Natural gasOilOperatingSPP

Chillicothe

Natural gas power plant in Livingston County, Missouri. 90 MW of nameplate capacity across 7 generators, operated by Chillicothe Municipal Utils (MO).

Also known as Chillicothe Power Plant · EIA plant 2122

Analyst: free account, 1 question a day.

Trenton SouthTrenton NorthTrenton Solar Farm (MO)Adelite Solar, LLCChillicothe25 km
Open in the map
6 plants within 48 km, from EIA coordinates.

Key facts

Capacity
90 MWNatural gas 80.0 · Oil 10.0
Generators
7 operatingEIA-860M, August 2026
Operating since
June 1986First generator online
Operator
Chillicothe Municipal Utils (MO)EIA operator ID 3486
Grid
SPPBalancing authority SWPP
Price nodes
2 SPP nodesResource nodes with prices
Location
Livingston County, MO39.7834, −93.5641
EIA plant ID
2122EIA plant page

Data as of EIA-860M August 2026 (published 2026-09-24). Capacity is nameplate, not live output.

How much power Chillicothe produces

Free · EIA-923

Net generation, 2025

2.88 GWh

2,880 MWh, final

Capacity factor, 2025

0.4%

2024: Not reported

January to July 2026

Not reported

Provisional. 0 of 7 months reported

Range, 2015 to 2025

0.4–11.7

GWh a year. Low 2015, high 2022

Annual net generation, GWhCapacity factor below each year
Annual net generation from EIA-923
YearNet generation, MWhCapacity factorMonths reported
200022,575Not reported12 of 12
20019,270Not reported12 of 12
20021,279Not reported12 of 12
2003679Not reported5 of 12
2004293Not reported12 of 12
20052,101Not reported12 of 12
20061,006Not reported12 of 12
20071,643Not reported12 of 12
2008236Not reported12 of 12
20091,528Not reported12 of 12
20106070.1%12 of 12
20115120.1%12 of 12
20125030.1%12 of 12
20134050.1%12 of 12
20143940.0%12 of 12
20153960.1%12 of 12
20166030.1%12 of 12
2017540.1%1 of 12
20183,0200.4%12 of 12
20195,2160.7%12 of 12
2020740.1%1 of 12
20213,2330.4%12 of 12
202211,7321.5%12 of 12
20238,951Not reported12 of 12
20244,445Not reported12 of 12
20252,8800.4%12 of 12
2026 (provisional, partial year)Not reportedNot reported0 of 7

* 2026 covers January to July and is provisional. Capacity factor is net generation divided by nameplate capacity times the hours of each reported month.

Power prices and basis

Free account · SPP

Emissions

Free · EPA CAMPD

CO₂, 2020

Not reported

US short tons. 2019: Not reported

SO₂, 2020

0

US short tons

NOx, 2020

5

US short tons

0 of 4 EPA units reported CO₂ in 2020 (GT1A, GT1B, GT2A, GT2B), matched to EIA plant 2122 through the EPA–EIA crosswalk.

Water use

Free · EIA-923 cooling, USGS

No EIA cooling-water record for this plant in 2024.

Generators

Free · EIA-860M
GeneratorTechnologyNameplate MWOnline since
D1Petroleum Liquids2.0June 2003
D2Petroleum Liquids2.0June 2003
D3Petroleum Liquids2.0June 2003
D4Petroleum Liquids2.0June 2003
D5Petroleum Liquids2.0June 2003
GT1Natural Gas Fired Combustion Turbine40.0June 1986
GT2Natural Gas Fired Combustion Turbine40.0June 1986

Ownership and offtake

Pro
Pro

Ownership and offtake are part of Pro

Owners and their shares, parent companies, and power purchase agreements with their buyers. EIA-860M lists Chillicothe Municipal Utils (MO) as the operator, which is not always the owner.

Modeled data

Pro

Pro adds modeled values for this plant. Everything above stays free.

Modeled

Generation potential vs reported

Monthly potential at seasonal net capability, next to EIA-923 output. Shows how much of the plant's capability was used.

Analyst and MCP

300 analyst questions a month, plus MCP

Query Chillicothe and 14,224 other projects from Claude or your own tools. Free accounts get 1 question a day.

Power plants near Chillicothe

Questions about Chillicothe

How much power does Chillicothe produce?

Chillicothe reported 2,880 MWh (2.88 GWh) of net generation in 2025, a 0.4% capacity factor on 90 MW of nameplate capacity.

Where is Chillicothe?

Chillicothe is in Livingston County, Missouri, at 39.7834, −93.5641. It is in the Southwest Power Pool balancing area (SWPP).

Who operates Chillicothe?

EIA-860M for August 2026 lists Chillicothe Municipal Utils (MO) as the operator (EIA operator ID 3486). The operator is not always the owner.

When did Chillicothe start operating?

Its first generator began operating in June 1986, according to EIA-860M.

Does InfraMap have power prices for Chillicothe?

Yes. InfraMap has SPP day-ahead and real-time prices at 2 price nodes linked to Chillicothe, with the hub price and node-to-hub basis. Prices are free with an InfraMap account; pricing node names are part of InfraMap Pro.

Sources

  • EIA-860 2025 (final) and EIA-860M August 2026: plant, generators, capacity, operator and location
  • EIA-923 monthly net generation, 2000 to July 2026 (2026 provisional)
  • EPA CAMPD annual emissions through the EPA–EIA crosswalk, 1995 to 2025
  • SPP day-ahead and real-time prices; node and hub assignments as of 2026-10-05
  • Plant names from OpenStreetMap, © OpenStreetMap contributors (ODbL)

Page updated 2026-10-04 from the InfraMap data build. Methodology · Data sources · EIA plant page