Natural gasOperatingFPL

West County Energy Center

Natural gas power plant in Palm Beach County, Florida. 4,263 MW of nameplate capacity across 12 generators, operated by Florida Power & Light Co.

Also known as EIA plant 56407

Analyst: free account, 1 question a day.

HolopawSilver PalmWest County10 km
Open in the map
6 plants within 25 km, from EIA coordinates.

Key facts

Capacity
4,263 MWNameplate
Generators
12 operatingEIA-860M, August 2026
Operating since
August 2009First generator online
Operator
Florida Power & Light CoEIA operator ID 6452
Grid
FPLBalancing authority FPL
Price nodes
None linkedNo verified ISO node
Location
Palm Beach County, FL26.6986, −80.3747
EIA plant ID
56407EIA plant page

Data as of EIA-860M August 2026 (published 2026-09-24). Capacity is nameplate, not live output.

How much power West County produces

Free · EIA-923

Net generation, 2025

18.7 TWh

18,660,467 MWh, final

Capacity factor, 2025

50.0%

2024: 52.9%

January to July 2026

9.95 TWh

Provisional

Range, 2015 to 2025

18.7–21.5

TWh a year. Low 2025, high 2019

Annual net generation, TWhCapacity factor below each year
Annual net generation from EIA-923
YearNet generation, MWhCapacity factorMonths reported
2000Not reportedNot reported0 of 12
2001Not reportedNot reported0 of 12
2002Not reportedNot reported0 of 12
2003Not reportedNot reported0 of 12
2004Not reportedNot reported0 of 12
2005Not reportedNot reported0 of 12
2006Not reportedNot reported0 of 12
2007Not reportedNot reported0 of 12
2008Not reportedNot reported0 of 12
20091,659,654Not reported2 of 12
2010873,84041.3%1 of 12
201121,398,148Not reported12 of 12
201224,355,99565.0%12 of 12
201321,658,201Not reported12 of 12
201419,764,92352.9%12 of 12
201520,428,36054.7%12 of 12
201620,297,46054.2%12 of 12
201720,515,37054.9%12 of 12
201819,840,914Not reported12 of 12
201921,486,002Not reported12 of 12
202019,764,524Not reported12 of 12
202120,327,004Not reported12 of 12
202219,536,26452.3%12 of 12
202319,965,74953.5%12 of 12
202419,815,23952.9%12 of 12
202518,660,46750.0%12 of 12
2026 (provisional, partial year)9,947,27145.9%7 of 7

* 2026 covers January to July and is provisional. Capacity factor is net generation divided by nameplate capacity times the hours of each reported month.

Power prices and basis

Free account

No verified ISO price node is linked to this plant, or its price history could not load.

Emissions

Free · EPA CAMPD

CO₂, 2025

7.84M

US short tons. 2024: 8.27M

SO₂, 2025

40

US short tons

NOx, 2025

547

US short tons

CO₂ per MWh, calculated

0.42 t

About 840 lb per MWh

9 of 9 EPA units reported CO₂ in 2025 (WCCT1A, WCCT1B, WCCT1C, WCCT2A, WCCT2B, WCCT2C, WCCT3A, WCCT3B, and others), matched to EIA plant 56407 through the EPA–EIA crosswalk. The per-MWh rate is EPA CO₂ divided by EIA-923 net generation. The two reporting boundaries can differ.

Water use

Free · EIA-923 cooling, USGS

Withdrawal, 2024

5,391

million gallons

Consumption, 2024

5,391

million gallons

Source

Village of Wellington, Wells

Discharge, Reclaimed. Induced-draft tower

Watershed stress

Moderate · 0.512

USGS SUI, HUC12 Upper West Palm Beach Canal

12 of 12 cooling months report withdrawal. Reclaimed water or plant effluent; not tested. Blank volumes are unreported, not zero.

Generators

Free · EIA-860M
GeneratorTechnologyNameplate MWOnline since
1ANatural Gas Fired Combined Cycle298.0August 2009
1BNatural Gas Fired Combined Cycle298.0August 2009
1CNatural Gas Fired Combined Cycle298.0August 2009
1STNatural Gas Fired Combined Cycle527.0August 2009
2ANatural Gas Fired Combined Cycle298.0November 2009
2BNatural Gas Fired Combined Cycle298.0November 2009
2CNatural Gas Fired Combined Cycle298.0November 2009
2STNatural Gas Fired Combined Cycle527.0November 2009
3ANatural Gas Fired Combined Cycle298.0May 2011
3BNatural Gas Fired Combined Cycle298.0May 2011
3CNatural Gas Fired Combined Cycle298.0May 2011
3STNatural Gas Fired Combined Cycle527.0May 2011

Ownership and offtake

Pro
Pro

Ownership and offtake are part of Pro

Owners and their shares, parent companies, and power purchase agreements with their buyers. EIA-860M lists Florida Power & Light Co as the operator, which is not always the owner.

Modeled data

Pro

Pro adds modeled values for this plant. Everything above stays free.

Modeled

Generation potential vs reported

Monthly potential at seasonal net capability, next to EIA-923 output. Shows how much of the plant's capability was used.

Analyst and MCP

300 analyst questions a month, plus MCP

Query West County Energy Center and 14,224 other projects from Claude or your own tools. Free accounts get 1 question a day.

Power plants near West County

More plants operated by Florida Power & Light Co

Questions about West County

How much power does West County Energy Center produce?

West County Energy Center reported 18,660,467 MWh (18.7 TWh) of net generation in 2025, a 50.0% capacity factor on 4,263 MW of nameplate capacity. From January to July 2026 it reported 9.95 TWh, which is provisional.

Where is West County Energy Center?

West County Energy Center is in Palm Beach County, Florida, at 26.6986, −80.3747. It is in the Florida Power & Light Company balancing area (FPL).

Who operates West County Energy Center?

EIA-860M for August 2026 lists Florida Power & Light Co as the operator (EIA operator ID 6452). The operator is not always the owner.

When did West County Energy Center start operating?

Its first generator began operating in August 2009, according to EIA-860M.

Sources

  • EIA-860 2025 (final) and EIA-860M August 2026: plant, generators, capacity, operator and location
  • EIA-923 monthly net generation, 2000 to July 2026 (2026 provisional)
  • EPA CAMPD annual emissions through the EPA–EIA crosswalk, 1995 to 2025
  • EIA-923 cooling water 2024 and the USGS surface water supply and use index, Water years 2010-2020 (Oct 2009 to Sep 2020), mean of monthly values

Page updated 2026-10-04 from the InfraMap data build. Methodology · Data sources · EIA plant page