Jack Fusco Energy Center
Natural gas power plant in Fort Bend County, Texas. 675.6 MW of nameplate capacity across 3 generators, operated by Brazos Valley Energy.
Also known as Brazos Valley Generating Facility · EIA plant 55357
Analyst: free account, 1 question a day.
Key facts
- Capacity
- 675.6 MWNameplate
- Generators
- 3 operatingEIA-860M, August 2026
- Operating since
- May 2003First generator online
- Operator
- Brazos Valley EnergyEIA operator ID 2171
- Grid
- MISOBalancing authority MISO
- Price nodes
- None linkedNo verified ISO node
- Location
- Fort Bend County, TX29.4731, −95.6244
- EIA plant ID
- 55357EIA plant page
Data as of EIA-860M August 2026 (published 2026-09-24). Capacity is nameplate, not live output.
How much power Jack Fusco produces
Free · EIA-923Net generation, 2025
3.65 TWh
3,645,651 MWh, final
Capacity factor, 2025
61.6%
2024: 57.3%
January to July 2026
2.23 TWh
Provisional
Range, 2015 to 2025
2.3–3.6
TWh a year. Low 2017, high 2025
| Year | Net generation, MWh | Capacity factor | Months reported |
|---|---|---|---|
| 2000 | Not reported | Not reported | 0 of 12 |
| 2001 | Not reported | Not reported | 0 of 12 |
| 2002 | Not reported | Not reported | 0 of 12 |
| 2003 | 1,796,650 | Not reported | 12 of 12 |
| 2004 | 2,821,716 | Not reported | 12 of 12 |
| 2005 | 3,279,060 | Not reported | 12 of 12 |
| 2006 | 1,981,846 | Not reported | 12 of 12 |
| 2007 | 2,733,434 | Not reported | 12 of 12 |
| 2008 | 2,857,286 | Not reported | 12 of 12 |
| 2009 | 2,351,660 | Not reported | 12 of 12 |
| 2010 | 2,435,124 | 41.1% | 12 of 12 |
| 2011 | 2,341,278 | 39.6% | 12 of 12 |
| 2012 | 3,384,915 | 57.0% | 12 of 12 |
| 2013 | 2,651,756 | Not reported | 12 of 12 |
| 2014 | 2,417,799 | 40.9% | 12 of 12 |
| 2015 | 3,395,454 | 57.4% | 12 of 12 |
| 2016 | 2,858,742 | 48.2% | 12 of 12 |
| 2017 | 2,321,274 | 39.2% | 12 of 12 |
| 2018 | 2,672,723 | 49.4% | 11 of 12 |
| 2019 | 2,341,414 | 39.6% | 12 of 12 |
| 2020 | 3,430,938 | 57.8% | 12 of 12 |
| 2021 | 2,753,592 | 46.5% | 12 of 12 |
| 2022 | 3,392,955 | 57.3% | 12 of 12 |
| 2023 | 3,305,314 | 55.8% | 12 of 12 |
| 2024 | 3,398,399 | 57.3% | 12 of 12 |
| 2025 | 3,645,651 | 61.6% | 12 of 12 |
| 2026 (provisional, partial year) | 2,232,234 | 64.9% | 7 of 7 |
* 2026 covers January to July and is provisional. Capacity factor is net generation divided by nameplate capacity times the hours of each reported month.
Power prices and basis
Free accountNo verified ISO price node is linked to this plant, or its price history could not load.
Emissions
Free · EPA CAMPDCO₂, 2025
1.56M
US short tons. 2024: 1.48M
SO₂, 2025
8
US short tons
NOx, 2025
155
US short tons
CO₂ per MWh, calculated
0.43 t
About 855 lb per MWh
2 of 2 EPA units reported CO₂ in 2025 (CTG1, CTG2), matched to EIA plant 55357 through the EPA–EIA crosswalk. The per-MWh rate is EPA CO₂ divided by EIA-923 net generation. The two reporting boundaries can differ.
Water use
Free · EIA-923 cooling, USGSWithdrawal, 2024
1,036
million gallons
Consumption, 2024
880
million gallons
Source
Brazos River
Surface, Fresh. Induced-draft tower
Watershed stress
Moderate · 0.494
USGS SUI, HUC12 Dry Bayou-Brazos River
12 of 12 cooling months report withdrawal. SUI of the source river HUC12 within 3 km. Blank volumes are unreported, not zero.
Generators
Free · EIA-860M| Generator | Technology | Nameplate MW | Online since |
|---|---|---|---|
| CTG1 | Natural Gas Fired Combined Cycle | 200.0 | May 2003 |
| CTG2 | Natural Gas Fired Combined Cycle | 200.0 | May 2003 |
| STG1 | Natural Gas Fired Combined Cycle | 275.6 | May 2003 |
Ownership and offtake
ProOwnership and offtake are part of Pro
Owners and their shares, parent companies, and power purchase agreements with their buyers. EIA-860M lists Brazos Valley Energy as the operator, which is not always the owner.
Modeled data
ProPro adds modeled values for this plant. Everything above stays free.
Generation potential vs reported
Monthly potential at seasonal net capability, next to EIA-923 output. Shows how much of the plant's capability was used.
300 analyst questions a month, plus MCP
Query Jack Fusco Energy Center and 14,224 other projects from Claude or your own tools. Free accounts get 1 question a day.
Power plants near Jack Fusco
Questions about Jack Fusco
How much power does Jack Fusco Energy Center produce?
Jack Fusco Energy Center reported 3,645,651 MWh (3.65 TWh) of net generation in 2025, a 61.6% capacity factor on 675.6 MW of nameplate capacity. From January to July 2026 it reported 2.23 TWh, which is provisional.
Where is Jack Fusco Energy Center?
Jack Fusco Energy Center is in Fort Bend County, Texas, at 29.4731, −95.6244. It is in the Midcontinent Independent Transmission System Operator, Inc.. balancing area (MISO).
Who operates Jack Fusco Energy Center?
EIA-860M for August 2026 lists Brazos Valley Energy as the operator (EIA operator ID 2171). The operator is not always the owner.
When did Jack Fusco Energy Center start operating?
Its first generator began operating in May 2003, according to EIA-860M.
Sources
- EIA-860 2025 (final) and EIA-860M August 2026: plant, generators, capacity, operator and location
- EIA-923 monthly net generation, 2000 to July 2026 (2026 provisional)
- EPA CAMPD annual emissions through the EPA–EIA crosswalk, 1995 to 2025
- EIA-923 cooling water 2024 and the USGS surface water supply and use index, Water years 2010-2020 (Oct 2009 to Sep 2020), mean of monthly values
- Plant names from OpenStreetMap, © OpenStreetMap contributors (ODbL)
Page updated 2026-10-04 from the InfraMap data build. Methodology · Data sources · EIA plant page