Key facts

Capacity
6.7 MWNameplate
Generators
11 operatingEIA-860M, August 2026
Operating since
January 1913First generator online
Operator
Domtar Industries IncEIA operator ID 5033
Grid
MISOBalancing authority MISO
Price nodes
None linkedNo verified ISO node
Location
Wood County, WI44.3364, −89.8672
EIA plant ID
54103EIA plant page

Data as of EIA-860M August 2026 (published 2026-09-24). Capacity is nameplate, not live output.

How much power Port Edwards Mill produces

Free · EIA-923

Net generation, 2025

37.3 GWh

37,259 MWh, final

Capacity factor, 2025

63.5%

2024: 66.4%

January to July 2026

22.2 GWh

Provisional

Range, 2015 to 2025

21.8–44.2

GWh a year. Low 2019, high 2016

Annual net generation, GWhCapacity factor below each year
Annual net generation from EIA-923
YearNet generation, MWhCapacity factorMonths reported
2000Not reportedNot reported0 of 12
200193,107Not reported11 of 12
20026,708Not reported1 of 12
200370,761Not reported9 of 12
200495,426Not reported12 of 12
2005Not reportedNot reported0 of 12
200685,958Not reported12 of 12
200778,794Not reported12 of 12
200858,498Not reported12 of 12
200932,783Not reported12 of 12
201036,63130.7%12 of 12
201140,49034.0%12 of 12
201231,45826.3%12 of 12
201337,643Not reported12 of 12
201440,55269.1%12 of 12
201542,10871.7%12 of 12
201644,17175.1%12 of 12
201739,51567.3%12 of 12
201837,74764.3%12 of 12
201921,83037.2%12 of 12
202026,52645.1%12 of 12
202131,04152.9%12 of 12
202229,26549.9%12 of 12
202332,09354.7%12 of 12
202439,09366.4%12 of 12
202537,25963.5%12 of 12
2026 (provisional, partial year)22,20965.1%7 of 7

* 2026 covers January to July and is provisional. Capacity factor is net generation divided by nameplate capacity times the hours of each reported month.

Power prices and basis

Free account

No verified ISO price node is linked to this plant, or its price history could not load.

Emissions

Free · EPA CAMPD

No EPA emissions units are linked to this plant.

Water use

Free · EIA-923 cooling, USGS

No EIA cooling-water record for this plant in 2024. Plants without steam cooling, such as wind, solar and batteries, do not report cooling water.

Generators

Free · EIA-860M
GeneratorTechnologyNameplate MWOnline since
HG1Conventional Hydroelectric0.4January 1913
HG2Conventional Hydroelectric0.4January 1913
HG3Conventional Hydroelectric0.4January 1913
HG4Conventional Hydroelectric0.4January 1913
HG5Conventional Hydroelectric0.8January 1926
HG6Conventional Hydroelectric0.8January 1926
JHG1Conventional Hydroelectric1.3January 1926
JHG2Conventional Hydroelectric0.6January 1938
JHG3Conventional Hydroelectric0.6January 1939
JHG4Conventional Hydroelectric0.4January 1943
JHG5Conventional Hydroelectric0.6January 1977

Ownership and offtake

Pro
Pro

Ownership and offtake are part of Pro

Owners and their shares, parent companies, and power purchase agreements with their buyers. EIA-860M lists Domtar Industries Inc as the operator, which is not always the owner.

Modeled data

Pro

Pro adds modeled values for this plant. Everything above stays free.

Analyst and MCP

300 analyst questions a month, plus MCP

Query Port Edwards Mill and 14,224 other projects from Claude or your own tools. Free accounts get 1 question a day.

Power plants near Port Edwards Mill

More plants operated by Domtar Industries Inc

Questions about Port Edwards Mill

How much power does Port Edwards Mill produce?

Port Edwards Mill reported 37,259 MWh (37.3 GWh) of net generation in 2025, a 63.5% capacity factor on 6.7 MW of nameplate capacity. From January to July 2026 it reported 22.2 GWh, which is provisional.

Where is Port Edwards Mill?

Port Edwards Mill is in Wood County, Wisconsin, at 44.3364, −89.8672. It is in the Midcontinent Independent Transmission System Operator, Inc.. balancing area (MISO).

Who operates Port Edwards Mill?

EIA-860M for August 2026 lists Domtar Industries Inc as the operator (EIA operator ID 5033). The operator is not always the owner.

When did Port Edwards Mill start operating?

Its first generator began operating in January 1913, according to EIA-860M.

Sources

  • EIA-860 2025 (final) and EIA-860M August 2026: plant, generators, capacity, operator and location
  • EIA-923 monthly net generation, 2000 to July 2026 (2026 provisional)

Page updated 2026-10-04 from the InfraMap data build. Methodology · Data sources · EIA plant page