TS Power Plant

Coal and solar power plant in Eureka County, Nevada. 442 MW of nameplate capacity across 3 generators, operated by Nevada Gold Energy, LLC.

Also known as Newmont TS Solid-Fuel Power Plant · EIA plant 56224

Analyst: free account, 1 question a day.

BeowaweNorth ValmyTS25 km
Open in the map
3 plants within 54 km, from EIA coordinates.

Key facts

Capacity
442 MWCoal 242.0 · Solar 200.0
Generators
3 operatingEIA-860M, August 2026
Operating since
June 2008First generator online
Operator
Nevada Gold Energy, LLCEIA operator ID 49896
Grid
NEVPBalancing authority NEVP
Price nodes
None linkedNo verified ISO node
Location
Eureka County, NV40.7461, −116.5297
EIA plant ID
56224EIA plant page

Data as of EIA-860M August 2026 (published 2026-09-24). Capacity is nameplate, not live output.

How much power TS produces

Free · EIA-923

Net generation, 2025

1.72 TWh

1,717,988 MWh, final

Capacity factor, 2025

44.4%

2024: Not reported

January to July 2026

875 GWh

Provisional

Range, 2015 to 2025

0.9–1.7

TWh a year. Low 2015, high 2025

Annual net generation, TWhCapacity factor below each year
Annual net generation from EIA-923
YearNet generation, MWhCapacity factorMonths reported
2000Not reportedNot reported0 of 12
2001Not reportedNot reported0 of 12
2002Not reportedNot reported0 of 12
2003Not reportedNot reported0 of 12
2004Not reportedNot reported0 of 12
2005Not reportedNot reported0 of 12
2006Not reportedNot reported0 of 12
2007Not reportedNot reported0 of 12
2008931,882Not reported12 of 12
20091,169,957Not reported12 of 12
20101,416,40566.8%12 of 12
20111,319,107Not reported12 of 12
20121,120,719Not reported12 of 12
20131,395,06065.8%12 of 12
20141,424,28667.2%12 of 12
2015856,75640.4%12 of 12
2016890,72241.9%12 of 12
2017967,83145.7%12 of 12
20181,045,36749.3%12 of 12
20191,049,08149.5%12 of 12
20201,027,27148.3%12 of 12
20211,192,34156.2%12 of 12
202246,50225.8%1 of 12
20231,085,75351.2%12 of 12
20241,061,777Not reported9 of 12
20251,717,98844.4%12 of 12
2026 (provisional, partial year)875,22838.9%7 of 7

* 2026 covers January to July and is provisional. Capacity factor is net generation divided by nameplate capacity times the hours of each reported month.

Power prices and basis

Free account

No verified ISO price node is linked to this plant, or its price history could not load.

Emissions

Free · EPA CAMPD

CO₂, 2025

1.43M

US short tons. 2024: 1.29M

SO₂, 2025

179

US short tons

NOx, 2025

337

US short tons

CO₂ per MWh, calculated

0.83 t

About 1,667 lb per MWh

1 of 1 EPA units reported CO₂ in 2025 (1), matched to EIA plant 56224 through the EPA–EIA crosswalk. The per-MWh rate is EPA CO₂ divided by EIA-923 net generation. The two reporting boundaries can differ.

Water use

Free · EIA-923 cooling, USGS

Withdrawal, 2024

312

million gallons

Consumption, 2024

264

million gallons

Source

Wells

Ground, Fresh. Induced-draft tower

Watershed stress

Severe · 0.912

USGS SUI, HUC12 Mack Creek-Sheep Creek

12 of 12 cooling months report withdrawal. Groundwater user; SUI describes surface water and is context only. Blank volumes are unreported, not zero.

Generators

Free · EIA-860M
GeneratorTechnologyNameplate MWOnline since
001Conventional Steam Coal242.0June 2008
SOL1Solar Photovoltaic100.0April 2024
SOL2Solar Photovoltaic100.0September 2024

Ownership and offtake

Pro
Pro

Ownership and offtake are part of Pro

Owners and their shares, parent companies, and power purchase agreements with their buyers. EIA-860M lists Nevada Gold Energy, LLC as the operator, which is not always the owner.

Modeled data

Pro

Pro adds modeled values for this plant. Everything above stays free.

Modeled

Generation potential vs reported

Monthly potential at seasonal net capability, next to EIA-923 output. Shows how much of the plant's capability was used.

Analyst and MCP

300 analyst questions a month, plus MCP

Query TS Power Plant and 14,224 other projects from Claude or your own tools. Free accounts get 1 question a day.

Power plants near TS

Questions about TS

How much power does TS Power Plant produce?

TS Power Plant reported 1,717,988 MWh (1.72 TWh) of net generation in 2025, a 44.4% capacity factor on 442 MW of nameplate capacity. From January to July 2026 it reported 875 GWh, which is provisional.

Where is TS Power Plant?

TS Power Plant is in Eureka County, Nevada, at 40.7461, −116.5297. It is in the Nevada Power Company balancing area (NEVP).

Who operates TS Power Plant?

EIA-860M for August 2026 lists Nevada Gold Energy, LLC as the operator (EIA operator ID 49896). The operator is not always the owner.

Is TS Power Plant a coal or a solar plant?

Both. Coal capacity totals 242 MW and solar capacity totals 200 MW.

When did TS Power Plant start operating?

Its first generator began operating in June 2008, according to EIA-860M.

Sources

  • EIA-860 2025 (final) and EIA-860M August 2026: plant, generators, capacity, operator and location
  • EIA-923 monthly net generation, 2000 to July 2026 (2026 provisional)
  • EPA CAMPD annual emissions through the EPA–EIA crosswalk, 1995 to 2025
  • EIA-923 cooling water 2024 and the USGS surface water supply and use index, Water years 2010-2020 (Oct 2009 to Sep 2020), mean of monthly values
  • Plant names from OpenStreetMap, © OpenStreetMap contributors (ODbL)

Page updated 2026-10-04 from the InfraMap data build. Methodology · Data sources · EIA plant page