Natural gasOperatingSCEG

Parr GT

Natural gas power plant in Fairfield County, South Carolina. 130.8 MW of nameplate capacity across 2 generators, operated by Dominion Energy South Carolina, Inc.

Also known as EIA plant 3291

Analyst: free account, 1 question a day.

V C SummerFairfield Pumped StorageMidway Green SolarMcMeekinSaluda LexingtonParr GT10 km
Open in the map
6 plants within 26 km, from EIA coordinates.

Key facts

Capacity
130.8 MWNameplate
Generators
2 operatingEIA-860M, August 2026
Operating since
December 2025First generator online
Operator
Dominion Energy South Carolina, IncEIA operator ID 17539
Grid
SCEGBalancing authority SCEG
Price nodes
None linkedNo verified ISO node
Location
Fairfield County, SC34.2642, −81.3308
EIA plant ID
3291EIA plant page

Data as of EIA-860M August 2026 (published 2026-09-24). Capacity is nameplate, not live output.

How much power Parr GT produces

Free · EIA-923

Net generation, 2025

0 MWh

0 MWh, final. 1 of 12 months reported

Capacity factor, 2025

Not reported

2024: Not reported

January to July 2026

Not reported

Provisional. 0 of 7 months reported

Range, 2015 to 2024

0.0–7.3

GWh a year. Low 2024, high 2016

Annual net generation, GWhCapacity factor below each year
Annual net generation from EIA-923
YearNet generation, MWhCapacity factorMonths reported
20009,422Not reported12 of 12
20018,714Not reported12 of 12
20024,681Not reported12 of 12
20031,451Not reported12 of 12
20041,192Not reported12 of 12
20051,820Not reported12 of 12
20062,915Not reported12 of 12
200711,423Not reported12 of 12
20082,698Not reported12 of 12
20092,718Not reported12 of 12
20108,6971.3%12 of 12
20116,1030.9%12 of 12
201212,2081.9%12 of 12
20133,5610.5%12 of 12
20145,3030.8%12 of 12
20152,3110.4%12 of 12
20167,332Not reported12 of 12
20173,3090.5%12 of 12
20187,2751.0%12 of 12
20192,3860.3%12 of 12
20205,2560.7%12 of 12
20212,6120.4%12 of 12
20223,793Not reported12 of 12
2023199Not reported3 of 12
20240Not reported12 of 12
20250Not reported1 of 12
2026 (provisional, partial year)Not reportedNot reported0 of 7

* 2026 covers January to July and is provisional. Capacity factor is net generation divided by nameplate capacity times the hours of each reported month.

Power prices and basis

Free account

No verified ISO price node is linked to this plant, or its price history could not load.

Emissions

Free · EPA CAMPD

No EPA emissions units are linked to this plant.

Water use

Free · EIA-923 cooling, USGS

No EIA cooling-water record for this plant in 2024.

Generators

Free · EIA-860M
GeneratorTechnologyNameplate MWOnline since
GT5Natural Gas Fired Combustion Turbine65.4December 2025
GT6Natural Gas Fired Combustion Turbine65.4December 2025

Ownership and offtake

Pro
Pro

Ownership and offtake are part of Pro

Owners and their shares, parent companies, and power purchase agreements with their buyers. EIA-860M lists Dominion Energy South Carolina, Inc as the operator, which is not always the owner.

Modeled data

Pro

Pro adds modeled values for this plant. Everything above stays free.

Modeled

Generation potential vs reported

Monthly potential at seasonal net capability, next to EIA-923 output. Shows how much of the plant's capability was used.

Analyst and MCP

300 analyst questions a month, plus MCP

Query Parr GT and 14,224 other projects from Claude or your own tools. Free accounts get 1 question a day.

Power plants near Parr GT

More plants operated by Dominion Energy South Carolina, Inc

Questions about Parr GT

How much power does Parr GT produce?

Parr GT reported 0 MWh (0 MWh) of net generation in 2025. 1 of 12 months were reported for 2025.

Where is Parr GT?

Parr GT is in Fairfield County, South Carolina, at 34.2642, −81.3308. It is in the Dominion Energy South Carolina balancing area (SCEG).

Who operates Parr GT?

EIA-860M for August 2026 lists Dominion Energy South Carolina, Inc as the operator (EIA operator ID 17539). The operator is not always the owner.

When did Parr GT start operating?

Its first generator began operating in December 2025, according to EIA-860M.

Sources

  • EIA-860 2025 (final) and EIA-860M August 2026: plant, generators, capacity, operator and location
  • EIA-923 monthly net generation, 2000 to July 2026 (2026 provisional)

Page updated 2026-10-04 from the InfraMap data build. Methodology · Data sources · EIA plant page