Natural gasOperatingISO-NE

Westbrook Energy Center Power Plant

Natural gas power plant in Cumberland County, Maine. 563.9 MW of nameplate capacity across 3 generators, operated by Westbrook Energy Center.

Also known as Westbrook Energy Center · EIA plant 55294

Analyst: free account, 1 question a day.

Regional Waste SystemsCross Town Energy Sto…S D Warren WestbrookBWC Beech Ridge Brook, LLC2 km
Open in the map
5 plants within 5.4 km, from EIA coordinates.

Key facts

Capacity
563.9 MWNameplate
Generators
3 operatingEIA-860M, August 2026
Operating since
May 2001First generator online
Operator
Westbrook Energy CenterEIA operator ID 2891
Grid
ISO-NEBalancing authority ISNE
Price nodes
2 ISONE nodesResource nodes with prices
Location
Cumberland County, ME43.6575, −70.3750
EIA plant ID
55294EIA plant page

Data as of EIA-860M August 2026 (published 2026-09-24). Capacity is nameplate, not live output.

How much power Westbrook Energy Center produces

Free · EIA-923

Net generation, 2025

3.39 TWh

3,387,942 MWh, final

Capacity factor, 2025

68.6%

2024: 61.0%

January to July 2026

1.91 TWh

Provisional

Range, 2015 to 2025

1.0–3.4

TWh a year. Low 2019, high 2025

Annual net generation, TWhCapacity factor below each year
Annual net generation from EIA-923
YearNet generation, MWhCapacity factorMonths reported
2000Not reportedNot reported0 of 12
20012,736,226Not reported12 of 12
20023,932,713Not reported12 of 12
20033,250,569Not reported12 of 12
20043,430,642Not reported12 of 12
20053,457,627Not reported12 of 12
20063,219,462Not reported12 of 12
20072,392,906Not reported12 of 12
20082,698,596Not reported12 of 12
20092,497,380Not reported12 of 12
20102,689,17554.4%12 of 12
20112,659,93553.8%12 of 12
20122,446,08349.4%12 of 12
20132,372,883Not reported12 of 12
20141,838,91137.2%12 of 12
20151,848,00437.4%12 of 12
20162,183,06744.1%12 of 12
20171,343,47027.2%12 of 12
20181,488,10930.1%12 of 12
2019957,05519.4%12 of 12
20201,011,02920.4%12 of 12
20211,876,32038.0%12 of 12
20222,461,72049.8%12 of 12
20232,356,89747.7%12 of 12
20243,022,42261.0%12 of 12
20253,387,94268.6%12 of 12
2026 (provisional, partial year)1,907,59466.5%7 of 7

* 2026 covers January to July and is provisional. Capacity factor is net generation divided by nameplate capacity times the hours of each reported month.

Power prices and basis

Free account · ISONE

Emissions

Free · EPA CAMPD

CO₂, 2025

1.36M

US short tons. 2024: 1.21M

SO₂, 2025

7

US short tons

NOx, 2025

128

US short tons

CO₂ per MWh, calculated

0.40 t

About 801 lb per MWh

2 of 2 EPA units reported CO₂ in 2025 (1, 2), matched to EIA plant 55294 through the EPA–EIA crosswalk. The per-MWh rate is EPA CO₂ divided by EIA-923 net generation. The two reporting boundaries can differ.

Water use

Free · EIA-923 cooling, USGS

Withdrawal, 2024

613

million gallons

Consumption, 2024

527

million gallons

Source

MUNICIPAL SUPPLY

Surface, Fresh. Induced-draft tower

Watershed stress

Very low/none · 0.146

USGS SUI, HUC12 Stroudwater River

12 of 12 cooling months report withdrawal. SUI of the HUC12 containing the plant. Blank volumes are unreported, not zero.

Generators

Free · EIA-860M
GeneratorTechnologyNameplate MWOnline since
GTG1Natural Gas Fired Combined Cycle184.2May 2001
GTG2Natural Gas Fired Combined Cycle184.2May 2001
STG3Natural Gas Fired Combined Cycle195.5May 2001

Ownership and offtake

Pro
Pro

Ownership and offtake are part of Pro

Owners and their shares, parent companies, and power purchase agreements with their buyers. EIA-860M lists Westbrook Energy Center as the operator, which is not always the owner.

Modeled data

Pro

Pro adds modeled values for this plant. Everything above stays free.

Modeled

Generation potential vs reported

Monthly potential at seasonal net capability, next to EIA-923 output. Shows how much of the plant's capability was used.

Analyst and MCP

300 analyst questions a month, plus MCP

Query Westbrook Energy Center Power Plant and 14,224 other projects from Claude or your own tools. Free accounts get 1 question a day.

Power plants near Westbrook Energy Center

Questions about Westbrook Energy Center

How much power does Westbrook Energy Center Power Plant produce?

Westbrook Energy Center Power Plant reported 3,387,942 MWh (3.39 TWh) of net generation in 2025, a 68.6% capacity factor on 563.9 MW of nameplate capacity. From January to July 2026 it reported 1.91 TWh, which is provisional.

Where is Westbrook Energy Center Power Plant?

Westbrook Energy Center Power Plant is in Cumberland County, Maine, at 43.6575, −70.3750. It is in the ISO New England Inc. balancing area (ISNE).

Who operates Westbrook Energy Center Power Plant?

EIA-860M for August 2026 lists Westbrook Energy Center as the operator (EIA operator ID 2891). The operator is not always the owner.

When did Westbrook Energy Center Power Plant start operating?

Its first generator began operating in May 2001, according to EIA-860M.

Does InfraMap have power prices for Westbrook Energy Center Power Plant?

Yes. InfraMap has ISONE day-ahead and real-time prices at 2 price nodes linked to Westbrook Energy Center Power Plant, with the hub price and node-to-hub basis. Prices are free with an InfraMap account; pricing node names are part of InfraMap Pro.

Sources

  • EIA-860 2025 (final) and EIA-860M August 2026: plant, generators, capacity, operator and location
  • EIA-923 monthly net generation, 2000 to July 2026 (2026 provisional)
  • EPA CAMPD annual emissions through the EPA–EIA crosswalk, 1995 to 2025
  • ISONE day-ahead and real-time prices; node and hub assignments as of 2026-10-05
  • EIA-923 cooling water 2024 and the USGS surface water supply and use index, Water years 2010-2020 (Oct 2009 to Sep 2020), mean of monthly values
  • Plant names from OpenStreetMap, © OpenStreetMap contributors (ODbL)

Page updated 2026-10-04 from the InfraMap data build. Methodology · Data sources · EIA plant page