HydroOperatingGCPD

Wanapum

Hydro power plant in Grant County, Washington. 1,220 MW of nameplate capacity across 10 generators, operated by PUD No 2 of Grant County - (WA).

Also known as Wanapum Powerhouse · EIA plant 3888

Analyst: free account, 1 question a day.

Vantage Wind Energy LLCWild HorsePriest RapidsOstrea Solar, LLCWanapum25 km
Open in the map
6 plants within 42 km, from EIA coordinates.

Key facts

Capacity
1,220 MWNameplate
Generators
10 operatingEIA-860M, August 2026
Operating since
April 2011First generator online
Operator
PUD No 2 of Grant County - (WA)EIA operator ID 14624
Grid
GCPDBalancing authority GCPD
Price nodes
None linkedNo verified ISO node
Location
Grant County, WA46.8731, −119.9703
EIA plant ID
3888EIA plant page

Data as of EIA-860M August 2026 (published 2026-09-24). Capacity is nameplate, not live output.

How much power Wanapum produces

Free · EIA-923

Net generation, 2025

4.44 TWh

4,437,537 MWh, final

Capacity factor, 2025

41.5%

2024: 37.8%

January to July 2026

3.59 TWh

Provisional

Range, 2015 to 2025

4.1–5.4

TWh a year. Low 2024, high 2022

Annual net generation, TWhCapacity factor below each year
Annual net generation from EIA-923
YearNet generation, MWhCapacity factorMonths reported
20005,040,702Not reported12 of 12
20013,685,563Not reported12 of 12
20024,757,059Not reported12 of 12
20034,397,395Not reported12 of 12
20044,611,704Not reported12 of 12
20055,005,590Not reported12 of 12
20065,141,576Not reported12 of 12
20075,300,140Not reported12 of 12
20084,725,839Not reported12 of 12
20094,358,985Not reported12 of 12
20104,198,17146.2%12 of 12
20115,541,697Not reported12 of 12
20125,186,124Not reported12 of 12
20135,282,107Not reported12 of 12
20143,650,692Not reported12 of 12
20154,998,580Not reported12 of 12
20165,305,067Not reported12 of 12
20175,238,337Not reported12 of 12
20185,337,728Not reported12 of 12
20194,252,008Not reported12 of 12
20205,131,315Not reported12 of 12
20214,968,66246.5%12 of 12
20225,409,30450.6%12 of 12
20234,085,85638.2%12 of 12
20244,052,94637.8%12 of 12
20254,437,53741.5%12 of 12
2026 (provisional, partial year)3,588,41657.8%7 of 7

* 2026 covers January to July and is provisional. Capacity factor is net generation divided by nameplate capacity times the hours of each reported month.

Power prices and basis

Free account

No verified ISO price node is linked to this plant, or its price history could not load.

Emissions

Free · EPA CAMPD

No EPA emissions units are linked to this plant.

Water use

Free · EIA-923 cooling, USGS

No EIA cooling-water record for this plant in 2024. Plants without steam cooling, such as wind, solar and batteries, do not report cooling water.

Generators

Free · EIA-860M
GeneratorTechnologyNameplate MWOnline since
1AConventional Hydroelectric122.0October 2013
2AConventional Hydroelectric122.0December 2012
3AConventional Hydroelectric122.0August 2017
4AConventional Hydroelectric122.0September 2020
5AConventional Hydroelectric122.0February 2012
6AConventional Hydroelectric122.0July 2016
7AConventional Hydroelectric122.0April 2011
8AConventional Hydroelectric122.0November 2018
9AConventional Hydroelectric122.0June 2015
10AConventional Hydroelectric122.0June 2014

Ownership and offtake

Pro
Pro

Ownership and offtake are part of Pro

Owners and their shares, parent companies, and power purchase agreements with their buyers. EIA-860M lists PUD No 2 of Grant County - (WA) as the operator, which is not always the owner.

Modeled data

Pro

Pro adds modeled values for this plant. Everything above stays free.

Analyst and MCP

300 analyst questions a month, plus MCP

Query Wanapum and 14,224 other projects from Claude or your own tools. Free accounts get 1 question a day.

Power plants near Wanapum

More plants operated by PUD No 2 of Grant County - (WA)

Questions about Wanapum

How much power does Wanapum produce?

Wanapum reported 4,437,537 MWh (4.44 TWh) of net generation in 2025, a 41.5% capacity factor on 1,220 MW of nameplate capacity. From January to July 2026 it reported 3.59 TWh, which is provisional.

Where is Wanapum?

Wanapum is in Grant County, Washington, at 46.8731, −119.9703. It is in the Public Utility District No. 2 of Grant County, Washington balancing area (GCPD).

Who operates Wanapum?

EIA-860M for August 2026 lists PUD No 2 of Grant County - (WA) as the operator (EIA operator ID 14624). The operator is not always the owner.

When did Wanapum start operating?

Its first generator began operating in April 2011, according to EIA-860M.

Sources

  • EIA-860 2025 (final) and EIA-860M August 2026: plant, generators, capacity, operator and location
  • EIA-923 monthly net generation, 2000 to July 2026 (2026 provisional)
  • Plant names from OpenStreetMap, © OpenStreetMap contributors (ODbL)

Page updated 2026-10-04 from the InfraMap data build. Methodology · Data sources · EIA plant page