WindOperatingSPP

Gray County Wind Energy

Wind power plant in Gray County, Kansas. 112.2 MW of nameplate capacity across 1 generator, operated by Gray County Wind Energy LLC.

Also known as Gray County Wind Farm · Gray County Wind Farm Montezuma) · EIA plant 55734

Analyst: free account, 1 question a day.

Ensign Wind LLCCimarron Wind Energy LLCCimarron Windpower IIBoot Hill SolarMeadeGray County Wind Energy20 km
Open in the map
6 plants within 37 km, from EIA coordinates.

Key facts

Capacity
112.2 MWNameplate
Generators
1 operatingEIA-860M, August 2026
Operating since
November 2001First generator online
Operator
Gray County Wind Energy LLCEIA operator ID 7531
Grid
SPPBalancing authority SWPP
Price nodes
1 SPP nodeResource nodes with prices
Location
Gray County, KS37.6133, −100.3782
EIA plant ID
55734EIA plant page

Data as of EIA-860M August 2026 (published 2026-09-24). Capacity is nameplate, not live output.

How much power Gray County Wind Energy produces

Free · EIA-923

Net generation, 2025

237 GWh

237,306 MWh, final

Capacity factor, 2025

24.1%

2024: 26.8%

January to July 2026

Not reported

Provisional. 0 of 7 months reported

Range, 2015 to 2025

175.5–346.9

GWh a year. Low 2017, high 2022

Annual net generation, GWhCapacity factor below each year
Annual net generation from EIA-923
YearNet generation, MWhCapacity factorMonths reported
2000Not reportedNot reported0 of 12
200139,832Not reported1 of 12
2002405,932Not reported12 of 12
2003364,288Not reported12 of 12
2004355,797Not reported12 of 12
2005349,976Not reported12 of 12
2006359,165Not reported12 of 12
2007351,640Not reported12 of 12
2008400,330Not reported12 of 12
2009352,955Not reported12 of 12
2010363,86037.1%12 of 12
2011357,41136.4%12 of 12
2012289,55129.4%12 of 12
201370,4607.2%12 of 12
2014138,71414.1%12 of 12
2015293,52629.9%12 of 12
2016240,65324.5%12 of 12
2017175,52117.9%12 of 12
2018254,99526.0%12 of 12
2019206,41521.0%12 of 12
2020210,879Not reported12 of 12
2021328,93033.5%12 of 12
2022346,92235.3%12 of 12
2023304,29831.0%12 of 12
2024264,09526.8%12 of 12
2025237,30624.1%12 of 12
2026 (provisional, partial year)Not reportedNot reported0 of 7

* 2026 covers January to July and is provisional. Capacity factor is net generation divided by nameplate capacity times the hours of each reported month.

Power prices and basis

Free account · SPP

Emissions

Free · EPA CAMPD

No EPA emissions units are linked to this plant.

Water use

Free · EIA-923 cooling, USGS

No EIA cooling-water record for this plant in 2024. Plants without steam cooling, such as wind, solar and batteries, do not report cooling water.

Generators

Free · EIA-860M
GeneratorTechnologyNameplate MWOnline since
V47Onshore Wind Turbine112.2November 2001

Ownership and offtake

Pro
Pro

Ownership and offtake are part of Pro

Owners and their shares, parent companies, and power purchase agreements with their buyers. EIA-860M lists Gray County Wind Energy LLC as the operator, which is not always the owner.

Modeled data

Pro

Pro adds modeled values for this plant. Everything above stays free.

Modeled

Modeled curtailment

A range, not one number. The lower bound counts hours inside the production tax credit window; the upper bound is the no-credit case.

Modeled

Expected vs reported generation

Monthly modeled expected output and physical potential next to EIA-923 reported output.

Analyst and MCP

300 analyst questions a month, plus MCP

Query Gray County Wind Energy and 14,224 other projects from Claude or your own tools. Free accounts get 1 question a day.

Power plants near Gray County Wind Energy

Questions about Gray County Wind Energy

How much power does Gray County Wind Energy produce?

Gray County Wind Energy reported 237,306 MWh (237 GWh) of net generation in 2025, a 24.1% capacity factor on 112.2 MW of nameplate capacity.

Where is Gray County Wind Energy?

Gray County Wind Energy is in Gray County, Kansas, at 37.6133, −100.3782. It is in the Southwest Power Pool balancing area (SWPP).

Who operates Gray County Wind Energy?

EIA-860M for August 2026 lists Gray County Wind Energy LLC as the operator (EIA operator ID 7531). The operator is not always the owner.

When did Gray County Wind Energy start operating?

Its first generator began operating in November 2001, according to EIA-860M.

Does InfraMap have power prices for Gray County Wind Energy?

Yes. InfraMap has SPP day-ahead and real-time prices at 1 price node linked to Gray County Wind Energy, with the hub price and node-to-hub basis. Prices are free with an InfraMap account; pricing node names are part of InfraMap Pro.

Sources

  • EIA-860 2025 (final) and EIA-860M August 2026: plant, generators, capacity, operator and location
  • EIA-923 monthly net generation, 2000 to July 2026 (2026 provisional)
  • SPP day-ahead and real-time prices; node and hub assignments as of 2026-10-05
  • Plant names from OpenStreetMap, © OpenStreetMap contributors (ODbL)
  • Project names from the USGS U.S. Wind Turbine Database

Page updated 2026-10-04 from the InfraMap data build. Methodology · Data sources · EIA plant page