Natural gasOperatingMISO

Glendive GT

Natural gas power plant in Dawson County, Montana. 83.7 MW of nameplate capacity across 2 generators, operated by Montana-Dakota Utilities Co.

Also known as Glendive GT Power Plant · EIA plant 2176

Analyst: free account, 1 question a day.

Glendive GT500 m
Open in the map
No other mapped plant within 60 km.

Key facts

Capacity
83.7 MWNameplate
Generators
2 operatingEIA-860M, August 2026
Operating since
June 1979First generator online
Operator
Montana-Dakota Utilities CoEIA operator ID 12199
Grid
MISOBalancing authority MISO
Price nodes
2 MISO nodesResource nodes with prices
Location
Dawson County, MT47.0539, −104.7400
EIA plant ID
2176EIA plant page

Data as of EIA-860M August 2026 (published 2026-09-24). Capacity is nameplate, not live output.

How much power Glendive GT produces

Free · EIA-923

Net generation, 2025

15.9 GWh

15,902 MWh, final

Capacity factor, 2025

2.2%

2024: 0.3%

January to July 2026

Not reported

Provisional. 0 of 7 months reported

Range, 2015 to 2025

−0.3–15.9

GWh a year. Low 2020, high 2025

Annual net generation, GWhCapacity factor below each year
Annual net generation from EIA-923
YearNet generation, MWhCapacity factorMonths reported
20009,975Not reported12 of 12
20017,366Not reported12 of 12
20024,458Not reported12 of 12
200316,344Not reported12 of 12
20049,656Not reported12 of 12
20058,628Not reported12 of 12
20066,512Not reported12 of 12
200712,687Not reported12 of 12
20083,218Not reported12 of 12
20091,949Not reported12 of 12
20106,9780.9%12 of 12
201115,4022.1%12 of 12
201210,5961.4%12 of 12
20131,782Not reported12 of 12
20141,9110.3%12 of 12
20151,2120.2%12 of 12
20166,2770.9%12 of 12
20171,9530.3%12 of 12
20181,8140.2%12 of 12
20191,4780.2%12 of 12
2020−254-0.0%12 of 12
202114,8632.0%12 of 12
20221,0800.1%12 of 12
20231,5410.2%12 of 12
20242,5600.3%12 of 12
202515,9022.2%12 of 12
2026 (provisional, partial year)Not reportedNot reported0 of 7

* 2026 covers January to July and is provisional. Capacity factor is net generation divided by nameplate capacity times the hours of each reported month.

Power prices and basis

Free account · MISO

Emissions

Free · EPA CAMPD

CO₂, 2025

17,775

US short tons. 2024: 2,116

SO₂, 2025

0

US short tons

NOx, 2025

26

US short tons

CO₂ per MWh, calculated

1.12 t

About 2,236 lb per MWh

1 of 1 EPA units reported CO₂ in 2025 (GT-2), matched to EIA plant 2176 through the EPA–EIA crosswalk. The per-MWh rate is EPA CO₂ divided by EIA-923 net generation. The two reporting boundaries can differ.

Water use

Free · EIA-923 cooling, USGS

No EIA cooling-water record for this plant in 2024.

Generators

Free · EIA-860M
GeneratorTechnologyNameplate MWOnline since
GT-2Natural Gas Fired Combustion Turbine43.0May 2003
GT1Natural Gas Fired Combustion Turbine40.7June 1979

Ownership and offtake

Pro
Pro

Ownership and offtake are part of Pro

Owners and their shares, parent companies, and power purchase agreements with their buyers. EIA-860M lists Montana-Dakota Utilities Co as the operator, which is not always the owner.

Modeled data

Pro

Pro adds modeled values for this plant. Everything above stays free.

Modeled

Generation potential vs reported

Monthly potential at seasonal net capability, next to EIA-923 output. Shows how much of the plant's capability was used.

Analyst and MCP

300 analyst questions a month, plus MCP

Query Glendive GT and 14,224 other projects from Claude or your own tools. Free accounts get 1 question a day.

Power plants near Glendive GT

More plants operated by Montana-Dakota Utilities Co

Questions about Glendive GT

How much power does Glendive GT produce?

Glendive GT reported 15,902 MWh (15.9 GWh) of net generation in 2025, a 2.2% capacity factor on 83.7 MW of nameplate capacity.

Where is Glendive GT?

Glendive GT is in Dawson County, Montana, at 47.0539, −104.7400. It is in the Midcontinent Independent Transmission System Operator, Inc.. balancing area (MISO).

Who operates Glendive GT?

EIA-860M for August 2026 lists Montana-Dakota Utilities Co as the operator (EIA operator ID 12199). The operator is not always the owner.

When did Glendive GT start operating?

Its first generator began operating in June 1979, according to EIA-860M.

Does InfraMap have power prices for Glendive GT?

Yes. InfraMap has MISO day-ahead and real-time prices at 2 price nodes linked to Glendive GT, with the hub price and node-to-hub basis. Prices are free with an InfraMap account; pricing node names are part of InfraMap Pro.

Sources

  • EIA-860 2025 (final) and EIA-860M August 2026: plant, generators, capacity, operator and location
  • EIA-923 monthly net generation, 2000 to July 2026 (2026 provisional)
  • EPA CAMPD annual emissions through the EPA–EIA crosswalk, 1995 to 2025
  • MISO day-ahead and real-time prices; node and hub assignments as of 2026-10-05
  • Plant names from OpenStreetMap, © OpenStreetMap contributors (ODbL)

Page updated 2026-10-04 from the InfraMap data build. Methodology · Data sources · EIA plant page