OilNatural gasOperatingISO-NE

Montville Station

Oil power plant in New London County, Connecticut. 489.9 MW of nameplate capacity across 2 generators, operated by Montville Power LLC.

Also known as Montville Station Power Plant · EIA plant 546

Analyst: free account, 1 question a day.

Subase Microgrid ProjectNaval Sub Base New London Fuel CellRand Whitney CHP PlantCMEEC - Navy NE TridentFort Hill 1, 2, 3 & 4Connecticut CollegeMontville Station2 km
Open in the map
6 plants within 5.2 km, from EIA coordinates.

Key facts

Capacity
489.9 MWOil 414.9 · Natural gas 75.0
Generators
2 operatingEIA-860M, August 2026
Operating since
January 1954First generator online
Operator
Montville Power LLCEIA operator ID 22380
Grid
ISO-NEBalancing authority ISNE
Price nodes
2 ISONE nodesResource nodes with prices
Location
New London County, CT41.4281, −72.1019
EIA plant ID
546EIA plant page

Data as of EIA-860M August 2026 (published 2026-09-24). Capacity is nameplate, not live output.

How much power Montville Station produces

Free · EIA-923

Net generation, 2025

133 GWh

133,189 MWh, final

Capacity factor, 2025

3.1%

2024: 0.6%

January to July 2026

Not reported

Provisional. 0 of 7 months reported

Range, 2016 to 2025

10.1–133.2

GWh a year. Low 2019, high 2025

Annual net generation, GWhCapacity factor below each year
Annual net generation from EIA-923
YearNet generation, MWhCapacity factorMonths reported
20001,015,393Not reported12 of 12
2001637,058Not reported12 of 12
2002299,813Not reported12 of 12
2003249,300Not reported12 of 12
2004159,434Not reported12 of 12
2005551,938Not reported12 of 12
2006161,752Not reported12 of 12
200791,034Not reported12 of 12
200839,270Not reported12 of 12
200933,541Not reported12 of 12
201092,3042.1%12 of 12
201128,2120.7%12 of 12
201230,2590.7%12 of 12
20133,8851.2%1 of 12
20143,8091.0%1 of 12
2015Not reportedNot reported0 of 12
201613,4880.3%12 of 12
201745,3071.0%12 of 12
201875,6091.7%12 of 12
201910,0710.2%12 of 12
202011,892Not reported12 of 12
202126,9210.6%12 of 12
202297,4202.2%12 of 12
202336,2030.8%12 of 12
202427,7610.6%12 of 12
2025133,1893.1%12 of 12
2026 (provisional, partial year)Not reportedNot reported0 of 7

* 2026 covers January to July and is provisional. Capacity factor is net generation divided by nameplate capacity times the hours of each reported month.

Power prices and basis

Free account · ISONE

Emissions

Free · EPA CAMPD

CO₂, 2025

118,810

US short tons. 2024: 23,166

SO₂, 2025

172

US short tons

NOx, 2025

112

US short tons

CO₂ per MWh, calculated

0.89 t

About 1,784 lb per MWh

2 of 2 EPA units reported CO₂ in 2025 (5, 6), matched to EIA plant 546 through the EPA–EIA crosswalk. The per-MWh rate is EPA CO₂ divided by EIA-923 net generation. The two reporting boundaries can differ.

Water use

Free · EIA-923 cooling, USGS

Withdrawal, 2024

2,073

million gallons

Consumption, 2024

0

million gallons

Source

Thames River

Surface, Saline. Once-through

Watershed stress

Very low/none · 0.145

USGS SUI, HUC12 Thames River-Frontal New London Harbor

6 of 24 cooling months report withdrawal. Saline, brackish or ocean intake; not tested. Blank volumes are unreported, not zero.

Generators

Free · EIA-860M
GeneratorTechnologyNameplate MWOnline since
5Natural Gas Steam Turbine75.0January 1954
6Petroleum Liquids414.9January 1971

Ownership and offtake

Pro
Pro

Ownership and offtake are part of Pro

Owners and their shares, parent companies, and power purchase agreements with their buyers. EIA-860M lists Montville Power LLC as the operator, which is not always the owner.

Modeled data

Pro

Pro adds modeled values for this plant. Everything above stays free.

Modeled

Generation potential vs reported

Monthly potential at seasonal net capability, next to EIA-923 output. Shows how much of the plant's capability was used.

Analyst and MCP

300 analyst questions a month, plus MCP

Query Montville Station and 14,224 other projects from Claude or your own tools. Free accounts get 1 question a day.

Power plants near Montville Station

Questions about Montville Station

How much power does Montville Station produce?

Montville Station reported 133,189 MWh (133 GWh) of net generation in 2025, a 3.1% capacity factor on 489.9 MW of nameplate capacity.

Where is Montville Station?

Montville Station is in New London County, Connecticut, at 41.4281, −72.1019. It is in the ISO New England Inc. balancing area (ISNE).

Who operates Montville Station?

EIA-860M for August 2026 lists Montville Power LLC as the operator (EIA operator ID 22380). The operator is not always the owner.

When did Montville Station start operating?

Its first generator began operating in January 1954, according to EIA-860M.

Does InfraMap have power prices for Montville Station?

Yes. InfraMap has ISONE day-ahead and real-time prices at 2 price nodes linked to Montville Station, with the hub price and node-to-hub basis. Prices are free with an InfraMap account; pricing node names are part of InfraMap Pro.

Sources

  • EIA-860 2025 (final) and EIA-860M August 2026: plant, generators, capacity, operator and location
  • EIA-923 monthly net generation, 2000 to July 2026 (2026 provisional)
  • EPA CAMPD annual emissions through the EPA–EIA crosswalk, 1995 to 2025
  • ISONE day-ahead and real-time prices; node and hub assignments as of 2026-10-05
  • EIA-923 cooling water 2024 and the USGS surface water supply and use index, Water years 2010-2020 (Oct 2009 to Sep 2020), mean of monthly values
  • Plant names from OpenStreetMap, © OpenStreetMap contributors (ODbL)

Page updated 2026-10-04 from the InfraMap data build. Methodology · Data sources · EIA plant page