Natural gasOperatingERCOT

Hidalgo Energy Center

Natural gas power plant in Hidalgo County, Texas. 551.3 MW of nameplate capacity across 3 generators, operated by Calpine Corp - Hidalgo.

Also known as EIA plant 55545

Analyst: free account, 1 question a day.

Magic Valley Generati…SE Edinburg BESSWAL3886Carambola BESSRed Gate Power PlantWAL452Hidalgo5 km
Open in the map
6 plants within 13 km, from EIA coordinates.

Key facts

Capacity
551.3 MWNameplate
Generators
3 operatingEIA-860M, August 2026
Operating since
June 2000First generator online
Operator
Calpine Corp - HidalgoEIA operator ID 2934
Grid
ERCOTBalancing authority ERCO
Price nodes
None linkedNo verified ISO node
Location
Hidalgo County, TX26.3417, −98.1758
EIA plant ID
55545EIA plant page

Data as of EIA-860M August 2026 (published 2026-09-24). Capacity is nameplate, not live output.

How much power Hidalgo produces

Free · EIA-923

Net generation, 2025

2.72 TWh

2,721,492 MWh, final

Capacity factor, 2025

56.4%

2024: 42.5%

January to July 2026

1.55 TWh

Provisional

Range, 2015 to 2025

2.0–2.8

TWh a year. Low 2018, high 2015

Annual net generation, TWhCapacity factor below each year
Annual net generation from EIA-923
YearNet generation, MWhCapacity factorMonths reported
2000Not reportedNot reported0 of 12
20012,575,485Not reported12 of 12
20021,907,012Not reported12 of 12
20031,608,082Not reported12 of 12
20041,867,556Not reported12 of 12
20051,745,407Not reported12 of 12
20061,878,610Not reported12 of 12
20071,842,038Not reported12 of 12
20082,437,665Not reported12 of 12
20091,989,188Not reported12 of 12
20101,908,16139.5%12 of 12
20111,288,83153.8%6 of 12
20122,520,76862.5%10 of 12
20132,183,006Not reported12 of 12
2014318,62320.1%4 of 12
20152,820,33658.4%12 of 12
20162,761,16657.0%12 of 12
20172,344,83048.6%12 of 12
20181,968,95340.8%12 of 12
20192,722,15356.4%12 of 12
20202,529,35152.2%12 of 12
20212,455,91850.9%12 of 12
20222,535,271Not reported12 of 12
20232,791,281Not reported12 of 12
20242,056,20642.5%12 of 12
20252,721,49256.4%12 of 12
2026 (provisional, partial year)1,545,81855.1%7 of 7

* 2026 covers January to July and is provisional. Capacity factor is net generation divided by nameplate capacity times the hours of each reported month.

Power prices and basis

Free account

No verified ISO price node is linked to this plant, or its price history could not load.

Emissions

Free · EPA CAMPD

CO₂, 2025

1.13M

US short tons. 2024: 850,712

SO₂, 2025

6

US short tons

NOx, 2025

349

US short tons

CO₂ per MWh, calculated

0.41 t

About 829 lb per MWh

2 of 2 EPA units reported CO₂ in 2025 (HRSG1, HRSG2), matched to EIA plant 55545 through the EPA–EIA crosswalk. The per-MWh rate is EPA CO₂ divided by EIA-923 net generation. The two reporting boundaries can differ.

Water use

Free · EIA-923 cooling, USGS

Withdrawal, 2024

581

million gallons

Consumption, 2024

373

million gallons

Source

City of McAllen Waste Water Center

Discharge, Reclaimed. Induced-draft tower

Watershed stress

Severe · 0.888

USGS SUI, HUC12 Lake Edinburg-Edinburg North Main Canal

12 of 12 cooling months report withdrawal. Reclaimed water or plant effluent; not tested. Blank volumes are unreported, not zero.

Generators

Free · EIA-860M
GeneratorTechnologyNameplate MWOnline since
CTG1Natural Gas Fired Combined Cycle176.6June 2000
CTG2Natural Gas Fired Combined Cycle176.6June 2000
STG1Natural Gas Fired Combined Cycle198.1June 2000

Ownership and offtake

Pro
Pro

Ownership and offtake are part of Pro

Owners and their shares, parent companies, and power purchase agreements with their buyers. EIA-860M lists Calpine Corp - Hidalgo as the operator, which is not always the owner.

Modeled data

Pro

Pro adds modeled values for this plant. Everything above stays free.

Modeled

Generation potential vs reported

Monthly potential at seasonal net capability, next to EIA-923 output. Shows how much of the plant's capability was used.

Analyst and MCP

300 analyst questions a month, plus MCP

Query Hidalgo Energy Center and 14,224 other projects from Claude or your own tools. Free accounts get 1 question a day.

Power plants near Hidalgo

Questions about Hidalgo

How much power does Hidalgo Energy Center produce?

Hidalgo Energy Center reported 2,721,492 MWh (2.72 TWh) of net generation in 2025, a 56.4% capacity factor on 551.3 MW of nameplate capacity. From January to July 2026 it reported 1.55 TWh, which is provisional.

Where is Hidalgo Energy Center?

Hidalgo Energy Center is in Hidalgo County, Texas, at 26.3417, −98.1758. It is in the Electric Reliability Council of Texas, Inc. balancing area (ERCO).

Who operates Hidalgo Energy Center?

EIA-860M for August 2026 lists Calpine Corp - Hidalgo as the operator (EIA operator ID 2934). The operator is not always the owner.

When did Hidalgo Energy Center start operating?

Its first generator began operating in June 2000, according to EIA-860M.

Sources

  • EIA-860 2025 (final) and EIA-860M August 2026: plant, generators, capacity, operator and location
  • EIA-923 monthly net generation, 2000 to July 2026 (2026 provisional)
  • EPA CAMPD annual emissions through the EPA–EIA crosswalk, 1995 to 2025
  • EIA-923 cooling water 2024 and the USGS surface water supply and use index, Water years 2010-2020 (Oct 2009 to Sep 2020), mean of monthly values

Page updated 2026-10-04 from the InfraMap data build. Methodology · Data sources · EIA plant page