JM Shafer Generating Station

Natural gas power plant in Weld County, Colorado. 396.9 MW of nameplate capacity across 7 generators, operated by Tri-State G & T Assn, Inc.

Also known as EIA plant 50707

Analyst: free account, 1 question a day.

Fort LuptonSR Jenkins Ft LuptonDavis Battery StorageSR Platte Solar FarmOverlandJM Shafer5 km
Open in the map
6 plants within 12 km, from EIA coordinates.

Key facts

Capacity
396.9 MWNameplate
Generators
7 operatingEIA-860M, August 2026
Operating since
June 1994First generator online
Operator
Tri-State G & T Assn, IncEIA operator ID 30151
Grid
PSCOBalancing authority PSCO
Price nodes
None linkedNo verified ISO node
Location
Weld County, CO40.0986, −104.7736
EIA plant ID
50707EIA plant page

Data as of EIA-860M August 2026 (published 2026-09-24). Capacity is nameplate, not live output.

How much power JM Shafer produces

Free · EIA-923

Net generation, 2025

717 GWh

716,612 MWh, final

Capacity factor, 2025

20.6%

2024: 28.1%

January to July 2026

427 GWh

Provisional

Range, 2015 to 2025

0.4–1.1

TWh a year. Low 2017, high 2023

Annual net generation, TWhCapacity factor below each year
Annual net generation from EIA-923
YearNet generation, MWhCapacity factorMonths reported
2000653,366Not reported12 of 12
2001563,845Not reported12 of 12
2002746,020Not reported12 of 12
2003865,289Not reported12 of 12
2004757,421Not reported12 of 12
2005729,721Not reported12 of 12
2006731,171Not reported12 of 12
20071,003,125Not reported12 of 12
2008930,900Not reported12 of 12
2009881,618Not reported12 of 12
2010567,35616.8%12 of 12
2011517,65415.3%12 of 12
2012716,69921.1%12 of 12
2013608,466Not reported12 of 12
2014584,01716.8%12 of 12
2015702,57720.2%12 of 12
2016547,55615.7%12 of 12
2017433,97112.5%12 of 12
2018784,00422.5%12 of 12
2019647,68418.6%12 of 12
2020912,52126.2%12 of 12
2021791,93022.8%12 of 12
2022894,21925.7%12 of 12
20231,050,27330.2%12 of 12
2024979,59928.1%12 of 12
2025716,61220.6%12 of 12
2026 (provisional, partial year)426,80421.1%7 of 7

* 2026 covers January to July and is provisional. Capacity factor is net generation divided by nameplate capacity times the hours of each reported month.

Power prices and basis

Free account

No verified ISO price node is linked to this plant, or its price history could not load.

Emissions

Free · EPA CAMPD

CO₂, 2025

360,375

US short tons. 2024: 474,130

SO₂, 2025

2

US short tons

NOx, 2025

273

US short tons

CO₂ per MWh, calculated

0.50 t

About 1,006 lb per MWh

5 of 5 EPA units reported CO₂ in 2025 (S001, S002, S003, S004, S005), matched to EIA plant 50707 through the EPA–EIA crosswalk. The per-MWh rate is EPA CO₂ divided by EIA-923 net generation. The two reporting boundaries can differ.

Water use

Free · EIA-923 cooling, USGS

Withdrawal, 2024

159

million gallons

Consumption, 2024

159

million gallons

Source

GW

Ground, Fresh. Induced-draft tower

Watershed stress

Very low/none · 0.165

USGS SUI, HUC12 Mose Davis Lake-South Platte River

12 of 12 cooling months report withdrawal. Groundwater user; SUI describes surface water and is context only. Blank volumes are unreported, not zero.

Generators

Free · EIA-860M
GeneratorTechnologyNameplate MWOnline since
LMANatural Gas Fired Combined Cycle58.5June 1994
LMBNatural Gas Fired Combined Cycle58.5June 1994
LMCNatural Gas Fired Combined Cycle58.5July 1994
LMDNatural Gas Fired Combined Cycle58.5July 1994
LMENatural Gas Fired Combined Cycle58.5July 1994
STANatural Gas Fired Combined Cycle52.2June 1994
STBNatural Gas Fired Combined Cycle52.2June 1994

Ownership and offtake

Pro
Pro

Ownership and offtake are part of Pro

Owners and their shares, parent companies, and power purchase agreements with their buyers. EIA-860M lists Tri-State G & T Assn, Inc as the operator, which is not always the owner.

Modeled data

Pro

Pro adds modeled values for this plant. Everything above stays free.

Modeled

Generation potential vs reported

Monthly potential at seasonal net capability, next to EIA-923 output. Shows how much of the plant's capability was used.

Analyst and MCP

300 analyst questions a month, plus MCP

Query JM Shafer Generating Station and 14,224 other projects from Claude or your own tools. Free accounts get 1 question a day.

Power plants near JM Shafer

More plants operated by Tri-State G & T Assn, Inc

Questions about JM Shafer

How much power does JM Shafer Generating Station produce?

JM Shafer Generating Station reported 716,612 MWh (717 GWh) of net generation in 2025, a 20.6% capacity factor on 396.9 MW of nameplate capacity. From January to July 2026 it reported 427 GWh, which is provisional.

Where is JM Shafer Generating Station?

JM Shafer Generating Station is in Weld County, Colorado, at 40.0986, −104.7736. It is in the Public Service Company of Colorado balancing area (PSCO).

Who operates JM Shafer Generating Station?

EIA-860M for August 2026 lists Tri-State G & T Assn, Inc as the operator (EIA operator ID 30151). The operator is not always the owner.

When did JM Shafer Generating Station start operating?

Its first generator began operating in June 1994, according to EIA-860M.

Sources

  • EIA-860 2025 (final) and EIA-860M August 2026: plant, generators, capacity, operator and location
  • EIA-923 monthly net generation, 2000 to July 2026 (2026 provisional)
  • EPA CAMPD annual emissions through the EPA–EIA crosswalk, 1995 to 2025
  • EIA-923 cooling water 2024 and the USGS surface water supply and use index, Water years 2010-2020 (Oct 2009 to Sep 2020), mean of monthly values

Page updated 2026-10-04 from the InfraMap data build. Methodology · Data sources · EIA plant page