Natural gasOperatingISO-NE

CPV Towantic Energy Center

Natural gas power plant in New Haven County, Connecticut. 841.5 MW of nameplate capacity across 3 generators, operated by CPV Towantic, LLC.

Also known as EIA plant 56047

Analyst: free account, 1 question a day.

Waterbury GenerationBrass Mill CenterStevensonKinneytown New OldShepaugWatertown Solar One, LLCCPV Towantic5 km
Open in the map
6 plants within 16 km, from EIA coordinates.

Key facts

Capacity
841.5 MWNameplate
Generators
3 operatingEIA-860M, August 2026
Operating since
May 2018First generator online
Operator
CPV Towantic, LLCEIA operator ID 19002
Grid
ISO-NEBalancing authority ISNE
Price nodes
2 ISONE nodesResource nodes with prices
Location
New Haven County, CT41.4812, −73.1231
EIA plant ID
56047EIA plant page

Data as of EIA-860M August 2026 (published 2026-09-24). Capacity is nameplate, not live output.

How much power CPV Towantic produces

Free · EIA-923

Net generation, 2025

4.81 TWh

4,812,468 MWh, final

Capacity factor, 2025

65.3%

2024: 75.5%

January to July 2026

3.46 TWh

Provisional

Range, 2019 to 2025

3.9–5.6

TWh a year. Low 2019, high 2024

Annual net generation, TWhCapacity factor below each year
Annual net generation from EIA-923
YearNet generation, MWhCapacity factorMonths reported
2000Not reportedNot reported0 of 12
2001Not reportedNot reported0 of 12
2002Not reportedNot reported0 of 12
2003Not reportedNot reported0 of 12
2004Not reportedNot reported0 of 12
2005Not reportedNot reported0 of 12
2006Not reportedNot reported0 of 12
2007Not reportedNot reported0 of 12
2008Not reportedNot reported0 of 12
2009Not reportedNot reported0 of 12
2010Not reportedNot reported0 of 12
2011Not reportedNot reported0 of 12
2012Not reportedNot reported0 of 12
2013Not reportedNot reported0 of 12
2014Not reportedNot reported0 of 12
2015Not reportedNot reported0 of 12
2016Not reportedNot reported0 of 12
2017Not reportedNot reported0 of 12
20182,948,775Not reported8 of 12
20193,867,76852.5%12 of 12
20205,323,72772.0%12 of 12
20215,553,26575.3%12 of 12
20224,953,10167.2%12 of 12
20235,534,07275.1%12 of 12
20245,581,23775.5%12 of 12
20254,812,46865.3%12 of 12
2026 (provisional, partial year)3,460,50980.8%7 of 7

* 2026 covers January to July and is provisional. Capacity factor is net generation divided by nameplate capacity times the hours of each reported month.

Power prices and basis

Free account · ISONE

Emissions

Free · EPA CAMPD

CO₂, 2025

1.88M

US short tons. 2024: 2.15M

SO₂, 2025

10

US short tons

NOx, 2025

121

US short tons

CO₂ per MWh, calculated

0.39 t

About 780 lb per MWh

2 of 2 EPA units reported CO₂ in 2025 (1, 2), matched to EIA plant 56047 through the EPA–EIA crosswalk. The per-MWh rate is EPA CO₂ divided by EIA-923 net generation. The two reporting boundaries can differ.

Water use

Free · EIA-923 cooling, USGS

Withdrawal, 2024

Not reported

million gallons as reported; not used, see note

Consumption, 2024

Not reported

million gallons

Source

N/A

Dry cooling

Watershed stress

Very low/none · 0.192

USGS SUI, HUC12 Little River

0 of 12 cooling months report withdrawal. Dry cooling with no reported withdrawal; not tested. Consumption is below 5% of a large reported withdrawal, so the withdrawal is not used. Blank volumes are unreported, not zero.

Generators

Free · EIA-860M
GeneratorTechnologyNameplate MWOnline since
CTG1Natural Gas Fired Combined Cycle280.5May 2018
CTG2Natural Gas Fired Combined Cycle280.5May 2018
STGNatural Gas Fired Combined Cycle280.5May 2018

Ownership and offtake

Pro
Pro

Ownership and offtake are part of Pro

Owners and their shares, parent companies, and power purchase agreements with their buyers. EIA-860M lists CPV Towantic, LLC as the operator, which is not always the owner.

Modeled data

Pro

Pro adds modeled values for this plant. Everything above stays free.

Modeled

Generation potential vs reported

Monthly potential at seasonal net capability, next to EIA-923 output. Shows how much of the plant's capability was used.

Analyst and MCP

300 analyst questions a month, plus MCP

Query CPV Towantic Energy Center and 14,224 other projects from Claude or your own tools. Free accounts get 1 question a day.

Power plants near CPV Towantic

Questions about CPV Towantic

How much power does CPV Towantic Energy Center produce?

CPV Towantic Energy Center reported 4,812,468 MWh (4.81 TWh) of net generation in 2025, a 65.3% capacity factor on 841.5 MW of nameplate capacity. From January to July 2026 it reported 3.46 TWh, which is provisional.

Where is CPV Towantic Energy Center?

CPV Towantic Energy Center is in New Haven County, Connecticut, at 41.4812, −73.1231. It is in the ISO New England Inc. balancing area (ISNE).

Who operates CPV Towantic Energy Center?

EIA-860M for August 2026 lists CPV Towantic, LLC as the operator (EIA operator ID 19002). The operator is not always the owner.

When did CPV Towantic Energy Center start operating?

Its first generator began operating in May 2018, according to EIA-860M.

Does InfraMap have power prices for CPV Towantic Energy Center?

Yes. InfraMap has ISONE day-ahead and real-time prices at 2 price nodes linked to CPV Towantic Energy Center, with the hub price and node-to-hub basis. Prices are free with an InfraMap account; pricing node names are part of InfraMap Pro.

Sources

  • EIA-860 2025 (final) and EIA-860M August 2026: plant, generators, capacity, operator and location
  • EIA-923 monthly net generation, 2000 to July 2026 (2026 provisional)
  • EPA CAMPD annual emissions through the EPA–EIA crosswalk, 1995 to 2025
  • ISONE day-ahead and real-time prices; node and hub assignments as of 2026-10-05
  • EIA-923 cooling water 2024 and the USGS surface water supply and use index, Water years 2010-2020 (Oct 2009 to Sep 2020), mean of monthly values

Page updated 2026-10-04 from the InfraMap data build. Methodology · Data sources · EIA plant page