Natural gasOperatingMISO

Jack Fusco Energy Center

Natural gas power plant in Fort Bend County, Texas. 675.6 MW of nameplate capacity across 3 generators, operated by Brazos Valley Energy.

Also known as Brazos Valley Generating Facility · EIA plant 55357

Analyst: free account, 1 question a day.

Braes Bayou PlantPetra Nova Carbon Capture CogenCrowned Heron 1 - Sto…W A ParishBypass BESSJack Fusco500 m
Open in the map
5 plants within 1.3 km, from EIA coordinates.

Key facts

Capacity
675.6 MWNameplate
Generators
3 operatingEIA-860M, August 2026
Operating since
May 2003First generator online
Operator
Brazos Valley EnergyEIA operator ID 2171
Grid
MISOBalancing authority MISO
Price nodes
None linkedNo verified ISO node
Location
Fort Bend County, TX29.4731, −95.6244
EIA plant ID
55357EIA plant page

Data as of EIA-860M August 2026 (published 2026-09-24). Capacity is nameplate, not live output.

How much power Jack Fusco produces

Free · EIA-923

Net generation, 2025

3.65 TWh

3,645,651 MWh, final

Capacity factor, 2025

61.6%

2024: 57.3%

January to July 2026

2.23 TWh

Provisional

Range, 2015 to 2025

2.3–3.6

TWh a year. Low 2017, high 2025

Annual net generation, TWhCapacity factor below each year
Annual net generation from EIA-923
YearNet generation, MWhCapacity factorMonths reported
2000Not reportedNot reported0 of 12
2001Not reportedNot reported0 of 12
2002Not reportedNot reported0 of 12
20031,796,650Not reported12 of 12
20042,821,716Not reported12 of 12
20053,279,060Not reported12 of 12
20061,981,846Not reported12 of 12
20072,733,434Not reported12 of 12
20082,857,286Not reported12 of 12
20092,351,660Not reported12 of 12
20102,435,12441.1%12 of 12
20112,341,27839.6%12 of 12
20123,384,91557.0%12 of 12
20132,651,756Not reported12 of 12
20142,417,79940.9%12 of 12
20153,395,45457.4%12 of 12
20162,858,74248.2%12 of 12
20172,321,27439.2%12 of 12
20182,672,72349.4%11 of 12
20192,341,41439.6%12 of 12
20203,430,93857.8%12 of 12
20212,753,59246.5%12 of 12
20223,392,95557.3%12 of 12
20233,305,31455.8%12 of 12
20243,398,39957.3%12 of 12
20253,645,65161.6%12 of 12
2026 (provisional, partial year)2,232,23464.9%7 of 7

* 2026 covers January to July and is provisional. Capacity factor is net generation divided by nameplate capacity times the hours of each reported month.

Power prices and basis

Free account

No verified ISO price node is linked to this plant, or its price history could not load.

Emissions

Free · EPA CAMPD

CO₂, 2025

1.56M

US short tons. 2024: 1.48M

SO₂, 2025

8

US short tons

NOx, 2025

155

US short tons

CO₂ per MWh, calculated

0.43 t

About 855 lb per MWh

2 of 2 EPA units reported CO₂ in 2025 (CTG1, CTG2), matched to EIA plant 55357 through the EPA–EIA crosswalk. The per-MWh rate is EPA CO₂ divided by EIA-923 net generation. The two reporting boundaries can differ.

Water use

Free · EIA-923 cooling, USGS

Withdrawal, 2024

1,036

million gallons

Consumption, 2024

880

million gallons

Source

Brazos River

Surface, Fresh. Induced-draft tower

Watershed stress

Moderate · 0.494

USGS SUI, HUC12 Dry Bayou-Brazos River

12 of 12 cooling months report withdrawal. SUI of the source river HUC12 within 3 km. Blank volumes are unreported, not zero.

Generators

Free · EIA-860M
GeneratorTechnologyNameplate MWOnline since
CTG1Natural Gas Fired Combined Cycle200.0May 2003
CTG2Natural Gas Fired Combined Cycle200.0May 2003
STG1Natural Gas Fired Combined Cycle275.6May 2003

Ownership and offtake

Pro
Pro

Ownership and offtake are part of Pro

Owners and their shares, parent companies, and power purchase agreements with their buyers. EIA-860M lists Brazos Valley Energy as the operator, which is not always the owner.

Modeled data

Pro

Pro adds modeled values for this plant. Everything above stays free.

Modeled

Generation potential vs reported

Monthly potential at seasonal net capability, next to EIA-923 output. Shows how much of the plant's capability was used.

Analyst and MCP

300 analyst questions a month, plus MCP

Query Jack Fusco Energy Center and 14,224 other projects from Claude or your own tools. Free accounts get 1 question a day.

Power plants near Jack Fusco

Questions about Jack Fusco

How much power does Jack Fusco Energy Center produce?

Jack Fusco Energy Center reported 3,645,651 MWh (3.65 TWh) of net generation in 2025, a 61.6% capacity factor on 675.6 MW of nameplate capacity. From January to July 2026 it reported 2.23 TWh, which is provisional.

Where is Jack Fusco Energy Center?

Jack Fusco Energy Center is in Fort Bend County, Texas, at 29.4731, −95.6244. It is in the Midcontinent Independent Transmission System Operator, Inc.. balancing area (MISO).

Who operates Jack Fusco Energy Center?

EIA-860M for August 2026 lists Brazos Valley Energy as the operator (EIA operator ID 2171). The operator is not always the owner.

When did Jack Fusco Energy Center start operating?

Its first generator began operating in May 2003, according to EIA-860M.

Sources

  • EIA-860 2025 (final) and EIA-860M August 2026: plant, generators, capacity, operator and location
  • EIA-923 monthly net generation, 2000 to July 2026 (2026 provisional)
  • EPA CAMPD annual emissions through the EPA–EIA crosswalk, 1995 to 2025
  • EIA-923 cooling water 2024 and the USGS surface water supply and use index, Water years 2010-2020 (Oct 2009 to Sep 2020), mean of monthly values
  • Plant names from OpenStreetMap, © OpenStreetMap contributors (ODbL)

Page updated 2026-10-04 from the InfraMap data build. Methodology · Data sources · EIA plant page