Key facts

Capacity
8.5 MWNameplate
Generators
1 operatingEIA-860M, August 2026
Operating since
June 1993First generator online
Operator
Owyhee Irrigation DistrictEIA operator ID 14243
Grid
IPCOBalancing authority IPCO
Price nodes
None linkedNo verified ISO node
Location
Malheur County, OR43.6420, −117.2327
EIA plant ID
50362EIA plant page

Data as of EIA-860M August 2026 (published 2026-09-24). Capacity is nameplate, not live output.

How much power Tunnel 1 Power Project produces

Free · EIA-923

Net generation, 2025

21.1 GWh

21,069 MWh, final

Capacity factor, 2025

28.3%

2024: 30.0%

January to July 2026

Not reported

Provisional. 0 of 7 months reported

Range, 2015 to 2025

0.0–22.9

GWh a year. Low 2015, high 2017

Annual net generation, GWhCapacity factor below each year
Annual net generation from EIA-923
YearNet generation, MWhCapacity factorMonths reported
2000Not reportedNot reported0 of 12
20017,654Not reported12 of 12
20027,826Not reported12 of 12
20030Not reported12 of 12
20047,481Not reported12 of 12
200517,486Not reported12 of 12
200633,742Not reported12 of 12
200712,560Not reported12 of 12
200811,064Not reported12 of 12
20098,423Not reported12 of 12
20106,47310.6%12 of 12
201124,10039.3%12 of 12
201215,46925.2%12 of 12
20133,0184.9%12 of 12
201400.0%12 of 12
201500.0%12 of 12
201610,56117.2%12 of 12
201722,86137.3%12 of 12
201816,36926.7%12 of 12
201922,31636.4%12 of 12
202018,87430.7%12 of 12
20216,26210.2%12 of 12
20223,5285.8%12 of 12
202315,280Not reported12 of 12
202422,42530.0%12 of 12
202521,06928.3%12 of 12
2026 (provisional, partial year)Not reportedNot reported0 of 7

* 2026 covers January to July and is provisional. Capacity factor is net generation divided by nameplate capacity times the hours of each reported month.

Power prices and basis

Free account

No verified ISO price node is linked to this plant, or its price history could not load.

Emissions

Free · EPA CAMPD

No EPA emissions units are linked to this plant.

Water use

Free · EIA-923 cooling, USGS

No EIA cooling-water record for this plant in 2024. Plants without steam cooling, such as wind, solar and batteries, do not report cooling water.

Generators

Free · EIA-860M
GeneratorTechnologyNameplate MWOnline since
GEN1Conventional Hydroelectric8.5June 1993

Ownership and offtake

Pro
Pro

Ownership and offtake are part of Pro

Owners and their shares, parent companies, and power purchase agreements with their buyers. EIA-860M lists Owyhee Irrigation District as the operator, which is not always the owner.

Modeled data

Pro

Pro adds modeled values for this plant. Everything above stays free.

Analyst and MCP

300 analyst questions a month, plus MCP

Query Tunnel 1 Power Project and 14,224 other projects from Claude or your own tools. Free accounts get 1 question a day.

Power plants near Tunnel 1 Power Project

More plants operated by Owyhee Irrigation District

Questions about Tunnel 1 Power Project

How much power does Tunnel 1 Power Project produce?

Tunnel 1 Power Project reported 21,069 MWh (21.1 GWh) of net generation in 2025, a 28.3% capacity factor on 8.5 MW of nameplate capacity.

Where is Tunnel 1 Power Project?

Tunnel 1 Power Project is in Malheur County, Oregon, at 43.6420, −117.2327. It is in the Idaho Power Company balancing area (IPCO).

Who operates Tunnel 1 Power Project?

EIA-860M for August 2026 lists Owyhee Irrigation District as the operator (EIA operator ID 14243). The operator is not always the owner.

When did Tunnel 1 Power Project start operating?

Its first generator began operating in June 1993, according to EIA-860M.

Sources

  • EIA-860 2025 (final) and EIA-860M August 2026: plant, generators, capacity, operator and location
  • EIA-923 monthly net generation, 2000 to July 2026 (2026 provisional)

Page updated 2026-10-04 from the InfraMap data build. Methodology · Data sources · EIA plant page