Aberdeen CT

Natural gas and oil power plant in Brown County, South Dakota. 111 MW of nameplate capacity across 2 generators, operated by NorthWestern Energy - (SD).

Also known as Aberdeen CT Power Plant · EIA plant 3338

Analyst: free account, 1 question a day.

Groton Generation Sta…Day County Wind LLCRE Solar, LLCAberdeen CT25 km
Open in the map
3 plants within 56 km, from EIA coordinates.

Key facts

Capacity
111 MWNatural gas 82.2 · Oil 28.8
Generators
2 operatingEIA-860M, August 2026
Operating since
May 1978First generator online
Operator
NorthWestern Energy - (SD)EIA operator ID 13809
Grid
SPPBalancing authority SWPP
Price nodes
1 SPP nodeResource nodes with prices
Location
Brown County, SD45.4299, −98.4940
EIA plant ID
3338EIA plant page

Data as of EIA-860M August 2026 (published 2026-09-24). Capacity is nameplate, not live output.

How much power Aberdeen CT produces

Free · EIA-923

Net generation, 2025

56.2 GWh

56,170 MWh, final

Capacity factor, 2025

5.8%

2024: 3.0%

January to July 2026

Not reported

Provisional. 0 of 7 months reported

Range, 2015 to 2025

7.8–58.6

GWh a year. Low 2015, high 2022

Annual net generation, GWhCapacity factor below each year
Annual net generation from EIA-923
YearNet generation, MWhCapacity factorMonths reported
2000338Not reported12 of 12
20011,299Not reported12 of 12
2002293Not reported12 of 12
2003866Not reported12 of 12
200459Not reported12 of 12
2005159Not reported12 of 12
2006112Not reported12 of 12
200797Not reported12 of 12
20081,670Not reported12 of 12
2009889Not reported12 of 12
2010620.0%12 of 12
20114740.2%12 of 12
20122420.1%12 of 12
20138,040Not reported12 of 12
20144,0930.4%12 of 12
20157,7590.8%12 of 12
20169,0830.9%12 of 12
201710,3791.1%12 of 12
201836,6743.8%12 of 12
201943,9084.5%12 of 12
202031,6893.3%12 of 12
202151,4045.3%12 of 12
202258,6106.0%12 of 12
202339,5524.1%12 of 12
202429,6673.0%12 of 12
202556,1705.8%12 of 12
2026 (provisional, partial year)Not reportedNot reported0 of 7

* 2026 covers January to July and is provisional. Capacity factor is net generation divided by nameplate capacity times the hours of each reported month.

Power prices and basis

Free account · SPP

Emissions

Free · EPA CAMPD

CO₂, 2025

45,429

US short tons. 2024: 22,997

SO₂, 2025

0

US short tons

NOx, 2025

66

US short tons

CO₂ per MWh, calculated

0.81 t

About 1,618 lb per MWh

2 of 2 EPA units reported CO₂ in 2025 (2A, 2B), matched to EIA plant 3338 through the EPA–EIA crosswalk. The per-MWh rate is EPA CO₂ divided by EIA-923 net generation. The two reporting boundaries can differ.

Water use

Free · EIA-923 cooling, USGS

No EIA cooling-water record for this plant in 2024.

Generators

Free · EIA-860M
GeneratorTechnologyNameplate MWOnline since
2Natural Gas Fired Combustion Turbine82.2April 2013
GT1Petroleum Liquids28.8May 1978

Ownership and offtake

Pro
Pro

Ownership and offtake are part of Pro

Owners and their shares, parent companies, and power purchase agreements with their buyers. EIA-860M lists NorthWestern Energy - (SD) as the operator, which is not always the owner.

Modeled data

Pro

Pro adds modeled values for this plant. Everything above stays free.

Modeled

Generation potential vs reported

Monthly potential at seasonal net capability, next to EIA-923 output. Shows how much of the plant's capability was used.

Analyst and MCP

300 analyst questions a month, plus MCP

Query Aberdeen CT and 14,224 other projects from Claude or your own tools. Free accounts get 1 question a day.

Power plants near Aberdeen CT

More plants operated by NorthWestern Energy - (SD)

Questions about Aberdeen CT

How much power does Aberdeen CT produce?

Aberdeen CT reported 56,170 MWh (56.2 GWh) of net generation in 2025, a 5.8% capacity factor on 111 MW of nameplate capacity.

Where is Aberdeen CT?

Aberdeen CT is in Brown County, South Dakota, at 45.4299, −98.4940. It is in the Southwest Power Pool balancing area (SWPP).

Who operates Aberdeen CT?

EIA-860M for August 2026 lists NorthWestern Energy - (SD) as the operator (EIA operator ID 13809). The operator is not always the owner.

Is Aberdeen CT a natural gas or a oil plant?

Both. Natural gas capacity totals 82.2 MW and oil capacity totals 28.8 MW.

When did Aberdeen CT start operating?

Its first generator began operating in May 1978, according to EIA-860M.

Does InfraMap have power prices for Aberdeen CT?

Yes. InfraMap has SPP day-ahead and real-time prices at 1 price node linked to Aberdeen CT, with the hub price and node-to-hub basis. Prices are free with an InfraMap account; pricing node names are part of InfraMap Pro.

Sources

  • EIA-860 2025 (final) and EIA-860M August 2026: plant, generators, capacity, operator and location
  • EIA-923 monthly net generation, 2000 to July 2026 (2026 provisional)
  • EPA CAMPD annual emissions through the EPA–EIA crosswalk, 1995 to 2025
  • SPP day-ahead and real-time prices; node and hub assignments as of 2026-10-05
  • Plant names from OpenStreetMap, © OpenStreetMap contributors (ODbL)

Page updated 2026-10-04 from the InfraMap data build. Methodology · Data sources · EIA plant page