Natural gasOperatingSOCO

Mid-Georgia Cogeneration Facility

Natural gas power plant in Houston County, Georgia. 323 MW of nameplate capacity across 3 generators, operated by SEPG MGA, LLC.

Also known as Mid-Georgia Cogeneration Facility Gas Plant · EIA plant 55040

Analyst: free account, 1 question a day.

CG PS Portfolio 1, LLCRobinsTwiggs SolarSR PerryRobins Air Force Base SolarCoody CochranMid-Georgia Cogenerat…10 km
Open in the map
6 plants within 25 km, from EIA coordinates.

Key facts

Capacity
323 MWNameplate
Generators
3 operatingEIA-860M, August 2026
Operating since
October 1997First generator online
Operator
SEPG MGA, LLCEIA operator ID 12564
Grid
SOCOBalancing authority SOCO
Price nodes
None linkedNo verified ISO node
Location
Houston County, GA32.4856, −83.6039
EIA plant ID
55040EIA plant page

Data as of EIA-860M August 2026 (published 2026-09-24). Capacity is nameplate, not live output.

How much power Mid-Georgia Cogeneration Facility produces

Free · EIA-923

Net generation, 2025

179 GWh

179,249 MWh, final

Capacity factor, 2025

6.3%

2024: 4.1%

January to July 2026

87.6 GWh

Provisional

Range, 2015 to 2025

116.2–481.6

GWh a year. Low 2024, high 2016

Annual net generation, GWhCapacity factor below each year
Annual net generation from EIA-923
YearNet generation, MWhCapacity factorMonths reported
2000685,159Not reported12 of 12
2001386,085Not reported12 of 12
2002388,372Not reported12 of 12
2003207,241Not reported12 of 12
200432,501Not reported12 of 12
2005140,773Not reported12 of 12
2006177,932Not reported12 of 12
2007274,279Not reported12 of 12
2008113,555Not reported12 of 12
200925,308Not reported11 of 12
2010178,0246.3%12 of 12
2011260,7749.2%12 of 12
2012380,25813.4%12 of 12
201373,393Not reported12 of 12
2014197,0487.0%12 of 12
2015241,7728.5%12 of 12
2016481,60417.0%12 of 12
2017144,9435.5%11 of 12
2018211,3367.5%12 of 12
2019230,0178.1%12 of 12
2020138,7674.9%12 of 12
2021165,3795.8%12 of 12
2022461,89816.3%12 of 12
2023146,5455.2%12 of 12
2024116,2194.1%12 of 12
2025179,2496.3%12 of 12
2026 (provisional, partial year)87,5895.3%7 of 7

* 2026 covers January to July and is provisional. Capacity factor is net generation divided by nameplate capacity times the hours of each reported month.

Power prices and basis

Free account

No verified ISO price node is linked to this plant, or its price history could not load.

Emissions

Free · EPA CAMPD

CO₂, 2025

91,479

US short tons. 2024: 56,751

SO₂, 2025

3

US short tons

NOx, 2025

28

US short tons

CO₂ per MWh, calculated

0.51 t

About 1,021 lb per MWh

2 of 2 EPA units reported CO₂ in 2025 (1, 2), matched to EIA plant 55040 through the EPA–EIA crosswalk. The per-MWh rate is EPA CO₂ divided by EIA-923 net generation. The two reporting boundaries can differ.

Water use

Free · EIA-923 cooling, USGS

Withdrawal, 2024

47

million gallons

Consumption, 2024

44

million gallons

Source

MUNICIPAL

Ground, Fresh. Induced-draft tower

Watershed stress

Low · 0.342

USGS SUI, HUC12 Lower Mossy Creek

12 of 12 cooling months report withdrawal. Groundwater user; SUI describes surface water and is context only. Blank volumes are unreported, not zero.

Generators

Free · EIA-860M
GeneratorTechnologyNameplate MWOnline since
CT1Natural Gas Fired Combined Cycle106.5October 1997
CT2Natural Gas Fired Combined Cycle106.5February 1998
ST1Natural Gas Fired Combined Cycle110.0December 1997

Ownership and offtake

Pro
Pro

Ownership and offtake are part of Pro

Owners and their shares, parent companies, and power purchase agreements with their buyers. EIA-860M lists SEPG MGA, LLC as the operator, which is not always the owner.

Modeled data

Pro

Pro adds modeled values for this plant. Everything above stays free.

Modeled

Generation potential vs reported

Monthly potential at seasonal net capability, next to EIA-923 output. Shows how much of the plant's capability was used.

Analyst and MCP

300 analyst questions a month, plus MCP

Query Mid-Georgia Cogeneration Facility and 14,224 other projects from Claude or your own tools. Free accounts get 1 question a day.

Power plants near Mid-Georgia Cogeneration Facility

Questions about Mid-Georgia Cogeneration Facility

How much power does Mid-Georgia Cogeneration Facility produce?

Mid-Georgia Cogeneration Facility reported 179,249 MWh (179 GWh) of net generation in 2025, a 6.3% capacity factor on 323 MW of nameplate capacity. From January to July 2026 it reported 87.6 GWh, which is provisional.

Where is Mid-Georgia Cogeneration Facility?

Mid-Georgia Cogeneration Facility is in Houston County, Georgia, at 32.4856, −83.6039. It is in the Southern Company Services, Inc. - Trans balancing area (SOCO).

Who operates Mid-Georgia Cogeneration Facility?

EIA-860M for August 2026 lists SEPG MGA, LLC as the operator (EIA operator ID 12564). The operator is not always the owner.

When did Mid-Georgia Cogeneration Facility start operating?

Its first generator began operating in October 1997, according to EIA-860M.

Sources

  • EIA-860 2025 (final) and EIA-860M August 2026: plant, generators, capacity, operator and location
  • EIA-923 monthly net generation, 2000 to July 2026 (2026 provisional)
  • EPA CAMPD annual emissions through the EPA–EIA crosswalk, 1995 to 2025
  • EIA-923 cooling water 2024 and the USGS surface water supply and use index, Water years 2010-2020 (Oct 2009 to Sep 2020), mean of monthly values
  • Plant names from OpenStreetMap, © OpenStreetMap contributors (ODbL)

Page updated 2026-10-04 from the InfraMap data build. Methodology · Data sources · EIA plant page