Key facts

Capacity
470.1 MWNameplate
Generators
5 operatingEIA-860M, August 2026
Operating since
January 1993First generator online
Operator
Invenergy Services LLCEIA operator ID 49893
Grid
TECBalancing authority TEC
Price nodes
None linkedNo verified ISO node
Location
Hardee County, FL27.6364, −81.9636
EIA plant ID
50949EIA plant page

Data as of EIA-860M August 2026 (published 2026-09-24). Capacity is nameplate, not live output.

How much power Hardee produces

Free · EIA-923

Net generation, 2025

793 GWh

793,066 MWh, final

Capacity factor, 2025

19.3%

2024: 22.9%

January to July 2026

752 GWh

Provisional

Range, 2015 to 2025

0.4–1.1

TWh a year. Low 2017, high 2022

Annual net generation, TWhCapacity factor below each year
Annual net generation from EIA-923
YearNet generation, MWhCapacity factorMonths reported
20001,089,464Not reported12 of 12
20011,072,247Not reported12 of 12
20021,095,639Not reported12 of 12
2003912,223Not reported12 of 12
2004458,842Not reported12 of 12
2005304,412Not reported12 of 12
2006475,997Not reported12 of 12
2007593,431Not reported12 of 12
2008536,681Not reported12 of 12
2009745,424Not reported12 of 12
2010551,79513.4%12 of 12
2011133,942Not reported12 of 12
2012608,55816.0%12 of 12
2013298,610Not reported12 of 12
2014373,2549.9%12 of 12
2015783,42520.7%12 of 12
2016571,652Not reported11 of 12
2017357,1018.7%12 of 12
2018442,24010.7%12 of 12
2019770,78818.7%12 of 12
2020887,85321.5%12 of 12
2021848,39820.6%12 of 12
20221,098,95426.7%12 of 12
2023804,54219.5%12 of 12
2024946,31422.9%12 of 12
2025793,06619.3%12 of 12
2026 (provisional, partial year)751,67831.4%7 of 7

* 2026 covers January to July and is provisional. Capacity factor is net generation divided by nameplate capacity times the hours of each reported month.

Power prices and basis

Free account

No verified ISO price node is linked to this plant, or its price history could not load.

Emissions

Free · EPA CAMPD

CO₂, 2025

3,965

US short tons. 2024: 15,105

SO₂, 2025

0

US short tons

NOx, 2025

1

US short tons

CO₂ per MWh, calculated

0.00 t

About 10 lb per MWh

1 of 1 EPA units reported CO₂ in 2025 (CT1A, CT1B, CT2A, CT2B), matched to EIA plant 50949 through the EPA–EIA crosswalk. The per-MWh rate is EPA CO₂ divided by EIA-923 net generation. The two reporting boundaries can differ.

Water use

Free · EIA-923 cooling, USGS

No EIA cooling-water record for this plant in 2024.

Generators

Free · EIA-860M
GeneratorTechnologyNameplate MWOnline since
GEN1Natural Gas Fired Combined Cycle95.9January 1993
GEN2Natural Gas Fired Combined Cycle95.9January 1993
GEN3Natural Gas Fired Combined Cycle95.9January 1993
GEN4Natural Gas Fired Combustion Turbine86.5January 1993
GEN5Natural Gas Fired Combustion Turbine95.9May 2000

Ownership and offtake

Pro
Pro

Ownership and offtake are part of Pro

Owners and their shares, parent companies, and power purchase agreements with their buyers. EIA-860M lists Invenergy Services LLC as the operator, which is not always the owner.

Modeled data

Pro

Pro adds modeled values for this plant. Everything above stays free.

Modeled

Generation potential vs reported

Monthly potential at seasonal net capability, next to EIA-923 output. Shows how much of the plant's capability was used.

Analyst and MCP

300 analyst questions a month, plus MCP

Query Hardee Power Station and 14,224 other projects from Claude or your own tools. Free accounts get 1 question a day.

Power plants near Hardee

More plants operated by Invenergy Services LLC

Questions about Hardee

How much power does Hardee Power Station produce?

Hardee Power Station reported 793,066 MWh (793 GWh) of net generation in 2025, a 19.3% capacity factor on 470.1 MW of nameplate capacity. From January to July 2026 it reported 752 GWh, which is provisional.

Where is Hardee Power Station?

Hardee Power Station is in Hardee County, Florida, at 27.6364, −81.9636. It is in the Tampa Electric Company balancing area (TEC).

Who operates Hardee Power Station?

EIA-860M for August 2026 lists Invenergy Services LLC as the operator (EIA operator ID 49893). The operator is not always the owner.

When did Hardee Power Station start operating?

Its first generator began operating in January 1993, according to EIA-860M.

Sources

  • EIA-860 2025 (final) and EIA-860M August 2026: plant, generators, capacity, operator and location
  • EIA-923 monthly net generation, 2000 to July 2026 (2026 provisional)