Saguaro Power

Natural gas power plant in Clark County, Nevada. 127.2 MW of nameplate capacity across 3 generators, operated by Saguaro Power Co.

Also known as EIA plant 54271

Analyst: free account, 1 question a day.

Clark (NVE)River Mountains SolarDignity - Siena CampusLas Vegas WPCF Solar PlantIGS LAS1Saguaro Power5 km
Open in the map
6 plants within 16 km, from EIA coordinates.

Key facts

Capacity
127.2 MWNameplate
Generators
3 operatingEIA-860M, August 2026
Operating since
September 1991First generator online
Operator
Saguaro Power CoEIA operator ID 16553
Grid
NEVPBalancing authority NEVP
Price nodes
None linkedNo verified ISO node
Location
Clark County, NV36.0417, −115.0117
EIA plant ID
54271EIA plant page

Data as of EIA-860M August 2026 (published 2026-09-24). Capacity is nameplate, not live output.

How much power Saguaro Power produces

Free · EIA-923

Net generation, 2025

264 GWh

264,486 MWh, final

Capacity factor, 2025

23.7%

2024: 19.0%

January to July 2026

27.8 GWh

Provisional

Range, 2016 to 2025

209.1–756.7

GWh a year. Low 2023, high 2019

Annual net generation, GWhCapacity factor below each year
Annual net generation from EIA-923
YearNet generation, MWhCapacity factorMonths reported
2000803,683Not reported12 of 12
2001752,127Not reported12 of 12
2002182,109Not reported3 of 12
2003761,959Not reported12 of 12
2004748,374Not reported12 of 12
2005590,586Not reported12 of 12
2006731,615Not reported12 of 12
2007632,904Not reported12 of 12
2008406,629Not reported12 of 12
2009504,819Not reported12 of 12
2010699,61662.8%12 of 12
2011729,31765.5%12 of 12
2012714,80564.0%12 of 12
2013741,963Not reported12 of 12
2014758,70768.1%12 of 12
2015626,56267.1%10 of 12
2016754,18667.5%12 of 12
2017734,73065.9%12 of 12
2018709,33363.7%12 of 12
2019756,67667.9%12 of 12
2020749,45567.1%12 of 12
2021744,37066.8%12 of 12
2022555,63849.9%12 of 12
2023209,08418.8%12 of 12
2024212,65119.0%12 of 12
2025264,48623.7%12 of 12
2026 (provisional, partial year)27,7974.3%7 of 7

* 2026 covers January to July and is provisional. Capacity factor is net generation divided by nameplate capacity times the hours of each reported month.

Power prices and basis

Free account

No verified ISO price node is linked to this plant, or its price history could not load.

Emissions

Free · EPA CAMPD

CO₂, 2025

143,773

US short tons. 2024: 116,867

SO₂, 2025

1

US short tons

NOx, 2025

37

US short tons

CO₂ per MWh, calculated

0.54 t

About 1,087 lb per MWh

2 of 2 EPA units reported CO₂ in 2025 (A01, A02), matched to EIA plant 54271 through the EPA–EIA crosswalk. The per-MWh rate is EPA CO₂ divided by EIA-923 net generation. The two reporting boundaries can differ.

Water use

Free · EIA-923 cooling, USGS

No EIA cooling-water record for this plant in 2024.

Generators

Free · EIA-860M
GeneratorTechnologyNameplate MWOnline since
CTG1Natural Gas Fired Combined Cycle45.1September 1991
CTG2Natural Gas Fired Combined Cycle45.1September 1991
STGNatural Gas Fired Combined Cycle37.0September 1991

Ownership and offtake

Pro
Pro

Ownership and offtake are part of Pro

Owners and their shares, parent companies, and power purchase agreements with their buyers. EIA-860M lists Saguaro Power Co as the operator, which is not always the owner.

Modeled data

Pro

Pro adds modeled values for this plant. Everything above stays free.

Modeled

Generation potential vs reported

Monthly potential at seasonal net capability, next to EIA-923 output. Shows how much of the plant's capability was used.

Analyst and MCP

300 analyst questions a month, plus MCP

Query Saguaro Power and 14,224 other projects from Claude or your own tools. Free accounts get 1 question a day.

Power plants near Saguaro Power

Questions about Saguaro Power

How much power does Saguaro Power produce?

Saguaro Power reported 264,486 MWh (264 GWh) of net generation in 2025, a 23.7% capacity factor on 127.2 MW of nameplate capacity. From January to July 2026 it reported 27.8 GWh, which is provisional.

Where is Saguaro Power?

Saguaro Power is in Clark County, Nevada, at 36.0417, −115.0117. It is in the Nevada Power Company balancing area (NEVP).

Who operates Saguaro Power?

EIA-860M for August 2026 lists Saguaro Power Co as the operator (EIA operator ID 16553). The operator is not always the owner.

When did Saguaro Power start operating?

Its first generator began operating in September 1991, according to EIA-860M.

Sources

  • EIA-860 2025 (final) and EIA-860M August 2026: plant, generators, capacity, operator and location
  • EIA-923 monthly net generation, 2000 to July 2026 (2026 provisional)
  • EPA CAMPD annual emissions through the EPA–EIA crosswalk, 1995 to 2025

Page updated 2026-10-04 from the InfraMap data build. Methodology · Data sources · EIA plant page