Key facts

Capacity
550.2 MWNameplate
Generators
3 operatingEIA-860M, August 2026
Operating since
May 2000First generator online
Operator
Casco Bay Energy Co LLCEIA operator ID 4966
Grid
ISO-NEBalancing authority ISNE
Price nodes
2 ISONE nodesResource nodes with prices
Location
Penobscot County, ME44.8242, −68.7094
EIA plant ID
55068EIA plant page

Data as of EIA-860M August 2026 (published 2026-09-24). Capacity is nameplate, not live output.

How much power Maine Independence Station produces

Free · EIA-923

Net generation, 2025

1.43 TWh

1,433,435 MWh, final

Capacity factor, 2025

29.7%

2024: 52.7%

January to July 2026

Not reported

Provisional. 0 of 7 months reported

Range, 2015 to 2025

0.2–2.5

TWh a year. Low 2020, high 2024

Annual net generation, TWhCapacity factor below each year
Annual net generation from EIA-923
YearNet generation, MWhCapacity factorMonths reported
2000470,108Not reported12 of 12
20013,349,109Not reported12 of 12
20023,766,773Not reported12 of 12
20032,381,633Not reported12 of 12
20042,740,089Not reported12 of 12
20052,655,734Not reported12 of 12
20062,187,905Not reported12 of 12
20071,903,233Not reported12 of 12
20081,656,642Not reported12 of 12
20092,329,559Not reported12 of 12
20102,657,58755.1%12 of 12
20111,775,90536.8%12 of 12
20121,243,50025.7%12 of 12
2013362,196Not reported12 of 12
20141,111,64623.1%12 of 12
2015330,3586.9%12 of 12
2016551,18711.4%12 of 12
2017332,2256.9%12 of 12
2018234,8874.9%12 of 12
2019273,9765.7%12 of 12
2020180,559Not reported12 of 12
2021534,68211.1%12 of 12
2022669,59813.9%12 of 12
2023936,92119.4%12 of 12
20242,546,84452.7%12 of 12
20251,433,43529.7%12 of 12
2026 (provisional, partial year)Not reportedNot reported0 of 7

* 2026 covers January to July and is provisional. Capacity factor is net generation divided by nameplate capacity times the hours of each reported month.

Power prices and basis

Free account · ISONE

Emissions

Free · EPA CAMPD

CO₂, 2025

616,184

US short tons. 2024: 1.09M

SO₂, 2025

3

US short tons

NOx, 2025

66

US short tons

CO₂ per MWh, calculated

0.43 t

About 860 lb per MWh

2 of 2 EPA units reported CO₂ in 2025 (1, 2), matched to EIA plant 55068 through the EPA–EIA crosswalk. The per-MWh rate is EPA CO₂ divided by EIA-923 net generation. The two reporting boundaries can differ.

Water use

Free · EIA-923 cooling, USGS

Withdrawal, 2024

547

million gallons

Consumption, 2024

505

million gallons

Source

Penobscot River

Surface, Brackish. Induced-draft tower

Watershed stress

Very low/none · 0.119

USGS SUI, HUC12 Felts Brook-Penobscot River

12 of 12 cooling months report withdrawal. Saline, brackish or ocean intake; not tested. Blank volumes are unreported, not zero.

Generators

Free · EIA-860M
GeneratorTechnologyNameplate MWOnline since
GEN1Natural Gas Fired Combined Cycle177.8May 2000
GEN2Natural Gas Fired Combined Cycle177.8May 2000
GEN3Natural Gas Fired Combined Cycle194.6May 2000

Ownership and offtake

Pro
Pro

Ownership and offtake are part of Pro

Owners and their shares, parent companies, and power purchase agreements with their buyers. EIA-860M lists Casco Bay Energy Co LLC as the operator, which is not always the owner.

Modeled data

Pro

Pro adds modeled values for this plant. Everything above stays free.

Modeled

Generation potential vs reported

Monthly potential at seasonal net capability, next to EIA-923 output. Shows how much of the plant's capability was used.

Analyst and MCP

300 analyst questions a month, plus MCP

Query Maine Independence Station and 14,224 other projects from Claude or your own tools. Free accounts get 1 question a day.

Power plants near Maine Independence Station

Questions about Maine Independence Station

How much power does Maine Independence Station produce?

Maine Independence Station reported 1,433,435 MWh (1.43 TWh) of net generation in 2025, a 29.7% capacity factor on 550.2 MW of nameplate capacity.

Where is Maine Independence Station?

Maine Independence Station is in Penobscot County, Maine, at 44.8242, −68.7094. It is in the ISO New England Inc. balancing area (ISNE).

Who operates Maine Independence Station?

EIA-860M for August 2026 lists Casco Bay Energy Co LLC as the operator (EIA operator ID 4966). The operator is not always the owner.

When did Maine Independence Station start operating?

Its first generator began operating in May 2000, according to EIA-860M.

Does InfraMap have power prices for Maine Independence Station?

Yes. InfraMap has ISONE day-ahead and real-time prices at 2 price nodes linked to Maine Independence Station, with the hub price and node-to-hub basis. Prices are free with an InfraMap account; pricing node names are part of InfraMap Pro.

Sources

  • EIA-860 2025 (final) and EIA-860M August 2026: plant, generators, capacity, operator and location
  • EIA-923 monthly net generation, 2000 to July 2026 (2026 provisional)
  • EPA CAMPD annual emissions through the EPA–EIA crosswalk, 1995 to 2025
  • ISONE day-ahead and real-time prices; node and hub assignments as of 2026-10-05
  • EIA-923 cooling water 2024 and the USGS surface water supply and use index, Water years 2010-2020 (Oct 2009 to Sep 2020), mean of monthly values
  • Plant names from OpenStreetMap, © OpenStreetMap contributors (ODbL)

Page updated 2026-10-04 from the InfraMap data build. Methodology · Data sources · EIA plant page