Natural gasOperatingERCOT

Bastrop Energy Center

Natural gas power plant in Bastrop County, Texas. 618.7 MW of nameplate capacity across 3 generators, operated by Bastrop Energy Partners, LP.

Also known as EIA plant 55168

Analyst: free account, 1 question a day.

Sand HillWebberville Solar ProjectGFTX BESSBastrop5 km
Open in the map
5 plants within 13 km, from EIA coordinates.

Key facts

Capacity
618.7 MWNameplate
Generators
3 operatingEIA-860M, August 2026
Operating since
May 2002First generator online
Operator
Bastrop Energy Partners, LPEIA operator ID 49768
Grid
ERCOTBalancing authority ERCO
Price nodes
None linkedNo verified ISO node
Location
Bastrop County, TX30.1458, −97.5500
EIA plant ID
55168EIA plant page

Data as of EIA-860M August 2026 (published 2026-09-24). Capacity is nameplate, not live output.

How much power Bastrop produces

Free · EIA-923

Net generation, 2025

2.30 TWh

2,298,192 MWh, final

Capacity factor, 2025

42.4%

2024: 55.8%

January to July 2026

1.49 TWh

Provisional

Range, 2015 to 2025

1.9–3.4

TWh a year. Low 2021, high 2015

Annual net generation, TWhCapacity factor below each year
Annual net generation from EIA-923
YearNet generation, MWhCapacity factorMonths reported
2000Not reportedNot reported0 of 12
2001Not reportedNot reported0 of 12
20021,457,477Not reported8 of 12
20031,446,952Not reported12 of 12
20041,331,506Not reported12 of 12
20051,579,760Not reported12 of 12
20061,978,286Not reported12 of 12
20072,222,228Not reported12 of 12
20082,062,119Not reported12 of 12
20092,318,361Not reported12 of 12
20101,512,59723.7%12 of 12
20112,492,130Not reported12 of 12
20122,880,688Not reported12 of 12
20132,535,607Not reported12 of 12
20143,071,96356.7%12 of 12
20153,397,29162.7%12 of 12
20162,785,75151.3%12 of 12
20172,093,83738.6%12 of 12
20182,074,49738.3%12 of 12
20192,311,02842.6%12 of 12
20202,562,77047.2%12 of 12
20211,857,033Not reported12 of 12
20222,873,431Not reported12 of 12
20233,022,11555.8%12 of 12
20243,033,75455.8%12 of 12
20252,298,19242.4%12 of 12
2026 (provisional, partial year)1,488,23447.3%7 of 7

* 2026 covers January to July and is provisional. Capacity factor is net generation divided by nameplate capacity times the hours of each reported month.

Power prices and basis

Free account

No verified ISO price node is linked to this plant, or its price history could not load.

Emissions

Free · EPA CAMPD

CO₂, 2025

996,813

US short tons. 2024: 1.37M

SO₂, 2025

5

US short tons

NOx, 2025

204

US short tons

CO₂ per MWh, calculated

0.43 t

About 867 lb per MWh

2 of 2 EPA units reported CO₂ in 2025 (CTG-1A, CTG-1B), matched to EIA plant 55168 through the EPA–EIA crosswalk. The per-MWh rate is EPA CO₂ divided by EIA-923 net generation. The two reporting boundaries can differ.

Water use

Free · EIA-923 cooling, USGS

Withdrawal, 2024

802

million gallons

Consumption, 2024

651

million gallons

Source

Municipal, Colorado River

Surface, Fresh. Induced-draft tower

Watershed stress

High · 0.606

USGS SUI, HUC12 Maha Creek

12 of 12 cooling months report withdrawal. SUI of the HUC12 containing the plant. Blank volumes are unreported, not zero.

Generators

Free · EIA-860M
GeneratorTechnologyNameplate MWOnline since
0001Natural Gas Fired Combined Cycle188.2May 2002
0002Natural Gas Fired Combined Cycle188.2May 2002
0003Natural Gas Fired Combined Cycle242.3May 2002

Ownership and offtake

Pro
Pro

Ownership and offtake are part of Pro

Owners and their shares, parent companies, and power purchase agreements with their buyers. EIA-860M lists Bastrop Energy Partners, LP as the operator, which is not always the owner.

Modeled data

Pro

Pro adds modeled values for this plant. Everything above stays free.

Modeled

Generation potential vs reported

Monthly potential at seasonal net capability, next to EIA-923 output. Shows how much of the plant's capability was used.

Analyst and MCP

300 analyst questions a month, plus MCP

Query Bastrop Energy Center and 14,224 other projects from Claude or your own tools. Free accounts get 1 question a day.

Power plants near Bastrop

Questions about Bastrop

How much power does Bastrop Energy Center produce?

Bastrop Energy Center reported 2,298,192 MWh (2.30 TWh) of net generation in 2025, a 42.4% capacity factor on 618.7 MW of nameplate capacity. From January to July 2026 it reported 1.49 TWh, which is provisional.

Where is Bastrop Energy Center?

Bastrop Energy Center is in Bastrop County, Texas, at 30.1458, −97.5500. It is in the Electric Reliability Council of Texas, Inc. balancing area (ERCO).

Who operates Bastrop Energy Center?

EIA-860M for August 2026 lists Bastrop Energy Partners, LP as the operator (EIA operator ID 49768). The operator is not always the owner.

When did Bastrop Energy Center start operating?

Its first generator began operating in May 2002, according to EIA-860M.

Sources

  • EIA-860 2025 (final) and EIA-860M August 2026: plant, generators, capacity, operator and location
  • EIA-923 monthly net generation, 2000 to July 2026 (2026 provisional)
  • EPA CAMPD annual emissions through the EPA–EIA crosswalk, 1995 to 2025
  • EIA-923 cooling water 2024 and the USGS surface water supply and use index, Water years 2010-2020 (Oct 2009 to Sep 2020), mean of monthly values

Page updated 2026-10-04 from the InfraMap data build. Methodology · Data sources · EIA plant page