Natural gasOperatingSPP

Ralph Green

Natural gas power plant in Cass County, Missouri. 88.9 MW of nameplate capacity across 1 generator, operated by Evergy Missouri West.

Also known as Ralph Green Power Plant · EIA plant 2092

Analyst: free account, 1 question a day.

Dogwood Energy FacilityGreenwood (MO)South HarperHoldenIndependence II Solar FarmStation IRalph Green10 km
Open in the map
6 plants within 31 km, from EIA coordinates.

Key facts

Capacity
88.9 MWNameplate
Generators
1 operatingEIA-860M, August 2026
Operating since
June 1981First generator online
Operator
Evergy Missouri WestEIA operator ID 12698
Grid
SPPBalancing authority SWPP
Price nodes
1 SPP nodeResource nodes with prices
Location
Cass County, MO38.7876, −94.2777
EIA plant ID
2092EIA plant page

Data as of EIA-860M August 2026 (published 2026-09-24). Capacity is nameplate, not live output.

How much power Ralph Green produces

Free · EIA-923

Net generation, 2025

29.2 GWh

29,182 MWh, final

Capacity factor, 2025

3.7%

2024: 6.4%

January to July 2026

Not reported

Provisional. 0 of 7 months reported

Range, 2015 to 2025

4.3–49.9

GWh a year. Low 2017, high 2024

Annual net generation, GWhCapacity factor below each year
Annual net generation from EIA-923
YearNet generation, MWhCapacity factorMonths reported
200025,677Not reported12 of 12
200123,136Not reported12 of 12
200214,973Not reported12 of 12
20034,646Not reported10 of 12
20042,537Not reported12 of 12
20057,705Not reported12 of 12
200618,242Not reported12 of 12
200713,925Not reported12 of 12
20081,710Not reported12 of 12
2009−177Not reported12 of 12
20101220.0%12 of 12
20117910.1%12 of 12
2012−26-0.0%12 of 12
20133350.1%12 of 12
20148,1321.3%12 of 12
201513,3092.1%12 of 12
20166,9301.1%12 of 12
20174,2730.7%12 of 12
20186,509Not reported12 of 12
20198,0071.1%12 of 12
20209,7241.3%12 of 12
20216,7190.9%12 of 12
202224,7843.3%12 of 12
202338,390Not reported12 of 12
202449,9196.4%12 of 12
202529,1823.7%12 of 12
2026 (provisional, partial year)Not reportedNot reported0 of 7

* 2026 covers January to July and is provisional. Capacity factor is net generation divided by nameplate capacity times the hours of each reported month.

Power prices and basis

Free account · SPP

Emissions

Free · EPA CAMPD

CO₂, 2025

Not reported

US short tons. 2024: Not reported

SO₂, 2025

0

US short tons

NOx, 2025

81

US short tons

0 of 1 EPA units reported CO₂ in 2025 (3), matched to EIA plant 2092 through the EPA–EIA crosswalk.

Water use

Free · EIA-923 cooling, USGS

No EIA cooling-water record for this plant in 2024.

Generators

Free · EIA-860M
GeneratorTechnologyNameplate MWOnline since
3Natural Gas Fired Combustion Turbine88.9June 1981

Ownership and offtake

Pro
Pro

Ownership and offtake are part of Pro

Owners and their shares, parent companies, and power purchase agreements with their buyers. EIA-860M lists Evergy Missouri West as the operator, which is not always the owner.

Modeled data

Pro

Pro adds modeled values for this plant. Everything above stays free.

Modeled

Generation potential vs reported

Monthly potential at seasonal net capability, next to EIA-923 output. Shows how much of the plant's capability was used.

Analyst and MCP

300 analyst questions a month, plus MCP

Query Ralph Green and 14,224 other projects from Claude or your own tools. Free accounts get 1 question a day.

Power plants near Ralph Green

More plants operated by Evergy Missouri West

Questions about Ralph Green

How much power does Ralph Green produce?

Ralph Green reported 29,182 MWh (29.2 GWh) of net generation in 2025, a 3.7% capacity factor on 88.9 MW of nameplate capacity.

Where is Ralph Green?

Ralph Green is in Cass County, Missouri, at 38.7876, −94.2777. It is in the Southwest Power Pool balancing area (SWPP).

Who operates Ralph Green?

EIA-860M for August 2026 lists Evergy Missouri West as the operator (EIA operator ID 12698). The operator is not always the owner.

When did Ralph Green start operating?

Its first generator began operating in June 1981, according to EIA-860M.

Does InfraMap have power prices for Ralph Green?

Yes. InfraMap has SPP day-ahead and real-time prices at 1 price node linked to Ralph Green, with the hub price and node-to-hub basis. Prices are free with an InfraMap account; pricing node names are part of InfraMap Pro.

Sources

  • EIA-860 2025 (final) and EIA-860M August 2026: plant, generators, capacity, operator and location
  • EIA-923 monthly net generation, 2000 to July 2026 (2026 provisional)
  • EPA CAMPD annual emissions through the EPA–EIA crosswalk, 1995 to 2025
  • SPP day-ahead and real-time prices; node and hub assignments as of 2026-10-05
  • Plant names from OpenStreetMap, © OpenStreetMap contributors (ODbL)

Page updated 2026-10-04 from the InfraMap data build. Methodology · Data sources · EIA plant page