Natural gasOperatingERCOT

Texas Gulf Sulphur

Natural gas power plant in Wharton County, Texas. 101.9 MW of nameplate capacity across 1 generator, operated by Wharton County Generation LLC.

Also known as Newgulf Cogeneration Plant · EIA plant 50137

Analyst: free account, 1 question a day.

GulfStar Power, LLCOld 300 Solar Center, LLCOld 300 Storage CenterCascade Solar (TX)Colorado Bend IITexas Gulf Sulphur5 km
Open in the map
6 plants within 16 km, from EIA coordinates.

Key facts

Capacity
101.9 MWNameplate
Generators
1 operatingEIA-860M, August 2026
Operating since
April 1984First generator online
Operator
Wharton County Generation LLCEIA operator ID 65401
Grid
ERCOTBalancing authority ERCO
Price nodes
1 ERCOT nodeResource nodes with prices
Location
Wharton County, TX29.2639, −95.8997
EIA plant ID
50137EIA plant page

Data as of EIA-860M August 2026 (published 2026-09-24). Capacity is nameplate, not live output.

How much power Texas Gulf Sulphur produces

Free · EIA-923

Net generation, 2025

4.59 GWh

4,591 MWh, final

Capacity factor, 2025

0.5%

2024: 1.4%

January to July 2026

Not reported

Provisional. 0 of 7 months reported

Range, 2015 to 2025

2.6–32.9

GWh a year. Low 2015, high 2023

Annual net generation, GWhCapacity factor below each year
Annual net generation from EIA-923
YearNet generation, MWhCapacity factorMonths reported
200027,383Not reported12 of 12
200110,363Not reported12 of 12
20021,759Not reported12 of 12
20030Not reported12 of 12
20040Not reported12 of 12
200516,540Not reported12 of 12
200617,384Not reported12 of 12
2007477Not reported12 of 12
200814,909Not reported12 of 12
200922,324Not reported12 of 12
20106,9420.8%12 of 12
201118,2522.0%12 of 12
20122,6190.3%12 of 12
20133,6260.4%12 of 12
20142,6290.3%12 of 12
20152,5500.3%12 of 12
20169,3251.0%12 of 12
20174,2970.5%12 of 12
201819,8002.2%12 of 12
20196,5630.7%12 of 12
20206,624Not reported11 of 12
2021Not reportedNot reported0 of 12
2022Not reportedNot reported0 of 12
202332,8623.7%12 of 12
202412,6501.4%12 of 12
20254,5910.5%12 of 12
2026 (provisional, partial year)Not reportedNot reported0 of 7

* 2026 covers January to July and is provisional. Capacity factor is net generation divided by nameplate capacity times the hours of each reported month.

Power prices and basis

Free account · ERCOT

Emissions

Free · EPA CAMPD

CO₂, 2025

3,305

US short tons. 2024: 9,509

SO₂, 2025

0

US short tons

NOx, 2025

6

US short tons

CO₂ per MWh, calculated

0.72 t

About 1,440 lb per MWh

1 of 1 EPA units reported CO₂ in 2025 (1), matched to EIA plant 50137 through the EPA–EIA crosswalk. The per-MWh rate is EPA CO₂ divided by EIA-923 net generation. The two reporting boundaries can differ.

Water use

Free · EIA-923 cooling, USGS

No EIA cooling-water record for this plant in 2024.

Generators

Free · EIA-860M
GeneratorTechnologyNameplate MWOnline since
GEN1Natural Gas Fired Combustion Turbine101.9April 1984

Ownership and offtake

Pro
Pro

Ownership and offtake are part of Pro

Owners and their shares, parent companies, and power purchase agreements with their buyers. EIA-860M lists Wharton County Generation LLC as the operator, which is not always the owner.

Modeled data

Pro

Pro adds modeled values for this plant. Everything above stays free.

Modeled

Generation potential vs reported

Monthly potential at seasonal net capability, next to EIA-923 output. Shows how much of the plant's capability was used.

Analyst and MCP

300 analyst questions a month, plus MCP

Query Texas Gulf Sulphur and 14,224 other projects from Claude or your own tools. Free accounts get 1 question a day.

Power plants near Texas Gulf Sulphur

Questions about Texas Gulf Sulphur

How much power does Texas Gulf Sulphur produce?

Texas Gulf Sulphur reported 4,591 MWh (4.59 GWh) of net generation in 2025, a 0.5% capacity factor on 101.9 MW of nameplate capacity.

Where is Texas Gulf Sulphur?

Texas Gulf Sulphur is in Wharton County, Texas, at 29.2639, −95.8997. It is in the Electric Reliability Council of Texas, Inc. balancing area (ERCO).

Who operates Texas Gulf Sulphur?

EIA-860M for August 2026 lists Wharton County Generation LLC as the operator (EIA operator ID 65401). The operator is not always the owner.

When did Texas Gulf Sulphur start operating?

Its first generator began operating in April 1984, according to EIA-860M.

Does InfraMap have power prices for Texas Gulf Sulphur?

Yes. InfraMap has ERCOT day-ahead and real-time prices at 1 price node linked to Texas Gulf Sulphur, with the hub price and node-to-hub basis. Prices are free with an InfraMap account; pricing node names are part of InfraMap Pro.

Sources

  • EIA-860 2025 (final) and EIA-860M August 2026: plant, generators, capacity, operator and location
  • EIA-923 monthly net generation, 2000 to July 2026 (2026 provisional)
  • EPA CAMPD annual emissions through the EPA–EIA crosswalk, 1995 to 2025
  • ERCOT day-ahead and real-time prices; node and hub assignments as of 2026-10-05
  • Plant names from OpenStreetMap, © OpenStreetMap contributors (ODbL)

Page updated 2026-10-04 from the InfraMap data build. Methodology · Data sources · EIA plant page