Natural gasOperatingERCOT

Odessa-Ector Power Plant

Natural gas power plant in Ector County, Texas. 1,152.8 MW of nameplate capacity across 6 generators, operated by LaFrontera Holdings LLC.

Also known as Odessa Ector Power Partners · EIA plant 55215

Analyst: free account, 1 question a day.

Quail Run Energy CenterWAL537OdessaN. Mary FrancisOdessa-Ector5 km
Open in the map
6 plants within 13 km, from EIA coordinates.

Key facts

Capacity
1,152.8 MWNameplate
Generators
6 operatingEIA-860M, August 2026
Operating since
July 2001First generator online
Operator
LaFrontera Holdings LLCEIA operator ID 60477
Grid
ERCOTBalancing authority ERCO
Price nodes
None linkedNo verified ISO node
Location
Ector County, TX31.8403, −102.3264
EIA plant ID
55215EIA plant page

Data as of EIA-860M August 2026 (published 2026-09-24). Capacity is nameplate, not live output.

How much power Odessa-Ector produces

Free · EIA-923

Net generation, 2025

8.06 TWh

8,062,011 MWh, final

Capacity factor, 2025

79.8%

2024: 74.1%

January to July 2026

4.78 TWh

Provisional

Range, 2015 to 2025

4.1–8.1

TWh a year. Low 2016, high 2025

Annual net generation, TWhCapacity factor below each year
Annual net generation from EIA-923
YearNet generation, MWhCapacity factorMonths reported
2000Not reportedNot reported0 of 12
20011,491,822Not reported6 of 12
20024,789,972Not reported12 of 12
20034,640,858Not reported12 of 12
20044,842,629Not reported12 of 12
20054,868,981Not reported12 of 12
20064,977,708Not reported12 of 12
20074,352,437Not reported12 of 12
20082,856,383Not reported12 of 12
20093,098,867Not reported12 of 12
20102,982,70330.0%12 of 12
20112,303,07123.2%12 of 12
20123,562,66635.7%12 of 12
20134,465,750Not reported12 of 12
20144,782,04947.4%12 of 12
20155,809,35657.5%12 of 12
20164,061,47640.1%12 of 12
20174,495,72244.5%12 of 12
20187,420,29473.5%12 of 12
20197,366,950Not reported12 of 12
20206,761,970Not reported12 of 12
20214,273,24042.3%12 of 12
20225,840,31757.8%12 of 12
20236,978,84269.1%12 of 12
20247,501,52374.1%12 of 12
20258,062,01179.8%12 of 12
2026 (provisional, partial year)4,780,15181.5%7 of 7

* 2026 covers January to July and is provisional. Capacity factor is net generation divided by nameplate capacity times the hours of each reported month.

Power prices and basis

Free account

No verified ISO price node is linked to this plant, or its price history could not load.

Emissions

Free · EPA CAMPD

CO₂, 2025

3.35M

US short tons. 2024: 3.08M

SO₂, 2025

17

US short tons

NOx, 2025

751

US short tons

CO₂ per MWh, calculated

0.42 t

About 832 lb per MWh

4 of 4 EPA units reported CO₂ in 2025 (GT1, GT2, GT3, GT4), matched to EIA plant 55215 through the EPA–EIA crosswalk. The per-MWh rate is EPA CO₂ divided by EIA-923 net generation. The two reporting boundaries can differ.

Water use

Free · EIA-923 cooling, USGS

Withdrawal, 2024

1,948

million gallons

Consumption, 2024

1,671

million gallons

Source

Wells

Ground, Fresh. Induced-draft tower

Watershed stress

Severe · 1.000

USGS SUI, HUC12 City of Odessa-Willow Well

24 of 24 cooling months report withdrawal. Groundwater user; SUI describes surface water and is context only. Blank volumes are unreported, not zero.

Generators

Free · EIA-860M
GeneratorTechnologyNameplate MWOnline since
CTG1Natural Gas Fired Combined Cycle176.0July 2001
CTG2Natural Gas Fired Combined Cycle176.0July 2001
CTG3Natural Gas Fired Combined Cycle176.0August 2001
CTG4Natural Gas Fired Combined Cycle176.0August 2001
STG1Natural Gas Fired Combined Cycle224.4July 2001
STG2Natural Gas Fired Combined Cycle224.4August 2001

Ownership and offtake

Pro
Pro

Ownership and offtake are part of Pro

Owners and their shares, parent companies, and power purchase agreements with their buyers. EIA-860M lists LaFrontera Holdings LLC as the operator, which is not always the owner.

Modeled data

Pro

Pro adds modeled values for this plant. Everything above stays free.

Modeled

Generation potential vs reported

Monthly potential at seasonal net capability, next to EIA-923 output. Shows how much of the plant's capability was used.

Analyst and MCP

300 analyst questions a month, plus MCP

Query Odessa-Ector Power Plant and 14,224 other projects from Claude or your own tools. Free accounts get 1 question a day.

Power plants near Odessa-Ector

More plants operated by LaFrontera Holdings LLC

Questions about Odessa-Ector

How much power does Odessa-Ector Power Plant produce?

Odessa-Ector Power Plant reported 8,062,011 MWh (8.06 TWh) of net generation in 2025, a 79.8% capacity factor on 1,152.8 MW of nameplate capacity. From January to July 2026 it reported 4.78 TWh, which is provisional.

Where is Odessa-Ector Power Plant?

Odessa-Ector Power Plant is in Ector County, Texas, at 31.8403, −102.3264. It is in the Electric Reliability Council of Texas, Inc. balancing area (ERCO).

Who operates Odessa-Ector Power Plant?

EIA-860M for August 2026 lists LaFrontera Holdings LLC as the operator (EIA operator ID 60477). The operator is not always the owner.

When did Odessa-Ector Power Plant start operating?

Its first generator began operating in July 2001, according to EIA-860M.

Sources

  • EIA-860 2025 (final) and EIA-860M August 2026: plant, generators, capacity, operator and location
  • EIA-923 monthly net generation, 2000 to July 2026 (2026 provisional)
  • EPA CAMPD annual emissions through the EPA–EIA crosswalk, 1995 to 2025
  • EIA-923 cooling water 2024 and the USGS surface water supply and use index, Water years 2010-2020 (Oct 2009 to Sep 2020), mean of monthly values
  • Plant names from OpenStreetMap, © OpenStreetMap contributors (ODbL)

Page updated 2026-10-04 from the InfraMap data build. Methodology · Data sources · EIA plant page