.6%12 of 12
20127,260,67777.0%12 of 12
20137,724,26182.2%12 of 12
20147,359,66178.3%12 of 12
20156,959,58074.0%12 of 12
20167,450,42379.0%12 of 12
20177,080,40775.3%12 of 12
20187,275,605Not reported12 of 12
2019833,841Not reported2 of 12
20204,203,37751.8%12 of 12
20215,046,58562.4%12 of 12
20225,121,336Not reported12 of 12
20235,042,11862.3%12 of 12
20244,397,72754.2%12 of 12
20255,808,69471.8%12 of 12
2026 (provisional, partial year)3,149,71667.0%7 of 7

* 2026 covers January to July and is provisional. Capacity factor is net generation divided by nameplate capacity times the hours of each reported month.

Power prices and basis

Free account · MISO

Emissions

Free · EPA CAMPD

CO₂, 2025

6.40M

US short tons. 2024: 4.98M

SO₂, 2025

588

US short tons

NOx, 2025

2,696

US short tons

CO₂ per MWh, calculated

1.10 t

About 2,202 lb per MWh

2 of 2 EPA units reported CO₂ in 2025 (1, 2, 3, 4), matched to EIA plant 1893 through the EPA–EIA crosswalk. The per-MWh rate is EPA CO₂ divided by EIA-923 net generation. The two reporting boundaries can differ.

Water use

Free · EIA-923 cooling, USGS

Withdrawal, 2024

1,723

million gallons

Consumption, 2024

1,216

million gallons

Source

North Blackwater Lake

Surface, Fresh. Induced-draft tower

Watershed stress

Very low/none · 0.146

USGS SUI, HUC12 Blackwater Lake-Mississippi River

24 of 24 cooling months report withdrawal. SUI of the HUC12 containing the plant. Blank volumes are unreported, not zero.

Generators

Free · EIA-860M
GeneratorTechnologyNameplate MWOnline since
3Conventional Steam Coal364.5May 1973
4Conventional Steam Coal558.0May 1980

Ownership and offtake

Pro
Pro

Ownership and offtake are part of Pro

Owners and their shares, parent companies, and power purchase agreements with their buyers. EIA-860M lists ALLETE, Inc. as the operator, which is not always the owner.

Modeled data

Pro

Pro adds modeled values for this plant. Everything above stays free.

Modeled

Generation potential vs reported

Monthly potential at seasonal net capability, next to EIA-923 output. Shows how much of the plant's capability was used.

Analyst and MCP

300 analyst questions a month, plus MCP

Query Clay Boswell and 14,224 other projects from Claude or your own tools. Free accounts get 1 question a day.

Power plants near Clay Boswell

More plants operated by ALLETE, Inc.

Questions about Clay Boswell

How much power does Clay Boswell produce?

Clay Boswell reported 5,808,694 MWh (5.81 TWh) of net generation in 2025, a 71.8% capacity factor on 922.5 MW of nameplate capacity. From January to July 2026 it reported 3.15 TWh, which is provisional.

Where is Clay Boswell?

Clay Boswell is in Itasca County, Minnesota, at 47.2611, −93.6528. It is in the Midcontinent Independent Transmission System Operator, Inc.. balancing area (MISO).

Who operates Clay Boswell?

EIA-860M for August 2026 lists ALLETE, Inc. as the operator (EIA operator ID 12647). The operator is not always the owner.

When did Clay Boswell start operating?

Its first generator began operating in May 1973, according to EIA-860M.

Does InfraMap have power prices for Clay Boswell?

Yes. InfraMap has MISO day-ahead and real-time prices at 3 price nodes linked to Clay Boswell, with the hub price and node-to-hub basis. Prices are free with an InfraMap account; pricing node names are part of InfraMap Pro.

Sources

  • EIA-860 2025 (final) and EIA-860M August 2026: plant, generators, capacity, operator and location
  • EIA-923 monthly net generation, 2000 to July 2026 (2026 provisional)
  • EPA CAMPD annual emissions through the EPA–EIA crosswalk, 1995 to 2025
  • MISO day-ahead and real-time prices; node and hub assignments as of 2026-10-05
  • EIA-923 cooling water 2024 and the USGS surface water supply and use index, Water years 2010-2020 (Oct 2009 to Sep 2020), mean of monthly values
  • Plant names from OpenStreetMap, © OpenStreetMap contributors (ODbL)

Page updated 2026-10-04 from the InfraMap data build. Methodology · Data sources · EIA plant page