Clam River Dam
Hydro power plant in Burnett County, Wisconsin. 1.2 MW of nameplate capacity across 3 generators, operated by Zero6 Energy Hydro.
Also known as Clam River 2WP516 Dam · EIA plant 4018
Analyst: free account, 1 question a day.
Key facts
- Capacity
- 1.2 MWNameplate
- Generators
- 3 operatingEIA-860M, August 2026
- Operating since
- April 1942First generator online
- Operator
- Zero6 Energy HydroEIA operator ID 67398
- Grid
- MISOBalancing authority MISO
- Price nodes
- None linkedNo verified ISO node
- Location
- Burnett County, WI45.9467, −92.5383
- EIA plant ID
- 4018EIA plant page
Data as of EIA-860M August 2026 (published 2026-09-24). Capacity is nameplate, not live output.
How much power Clam River Dam produces
Free · EIA-923Net generation, 2025
4.79 GWh
4,790 MWh, final
Capacity factor, 2025
45.6%
2024: 48.6%
January to July 2026
Not reported
Provisional. 0 of 7 months reported
Range, 2015 to 2025
4.5–6.4
GWh a year. Low 2021, high 2019
| Year | Net generation, MWh | Capacity factor | Months reported |
|---|---|---|---|
| 2000 | 0 | Not reported | 12 of 12 |
| 2001 | 1,071 | Not reported | 12 of 12 |
| 2002 | Not reported | Not reported | 0 of 12 |
| 2003 | 5,493 | Not reported | 12 of 12 |
| 2004 | 5,826 | Not reported | 12 of 12 |
| 2005 | 5,134 | Not reported | 12 of 12 |
| 2006 | 4,555 | Not reported | 12 of 12 |
| 2007 | 3,260 | Not reported | 12 of 12 |
| 2008 | 4,507 | Not reported | 12 of 12 |
| 2009 | 3,730 | Not reported | 12 of 12 |
| 2010 | 5,170 | 49.2% | 12 of 12 |
| 2011 | 5,331 | 50.7% | 12 of 12 |
| 2012 | 4,475 | 42.5% | 12 of 12 |
| 2013 | 4,458 | 42.4% | 12 of 12 |
| 2014 | 5,969 | 56.8% | 12 of 12 |
| 2015 | 5,636 | 53.6% | 12 of 12 |
| 2016 | 5,585 | 53.0% | 12 of 12 |
| 2017 | 5,794 | 55.1% | 12 of 12 |
| 2018 | 5,295 | 50.4% | 12 of 12 |
| 2019 | 6,407 | 60.9% | 12 of 12 |
| 2020 | 5,767 | 54.7% | 12 of 12 |
| 2021 | 4,489 | 42.7% | 12 of 12 |
| 2022 | 4,615 | 43.9% | 12 of 12 |
| 2023 | 4,761 | 45.3% | 12 of 12 |
| 2024 | 5,124 | 48.6% | 12 of 12 |
| 2025 | 4,790 | 45.6% | 12 of 12 |
| 2026 (provisional, partial year) | Not reported | Not reported | 0 of 7 |
* 2026 covers January to July and is provisional. Capacity factor is net generation divided by nameplate capacity times the hours of each reported month.
Power prices and basis
Free accountNo verified ISO price node is linked to this plant, or its price history could not load.
Emissions
Free · EPA CAMPDNo EPA emissions units are linked to this plant.
Water use
Free · EIA-923 cooling, USGSNo EIA cooling-water record for this plant in 2024. Plants without steam cooling, such as wind, solar and batteries, do not report cooling water.
Generators
Free · EIA-860M| Generator | Technology | Nameplate MW | Online since |
|---|---|---|---|
| 1 | Conventional Hydroelectric | 0.4 | December 1942 |
| 2 | Conventional Hydroelectric | 0.4 | April 1942 |
| 3 | Conventional Hydroelectric | 0.4 | April 1967 |
Ownership and offtake
ProOwnership and offtake are part of Pro
Owners and their shares, parent companies, and power purchase agreements with their buyers. EIA-860M lists Zero6 Energy Hydro as the operator, which is not always the owner.
Modeled data
ProPro adds modeled values for this plant. Everything above stays free.
300 analyst questions a month, plus MCP
Query Clam River Dam and 14,224 other projects from Claude or your own tools. Free accounts get 1 question a day.
Power plants near Clam River Dam
More plants operated by Zero6 Energy Hydro
Questions about Clam River Dam
How much power does Clam River Dam produce?
Clam River Dam reported 4,790 MWh (4.79 GWh) of net generation in 2025, a 45.6% capacity factor on 1.2 MW of nameplate capacity.
Where is Clam River Dam?
Clam River Dam is in Burnett County, Wisconsin, at 45.9467, −92.5383. It is in the Midcontinent Independent Transmission System Operator, Inc.. balancing area (MISO).
Who operates Clam River Dam?
EIA-860M for August 2026 lists Zero6 Energy Hydro as the operator (EIA operator ID 67398). The operator is not always the owner.
When did Clam River Dam start operating?
Its first generator began operating in April 1942, according to EIA-860M.
Sources
- EIA-860 2025 (final) and EIA-860M August 2026: plant, generators, capacity, operator and location
- EIA-923 monthly net generation, 2000 to July 2026 (2026 provisional)
- Plant names from OpenStreetMap, © OpenStreetMap contributors (ODbL)
Page updated 2026-10-04 from the InfraMap data build. Methodology · Data sources · EIA plant page