HydroOperatingWACM

Taylor Draw Hydroelectric Facility

Hydro power plant in Rio Blanco County, Colorado. 2.3 MW of nameplate capacity across 1 generator, operated by Rio Blanco Water Conserv Dist.

Also known as EIA plant 54729

Analyst: free account, 1 question a day.

Bar DBonanzaTaylor Draw Hydroelec…25 km
Open in the map
2 plants within 49 km, from EIA coordinates.

Key facts

Capacity
2.3 MWNameplate
Generators
1 operatingEIA-860M, August 2026
Operating since
April 1993First generator online
Operator
Rio Blanco Water Conserv DistEIA operator ID 16070
Grid
WACMBalancing authority WACM
Price nodes
None linkedNo verified ISO node
Location
Rio Blanco County, CO40.1063, −108.7112
EIA plant ID
54729EIA plant page

Data as of EIA-860M August 2026 (published 2026-09-24). Capacity is nameplate, not live output.

How much power Taylor Draw Hydroelectric Facility produces

Free · EIA-923

Net generation, 2025

1.45 GWh

1,451 MWh, final

Capacity factor, 2025

7.2%

2024: 38.6%

January to July 2026

Not reported

Provisional. 0 of 7 months reported

Range, 2015 to 2025

0.0–11.3

GWh a year. Low 2023, high 2019

Annual net generation, GWhCapacity factor below each year
Annual net generation from EIA-923
YearNet generation, MWhCapacity factorMonths reported
2000Not reportedNot reported0 of 12
200111,241Not reported12 of 12
20025,561Not reported12 of 12
20039,738Not reported12 of 12
200410,261Not reported12 of 12
200511,610Not reported12 of 12
200613,233Not reported12 of 12
200711,819Not reported12 of 12
200813,061Not reported12 of 12
200912,276Not reported12 of 12
201011,41356.6%12 of 12
201113,58167.4%12 of 12
20127,64637.8%12 of 12
20138,78243.6%12 of 12
201412,25860.8%12 of 12
201510,73253.3%12 of 12
201610,83753.6%12 of 12
201710,78053.5%12 of 12
20188,54942.4%12 of 12
201911,31656.2%12 of 12
20209,35746.3%12 of 12
20213,58317.8%12 of 12
20224,69923.3%12 of 12
2023340.2%12 of 12
20247,79738.6%12 of 12
20251,4517.2%12 of 12
2026 (provisional, partial year)Not reportedNot reported0 of 7

* 2026 covers January to July and is provisional. Capacity factor is net generation divided by nameplate capacity times the hours of each reported month.

Power prices and basis

Free account

No verified ISO price node is linked to this plant, or its price history could not load.

Emissions

Free · EPA CAMPD

No EPA emissions units are linked to this plant.

Water use

Free · EIA-923 cooling, USGS

No EIA cooling-water record for this plant in 2024. Plants without steam cooling, such as wind, solar and batteries, do not report cooling water.

Generators

Free · EIA-860M
GeneratorTechnologyNameplate MWOnline since
COX1Conventional Hydroelectric2.3April 1993

Ownership and offtake

Pro
Pro

Ownership and offtake are part of Pro

Owners and their shares, parent companies, and power purchase agreements with their buyers. EIA-860M lists Rio Blanco Water Conserv Dist as the operator, which is not always the owner.

Modeled data

Pro

Pro adds modeled values for this plant. Everything above stays free.

Analyst and MCP

300 analyst questions a month, plus MCP

Query Taylor Draw Hydroelectric Facility and 14,224 other projects from Claude or your own tools. Free accounts get 1 question a day.

Power plants near Taylor Draw Hydroelectric Facility

Questions about Taylor Draw Hydroelectric Facility

How much power does Taylor Draw Hydroelectric Facility produce?

Taylor Draw Hydroelectric Facility reported 1,451 MWh (1.45 GWh) of net generation in 2025, a 7.2% capacity factor on 2.3 MW of nameplate capacity.

Where is Taylor Draw Hydroelectric Facility?

Taylor Draw Hydroelectric Facility is in Rio Blanco County, Colorado, at 40.1063, −108.7112. It is in the Western Area Power Administration - Rocky Mountain Region balancing area (WACM).

Who operates Taylor Draw Hydroelectric Facility?

EIA-860M for August 2026 lists Rio Blanco Water Conserv Dist as the operator (EIA operator ID 16070). The operator is not always the owner.

When did Taylor Draw Hydroelectric Facility start operating?

Its first generator began operating in April 1993, according to EIA-860M.

Sources

  • EIA-860 2025 (final) and EIA-860M August 2026: plant, generators, capacity, operator and location
  • EIA-923 monthly net generation, 2000 to July 2026 (2026 provisional)

Page updated 2026-10-04 from the InfraMap data build. Methodology · Data sources · EIA plant page