Natural gasOperatingERCOT

Wolf Hollow I LP

Natural gas power plant in Hood County, Texas. 788.4 MW of nameplate capacity across 3 generators, operated by Wolf Hollow I Power, LLC.

Also known as Wolf Hollow I power plant · EIA plant 55139

Analyst: free account, 1 question a day.

Comanche PeakDeCordova Steam Electric StationWalnut Springs SolarJohnson CountyWolf Hollow I LP20 km
Open in the map
5 plants within 31 km, from EIA coordinates.

Key facts

Capacity
788.4 MWNameplate
Generators
3 operatingEIA-860M, August 2026
Operating since
August 2003First generator online
Operator
Wolf Hollow I Power, LLCEIA operator ID 313
Grid
ERCOTBalancing authority ERCO
Price nodes
None linkedNo verified ISO node
Location
Hood County, TX32.3342, −97.7317
EIA plant ID
55139EIA plant page

Data as of EIA-860M August 2026 (published 2026-09-24). Capacity is nameplate, not live output.

How much power Wolf Hollow I LP produces

Free · EIA-923

Net generation, 2025

3.00 TWh

3,003,715 MWh, final

Capacity factor, 2025

43.5%

2024: 46.4%

January to July 2026

1.78 TWh

Provisional

Range, 2015 to 2025

1.4–3.2

TWh a year. Low 2018, high 2024

Annual net generation, TWhCapacity factor below each year
Annual net generation from EIA-923
YearNet generation, MWhCapacity factorMonths reported
2000Not reportedNot reported0 of 12
2001Not reportedNot reported0 of 12
2002Not reportedNot reported0 of 12
2003956,488Not reported4 of 12
20042,399,009Not reported12 of 12
20053,070,301Not reported12 of 12
20063,831,173Not reported12 of 12
20073,302,505Not reported12 of 12
20083,454,004Not reported12 of 12
20092,999,681Not reported12 of 12
20102,771,57739.1%12 of 12
20112,491,19335.1%12 of 12
20122,537,52135.7%12 of 12
20133,014,902Not reported12 of 12
20143,815,43355.2%12 of 12
20152,975,76343.1%12 of 12
20163,030,29443.8%12 of 12
20172,453,28535.5%12 of 12
20181,407,01720.4%12 of 12
20192,292,13433.2%12 of 12
20202,079,790Not reported12 of 12
20212,285,98733.1%12 of 12
20222,438,37635.3%12 of 12
20233,093,06244.8%12 of 12
20243,210,12346.4%12 of 12
20253,003,71543.5%12 of 12
2026 (provisional, partial year)1,776,84744.3%7 of 7

* 2026 covers January to July and is provisional. Capacity factor is net generation divided by nameplate capacity times the hours of each reported month.

Power prices and basis

Free account

No verified ISO price node is linked to this plant, or its price history could not load.

Emissions

Free · EPA CAMPD

CO₂, 2025

1.33M

US short tons. 2024: 1.40M

SO₂, 2025

7

US short tons

NOx, 2025

269

US short tons

CO₂ per MWh, calculated

0.44 t

About 883 lb per MWh

2 of 2 EPA units reported CO₂ in 2025 (CTG1, CTG2), matched to EIA plant 55139 through the EPA–EIA crosswalk. The per-MWh rate is EPA CO₂ divided by EIA-923 net generation. The two reporting boundaries can differ.

Water use

Free · EIA-923 cooling, USGS

Withdrawal, 2024

773

million gallons

Consumption, 2024

600

million gallons

Source

LAKE GRANBURY

Surface, Fresh. Induced-draft tower

Watershed stress

High · 0.659

USGS SUI, HUC12 Georges Creek-Brazos River

12 of 12 cooling months report withdrawal. SUI of the HUC12 containing the plant. Blank volumes are unreported, not zero.

Generators

Free · EIA-860M
GeneratorTechnologyNameplate MWOnline since
CTG1Natural Gas Fired Combined Cycle243.9August 2003
CTG2Natural Gas Fired Combined Cycle243.9August 2003
STNatural Gas Fired Combined Cycle300.6August 2003

Ownership and offtake

Pro
Pro

Ownership and offtake are part of Pro

Owners and their shares, parent companies, and power purchase agreements with their buyers. EIA-860M lists Wolf Hollow I Power, LLC as the operator, which is not always the owner.

Modeled data

Pro

Pro adds modeled values for this plant. Everything above stays free.

Modeled

Generation potential vs reported

Monthly potential at seasonal net capability, next to EIA-923 output. Shows how much of the plant's capability was used.

Analyst and MCP

300 analyst questions a month, plus MCP

Query Wolf Hollow I LP and 14,224 other projects from Claude or your own tools. Free accounts get 1 question a day.

Power plants near Wolf Hollow I LP

Questions about Wolf Hollow I LP

How much power does Wolf Hollow I LP produce?

Wolf Hollow I LP reported 3,003,715 MWh (3.00 TWh) of net generation in 2025, a 43.5% capacity factor on 788.4 MW of nameplate capacity. From January to July 2026 it reported 1.78 TWh, which is provisional.

Where is Wolf Hollow I LP?

Wolf Hollow I LP is in Hood County, Texas, at 32.3342, −97.7317. It is in the Electric Reliability Council of Texas, Inc. balancing area (ERCO).

Who operates Wolf Hollow I LP?

EIA-860M for August 2026 lists Wolf Hollow I Power, LLC as the operator (EIA operator ID 313). The operator is not always the owner.

When did Wolf Hollow I LP start operating?

Its first generator began operating in August 2003, according to EIA-860M.

Sources

  • EIA-860 2025 (final) and EIA-860M August 2026: plant, generators, capacity, operator and location
  • EIA-923 monthly net generation, 2000 to July 2026 (2026 provisional)
  • EPA CAMPD annual emissions through the EPA–EIA crosswalk, 1995 to 2025
  • EIA-923 cooling water 2024 and the USGS surface water supply and use index, Water years 2010-2020 (Oct 2009 to Sep 2020), mean of monthly values
  • Plant names from OpenStreetMap, © OpenStreetMap contributors (ODbL)

Page updated 2026-10-04 from the InfraMap data build. Methodology · Data sources · EIA plant page