Natural gasOperatingFPC

Orlando Cogen LP

Natural gas power plant in Orange County, Florida. 122.4 MW of nameplate capacity across 1 generator, operated by Florida Municipal Power Agency (FL).

Also known as Orlando Cogen LP Power Plant · EIA plant 54466

Analyst: free account, 1 question a day.

Walt Disney World Solar FacilityCitrus Ridge SolarCane IslandLockheed Martin SolarACE-Stanton PVOrlando Cogen LP10 km
Open in the map
6 plants within 23 km, from EIA coordinates.

Key facts

Capacity
122.4 MWNameplate
Generators
1 operatingEIA-860M, August 2026
Operating since
September 1993First generator online
Operator
Florida Municipal Power Agency (FL)EIA operator ID 6567
Grid
FPCBalancing authority FPC
Price nodes
None linkedNo verified ISO node
Location
Orange County, FL28.4426, −81.4123
EIA plant ID
54466EIA plant page

Data as of EIA-860M August 2026 (published 2026-09-24). Capacity is nameplate, not live output.

How much power Orlando Cogen LP produces

Free · EIA-923

Net generation, 2025

348 GWh

347,968 MWh, final

Capacity factor, 2025

32.5%

2024: 65.5%

January to July 2026

Not reported

Provisional. 0 of 7 months reported

Range, 2015 to 2025

0.3–1.0

TWh a year. Low 2025, high 2016

Annual net generation, TWhCapacity factor below each year
Annual net generation from EIA-923
YearNet generation, MWhCapacity factorMonths reported
2000860,796Not reported12 of 12
2001894,579Not reported12 of 12
2002860,496Not reported12 of 12
2003917,489Not reported12 of 12
2004776,144Not reported12 of 12
2005862,287Not reported12 of 12
2006948,230Not reported12 of 12
2007952,023Not reported12 of 12
2008680,483Not reported12 of 12
2009904,845Not reported12 of 12
2010873,57781.5%12 of 12
2011768,15071.6%12 of 12
2012807,09875.1%12 of 12
2013823,64376.8%12 of 12
2014906,89684.6%12 of 12
2015987,51392.1%12 of 12
20161,025,59095.4%12 of 12
2017925,99686.4%12 of 12
20181,022,14195.3%12 of 12
20191,014,10894.6%12 of 12
2020948,42288.2%12 of 12
20211,020,65295.2%12 of 12
20221,020,63495.2%12 of 12
20231,015,32794.7%12 of 12
2024704,75265.5%12 of 12
2025347,96832.5%12 of 12
2026 (provisional, partial year)Not reportedNot reported0 of 7

* 2026 covers January to July and is provisional. Capacity factor is net generation divided by nameplate capacity times the hours of each reported month.

Power prices and basis

Free account

No verified ISO price node is linked to this plant, or its price history could not load.

Emissions

Free · EPA CAMPD

CO₂, 2025

166,441

US short tons. 2024: 333,506

SO₂, 2025

1

US short tons

NOx, 2025

76

US short tons

CO₂ per MWh, calculated

0.48 t

About 957 lb per MWh

1 of 1 EPA units reported CO₂ in 2025 (1), matched to EIA plant 54466 through the EPA–EIA crosswalk. The per-MWh rate is EPA CO₂ divided by EIA-923 net generation. The two reporting boundaries can differ.

Water use

Free · EIA-923 cooling, USGS

Withdrawal, 2024

Not reported

million gallons as reported; not used, see note

Consumption, 2024

Not reported

million gallons

Source

Municipality

Ground, Fresh. Induced-draft tower

Watershed stress

Very low/none · 0.126

USGS SUI, HUC12 Big Sand Lake

0 of 12 cooling months report withdrawal. Groundwater user; SUI describes surface water and is context only. Consumption is below 5% of a large reported withdrawal, so the withdrawal is not used. Blank volumes are unreported, not zero.

Generators

Free · EIA-860M
GeneratorTechnologyNameplate MWOnline since
GEN1Natural Gas Fired Combined Cycle122.4September 1993

Ownership and offtake

Pro
Pro

Ownership and offtake are part of Pro

Owners and their shares, parent companies, and power purchase agreements with their buyers. EIA-860M lists Florida Municipal Power Agency (FL) as the operator, which is not always the owner.

Modeled data

Pro

Pro adds modeled values for this plant. Everything above stays free.

Modeled

Generation potential vs reported

Monthly potential at seasonal net capability, next to EIA-923 output. Shows how much of the plant's capability was used.

Analyst and MCP

300 analyst questions a month, plus MCP

Query Orlando Cogen LP and 14,224 other projects from Claude or your own tools. Free accounts get 1 question a day.

Power plants near Orlando Cogen LP

More plants operated by Florida Municipal Power Agency (FL)

Questions about Orlando Cogen LP

How much power does Orlando Cogen LP produce?

Orlando Cogen LP reported 347,968 MWh (348 GWh) of net generation in 2025, a 32.5% capacity factor on 122.4 MW of nameplate capacity.

Where is Orlando Cogen LP?

Orlando Cogen LP is in Orange County, Florida, at 28.4426, −81.4123. It is in the Progress Energy Florida balancing area (FPC).

Who operates Orlando Cogen LP?

EIA-860M for August 2026 lists Florida Municipal Power Agency (FL) as the operator (EIA operator ID 6567). The operator is not always the owner.

When did Orlando Cogen LP start operating?

Its first generator began operating in September 1993, according to EIA-860M.

Sources

  • EIA-860 2025 (final) and EIA-860M August 2026: plant, generators, capacity, operator and location
  • EIA-923 monthly net generation, 2000 to July 2026 (2026 provisional)
  • EPA CAMPD annual emissions through the EPA–EIA crosswalk, 1995 to 2025
  • EIA-923 cooling water 2024 and the USGS surface water supply and use index, Water years 2010-2020 (Oct 2009 to Sep 2020), mean of monthly values
  • Plant names from OpenStreetMap, © OpenStreetMap contributors (ODbL)

Page updated 2026-10-04 from the InfraMap data build. Methodology · Data sources · EIA plant page