OilOperatingMISO

Glencoe

Oil power plant in McLeod County, Minnesota. 39.5 MW of nameplate capacity across 8 generators, operated by Glencoe Light & Power Comm.

Also known as EIA plant 1975

Analyst: free account, 1 question a day.

Helen CSG 1 LLCSpruce Ridge Gas RecoveryUSS Water Fowl Solar LLC CSGErin Garden SolarGlencoe5 km
Open in the map
6 plants within 16 km, from EIA coordinates.

Key facts

Capacity
39.5 MWNameplate
Generators
8 operatingEIA-860M, August 2026
Operating since
June 1957First generator online
Operator
Glencoe Light & Power CommEIA operator ID 7292
Grid
MISOBalancing authority MISO
Price nodes
None linkedNo verified ISO node
Location
McLeod County, MN44.7709, −94.1582
EIA plant ID
1975EIA plant page

Data as of EIA-860M August 2026 (published 2026-09-24). Capacity is nameplate, not live output.

How much power Glencoe produces

Free · EIA-923

Net generation, 2025

146 MWh

146 MWh, final

Capacity factor, 2025

0.0%

2024: 0.1%

January to July 2026

Not reported

Provisional. 0 of 7 months reported

Range, 2015 to 2025

110.0–430.0

MWh a year. Low 2022, high 2021

Annual net generation, MWhCapacity factor below each year
Annual net generation from EIA-923
YearNet generation, MWhCapacity factorMonths reported
20000Not reported12 of 12
20012,491Not reported12 of 12
2002795Not reported12 of 12
20032,622Not reported12 of 12
2004621Not reported12 of 12
2005735Not reported12 of 12
2006809Not reported12 of 12
2007446Not reported12 of 12
200820Not reported12 of 12
2009133Not reported12 of 12
2010500.0%12 of 12
20111040.0%12 of 12
20121750.0%12 of 12
2013326Not reported12 of 12
20143420.1%12 of 12
20152800.1%12 of 12
20163480.1%12 of 12
20172910.1%12 of 12
20181650.0%12 of 12
20192610.1%12 of 12
20201570.0%12 of 12
20214300.1%12 of 12
20221100.0%12 of 12
20231110.0%12 of 12
20241820.1%12 of 12
20251460.0%12 of 12
2026 (provisional, partial year)Not reportedNot reported0 of 7

* 2026 covers January to July and is provisional. Capacity factor is net generation divided by nameplate capacity times the hours of each reported month.

Power prices and basis

Free account

No verified ISO price node is linked to this plant, or its price history could not load.

Emissions

Free · EPA CAMPD

No EPA emissions units are linked to this plant.

Water use

Free · EIA-923 cooling, USGS

No EIA cooling-water record for this plant in 2024.

Generators

Free · EIA-860M
GeneratorTechnologyNameplate MWOnline since
5Petroleum Liquids1.3June 1957
7Petroleum Liquids4.1November 1966
8Petroleum Liquids5.6July 1969
9Petroleum Liquids7.1August 1973
10Petroleum Liquids7.0October 1985
11Petroleum Liquids4.8June 1998
12Petroleum Liquids4.8July 1998
14Petroleum Liquids4.8September 2006

Ownership and offtake

Pro
Pro

Ownership and offtake are part of Pro

Owners and their shares, parent companies, and power purchase agreements with their buyers. EIA-860M lists Glencoe Light & Power Comm as the operator, which is not always the owner.

Modeled data

Pro

Pro adds modeled values for this plant. Everything above stays free.

Modeled

Generation potential vs reported

Monthly potential at seasonal net capability, next to EIA-923 output. Shows how much of the plant's capability was used.

Analyst and MCP

300 analyst questions a month, plus MCP

Query Glencoe and 14,224 other projects from Claude or your own tools. Free accounts get 1 question a day.

Power plants near Glencoe

Questions about Glencoe

How much power does Glencoe produce?

Glencoe reported 146 MWh (146 MWh) of net generation in 2025, a 0.0% capacity factor on 39.5 MW of nameplate capacity.

Where is Glencoe?

Glencoe is in McLeod County, Minnesota, at 44.7709, −94.1582. It is in the Midcontinent Independent Transmission System Operator, Inc.. balancing area (MISO).

Who operates Glencoe?

EIA-860M for August 2026 lists Glencoe Light & Power Comm as the operator (EIA operator ID 7292). The operator is not always the owner.

When did Glencoe start operating?

Its first generator began operating in June 1957, according to EIA-860M.

Sources

  • EIA-860 2025 (final) and EIA-860M August 2026: plant, generators, capacity, operator and location
  • EIA-923 monthly net generation, 2000 to July 2026 (2026 provisional)

Page updated 2026-10-04 from the InfraMap data build. Methodology · Data sources · EIA plant page