BiomassOperatingMISO

MMSD South Shore Wastewater

Biomass power plant in Milwaukee County, Wisconsin. 5.1 MW of nameplate capacity across 5 generators, operated by Milwaukee Metro Sewerage Dist.

Also known as EIA plant 55525

Analyst: free account, 1 question a day.

Elm Road Generating StationSouth Oak CreekCity of Milwaukee LandfillATIIKEA Oak Creek Rooftop PV SystemMMSD South Shore Wastewater5 km
Open in the map
5 plants within 7.8 km, from EIA coordinates.

Key facts

Capacity
5.1 MWNameplate
Generators
5 operatingEIA-860M, August 2026
Operating since
August 2000First generator online
Operator
Milwaukee Metro Sewerage DistEIA operator ID 12619
Grid
MISOBalancing authority MISO
Price nodes
None linkedNo verified ISO node
Location
Milwaukee County, WI42.8869, −87.8422
EIA plant ID
55525EIA plant page

Data as of EIA-860M August 2026 (published 2026-09-24). Capacity is nameplate, not live output.

How much power MMSD South Shore Wastewater produces

Free · EIA-923

Net generation, 2025

23.0 GWh

23,046 MWh, final

Capacity factor, 2025

51.6%

2024: 58.8%

January to July 2026

Not reported

Provisional. 0 of 7 months reported

Range, 2015 to 2025

17.7–33.9

GWh a year. Low 2015, high 2021

Annual net generation, GWhCapacity factor below each year
Annual net generation from EIA-923
YearNet generation, MWhCapacity factorMonths reported
2000Not reportedNot reported0 of 12
20013,626Not reported12 of 12
20025,479Not reported12 of 12
20032,524Not reported12 of 12
20043,303Not reported12 of 12
20054,242Not reported12 of 12
20061,680Not reported12 of 12
20073,159Not reported12 of 12
2008146Not reported12 of 12
20097,391Not reported12 of 12
201012,664Not reported12 of 12
20116,50714.6%12 of 12
201213,33829.8%12 of 12
201313,63230.5%12 of 12
201414,82033.2%12 of 12
201517,74539.7%12 of 12
201629,84866.6%12 of 12
201730,04867.3%12 of 12
201830,08367.3%12 of 12
201924,51154.9%12 of 12
202024,82755.4%12 of 12
202133,91175.9%12 of 12
202231,05769.5%12 of 12
202330,18167.6%12 of 12
202426,34558.8%12 of 12
202523,04651.6%12 of 12
2026 (provisional, partial year)Not reportedNot reported0 of 7

* 2026 covers January to July and is provisional. Capacity factor is net generation divided by nameplate capacity times the hours of each reported month.

Power prices and basis

Free account

No verified ISO price node is linked to this plant, or its price history could not load.

Emissions

Free · EPA CAMPD

No EPA emissions units are linked to this plant.

Water use

Free · EIA-923 cooling, USGS

No EIA cooling-water record for this plant in 2024.

Generators

Free · EIA-860M
GeneratorTechnologyNameplate MWOnline since
1Other Waste Biomass1.5August 2000
1CATOther Waste Biomass0.9February 2009
2CATOther Waste Biomass0.9January 2010
3CATOther Waste Biomass0.9January 2009
4CATOther Waste Biomass0.9January 2009

Ownership and offtake

Pro
Pro

Ownership and offtake are part of Pro

Owners and their shares, parent companies, and power purchase agreements with their buyers. EIA-860M lists Milwaukee Metro Sewerage Dist as the operator, which is not always the owner.

Modeled data

Pro

Pro adds modeled values for this plant. Everything above stays free.

Modeled

Generation potential vs reported

Monthly potential at seasonal net capability, next to EIA-923 output. Shows how much of the plant's capability was used.

Analyst and MCP

300 analyst questions a month, plus MCP

Query MMSD South Shore Wastewater and 14,224 other projects from Claude or your own tools. Free accounts get 1 question a day.

Power plants near MMSD South Shore Wastewater

More plants operated by Milwaukee Metro Sewerage Dist

Questions about MMSD South Shore Wastewater

How much power does MMSD South Shore Wastewater produce?

MMSD South Shore Wastewater reported 23,046 MWh (23.0 GWh) of net generation in 2025, a 51.6% capacity factor on 5.1 MW of nameplate capacity.

Where is MMSD South Shore Wastewater?

MMSD South Shore Wastewater is in Milwaukee County, Wisconsin, at 42.8869, −87.8422. It is in the Midcontinent Independent Transmission System Operator, Inc.. balancing area (MISO).

Who operates MMSD South Shore Wastewater?

EIA-860M for August 2026 lists Milwaukee Metro Sewerage Dist as the operator (EIA operator ID 12619). The operator is not always the owner.

When did MMSD South Shore Wastewater start operating?

Its first generator began operating in August 2000, according to EIA-860M.

Sources

  • EIA-860 2025 (final) and EIA-860M August 2026: plant, generators, capacity, operator and location
  • EIA-923 monthly net generation, 2000 to July 2026 (2026 provisional)

Page updated 2026-10-04 from the InfraMap data build. Methodology · Data sources · EIA plant page