HydroOperatingMISO

Hastings City Hydroelectric

Hydro power plant in Dakota County, Minnesota. 4.4 MW of nameplate capacity across 2 generators, operated by Hastings Lock & Dam.

Also known as EIA plant 54285

Analyst: free account, 1 question a day.

Hastings SolarCottage Grove Project CSGLSP-Cottage Grove LPGRE Marshan SolarCottage Grove CSG, LLCCGSun, LLC Community SolarHastings City Hydroel…5 km
Open in the map
6 plants within 9.8 km, from EIA coordinates.

Key facts

Capacity
4.4 MWNameplate
Generators
2 operatingEIA-860M, August 2026
Operating since
January 1992First generator online
Operator
Hastings Lock & DamEIA operator ID 8248
Grid
MISOBalancing authority MISO
Price nodes
None linkedNo verified ISO node
Location
Dakota County, MN44.7602, −92.8677
EIA plant ID
54285EIA plant page

Data as of EIA-860M August 2026 (published 2026-09-24). Capacity is nameplate, not live output.

How much power Hastings City Hydroelectric produces

Free · EIA-923

Net generation, 2025

13.9 GWh

13,917 MWh, final

Capacity factor, 2025

36.1%

2024: 34.3%

January to July 2026

Not reported

Provisional. 0 of 7 months reported

Range, 2015 to 2025

12.7–27.7

GWh a year. Low 2019, high 2015

Annual net generation, GWhCapacity factor below each year
Annual net generation from EIA-923
YearNet generation, MWhCapacity factorMonths reported
2000Not reportedNot reported0 of 12
20017,814Not reported12 of 12
20023,535Not reported12 of 12
200320,089Not reported12 of 12
200419,497Not reported12 of 12
200524,398Not reported12 of 12
200624,182Not reported12 of 12
200725,007Not reported12 of 12
200822,219Not reported12 of 12
200926,379Not reported12 of 12
201017,42545.2%12 of 12
201117,81246.2%12 of 12
201221,26155.0%12 of 12
201318,71748.6%12 of 12
201418,17847.2%12 of 12
201527,68471.8%12 of 12
201618,42247.7%12 of 12
201717,89746.4%12 of 12
201813,10534.0%12 of 12
201912,74433.1%12 of 12
202016,22842.0%12 of 12
202124,66764.0%12 of 12
202222,61258.7%12 of 12
202322,39858.1%12 of 12
202413,25134.3%12 of 12
202513,91736.1%12 of 12
2026 (provisional, partial year)Not reportedNot reported0 of 7

* 2026 covers January to July and is provisional. Capacity factor is net generation divided by nameplate capacity times the hours of each reported month.

Power prices and basis

Free account

No verified ISO price node is linked to this plant, or its price history could not load.

Emissions

Free · EPA CAMPD

No EPA emissions units are linked to this plant.

Water use

Free · EIA-923 cooling, USGS

No EIA cooling-water record for this plant in 2024. Plants without steam cooling, such as wind, solar and batteries, do not report cooling water.

Generators

Free · EIA-860M
GeneratorTechnologyNameplate MWOnline since
1Conventional Hydroelectric2.2January 1992
2Conventional Hydroelectric2.2January 1992

Ownership and offtake

Pro
Pro

Ownership and offtake are part of Pro

Owners and their shares, parent companies, and power purchase agreements with their buyers. EIA-860M lists Hastings Lock & Dam as the operator, which is not always the owner.

Modeled data

Pro

Pro adds modeled values for this plant. Everything above stays free.

Analyst and MCP

300 analyst questions a month, plus MCP

Query Hastings City Hydroelectric and 14,224 other projects from Claude or your own tools. Free accounts get 1 question a day.

Power plants near Hastings City Hydroelectric

Questions about Hastings City Hydroelectric

How much power does Hastings City Hydroelectric produce?

Hastings City Hydroelectric reported 13,917 MWh (13.9 GWh) of net generation in 2025, a 36.1% capacity factor on 4.4 MW of nameplate capacity.

Where is Hastings City Hydroelectric?

Hastings City Hydroelectric is in Dakota County, Minnesota, at 44.7602, −92.8677. It is in the Midcontinent Independent Transmission System Operator, Inc.. balancing area (MISO).

Who operates Hastings City Hydroelectric?

EIA-860M for August 2026 lists Hastings Lock & Dam as the operator (EIA operator ID 8248). The operator is not always the owner.

When did Hastings City Hydroelectric start operating?

Its first generator began operating in January 1992, according to EIA-860M.

Sources

  • EIA-860 2025 (final) and EIA-860M August 2026: plant, generators, capacity, operator and location
  • EIA-923 monthly net generation, 2000 to July 2026 (2026 provisional)

Page updated 2026-10-04 from the InfraMap data build. Methodology · Data sources · EIA plant page