Natural gasOperatingSOCO

Washington County Power LLC

Natural gas power plant in Washington County, Georgia. 795.6 MW of nameplate capacity across 4 generators, operated by CAMS (Georgia) Washington County Power.

Also known as EIA plant 55332

Analyst: free account, 1 question a day.

AL Sandersville LLCSinclair DamWashington County SolarWallace DamPutnam Erikson 2Wilkinson DeFore (Safari Energy)Washington County Power20 km
Open in the map
6 plants within 38 km, from EIA coordinates.

Key facts

Capacity
795.6 MWNameplate
Generators
4 operatingEIA-860M, August 2026
Operating since
June 2003First generator online
Operator
CAMS (Georgia) Washington County PowerEIA operator ID 66991
Grid
SOCOBalancing authority SOCO
Price nodes
None linkedNo verified ISO node
Location
Washington County, GA33.0922, −82.9800
EIA plant ID
55332EIA plant page

Data as of EIA-860M August 2026 (published 2026-09-24). Capacity is nameplate, not live output.

How much power Washington County Power produces

Free · EIA-923

Net generation, 2025

24.0 GWh

23,961 MWh, final. 1 of 12 months reported

Capacity factor, 2025

4.0%

2024: 2.5%

January to July 2026

Not reported

Provisional. 0 of 7 months reported

Range, 2015 to 2024

88.5–404.4

GWh a year. Low 2023, high 2022

Annual net generation, GWhCapacity factor below each year
Annual net generation from EIA-923
YearNet generation, MWhCapacity factorMonths reported
2000Not reportedNot reported0 of 12
2001Not reportedNot reported0 of 12
2002Not reportedNot reported0 of 12
20031,743Not reported12 of 12
20041,111Not reported12 of 12
200515,598Not reported12 of 12
200672,581Not reported12 of 12
200781,081Not reported12 of 12
200870,375Not reported12 of 12
200946,969Not reported12 of 12
2010252,8803.6%12 of 12
2011203,0332.9%12 of 12
2012274,9573.9%12 of 12
2013125,9451.8%12 of 12
201461,2740.9%12 of 12
2015197,5152.8%12 of 12
2016128,9291.8%12 of 12
2017118,6991.7%12 of 12
2018111,7021.6%12 of 12
2019223,6583.2%12 of 12
2020220,6043.2%12 of 12
2021125,4591.8%12 of 12
2022404,3545.8%12 of 12
202388,4591.3%12 of 12
2024172,3922.5%12 of 12
202523,9614.0%1 of 12
2026 (provisional, partial year)Not reportedNot reported0 of 7

* 2026 covers January to July and is provisional. Capacity factor is net generation divided by nameplate capacity times the hours of each reported month.

Power prices and basis

Free account

No verified ISO price node is linked to this plant, or its price history could not load.

Emissions

Free · EPA CAMPD

CO₂, 2025

337,165

US short tons. 2024: 251,245

SO₂, 2025

2

US short tons

NOx, 2025

133

US short tons

4 of 4 EPA units reported CO₂ in 2025 (T1, T2, T3, T4), matched to EIA plant 55332 through the EPA–EIA crosswalk.

Water use

Free · EIA-923 cooling, USGS

No EIA cooling-water record for this plant in 2024.

Generators

Free · EIA-860M
GeneratorTechnologyNameplate MWOnline since
1Natural Gas Fired Combustion Turbine198.9June 2003
2Natural Gas Fired Combustion Turbine198.9June 2003
3Natural Gas Fired Combustion Turbine198.9June 2003
4Natural Gas Fired Combustion Turbine198.9June 2003

Ownership and offtake

Pro
Pro

Ownership and offtake are part of Pro

Owners and their shares, parent companies, and power purchase agreements with their buyers. EIA-860M lists CAMS (Georgia) Washington County Power as the operator, which is not always the owner.

Modeled data

Pro

Pro adds modeled values for this plant. Everything above stays free.

Modeled

Generation potential vs reported

Monthly potential at seasonal net capability, next to EIA-923 output. Shows how much of the plant's capability was used.

Analyst and MCP

300 analyst questions a month, plus MCP

Query Washington County Power LLC and 14,224 other projects from Claude or your own tools. Free accounts get 1 question a day.

Power plants near Washington County Power

Questions about Washington County Power

How much power does Washington County Power LLC produce?

Washington County Power LLC reported 23,961 MWh (24.0 GWh) of net generation in 2025, a 4.0% capacity factor on 795.6 MW of nameplate capacity. 1 of 12 months were reported for 2025.

Where is Washington County Power LLC?

Washington County Power LLC is in Washington County, Georgia, at 33.0922, −82.9800. It is in the Southern Company Services, Inc. - Trans balancing area (SOCO).

Who operates Washington County Power LLC?

EIA-860M for August 2026 lists CAMS (Georgia) Washington County Power as the operator (EIA operator ID 66991). The operator is not always the owner.

When did Washington County Power LLC start operating?

Its first generator began operating in June 2003, according to EIA-860M.

Sources

  • EIA-860 2025 (final) and EIA-860M August 2026: plant, generators, capacity, operator and location
  • EIA-923 monthly net generation, 2000 to July 2026 (2026 provisional)
  • EPA CAMPD annual emissions through the EPA–EIA crosswalk, 1995 to 2025

Page updated 2026-10-04 from the InfraMap data build. Methodology · Data sources · EIA plant page