Wildorado Wind LLC
Wind power plant in Oldham County, Texas. 161 MW of nameplate capacity across 1 generator, operated by Wildorado Wind, LLC.
Also known as Wildorado Wind 1 · Wildorado · EIA plant 56432
Analyst: free account, 1 question a day.
Key facts
- Capacity
- 161 MWNameplate
- Generators
- 1 operatingEIA-860M, August 2026
- Operating since
- April 2007First generator online
- Operator
- Wildorado Wind, LLCEIA operator ID 64668
- Grid
- SPPBalancing authority SWPP
- Price nodes
- 1 SPP nodeResource nodes with prices
- Location
- Oldham County, TX35.2919, −102.3031
- EIA plant ID
- 56432EIA plant page
Data as of EIA-860M August 2026 (published 2026-09-24). Capacity is nameplate, not live output.
How much power Wildorado Wind produces
Free · EIA-923Net generation, 2025
672 GWh
672,453 MWh, final
Capacity factor, 2025
47.7%
2024: 48.9%
January to July 2026
Not reported
Provisional. 0 of 7 months reported
Range, 2015 to 2025
441.2–692.1
GWh a year. Low 2019, high 2024
| Year | Net generation, MWh | Capacity factor | Months reported |
|---|---|---|---|
| 2000 | Not reported | Not reported | 0 of 12 |
| 2001 | Not reported | Not reported | 0 of 12 |
| 2002 | Not reported | Not reported | 0 of 12 |
| 2003 | Not reported | Not reported | 0 of 12 |
| 2004 | Not reported | Not reported | 0 of 12 |
| 2005 | Not reported | Not reported | 0 of 12 |
| 2006 | Not reported | Not reported | 0 of 12 |
| 2007 | 520,439 | Not reported | 12 of 12 |
| 2008 | 701,538 | Not reported | 12 of 12 |
| 2009 | 650,027 | Not reported | 12 of 12 |
| 2010 | 675,972 | 47.9% | 12 of 12 |
| 2011 | 644,250 | 45.7% | 12 of 12 |
| 2012 | 654,028 | 46.2% | 12 of 12 |
| 2013 | 658,661 | 46.7% | 12 of 12 |
| 2014 | 655,215 | 46.5% | 12 of 12 |
| 2015 | 590,376 | 41.9% | 12 of 12 |
| 2016 | 665,167 | 47.0% | 12 of 12 |
| 2017 | 637,821 | 45.2% | 12 of 12 |
| 2018 | 656,244 | 46.5% | 12 of 12 |
| 2019 | 441,215 | 31.3% | 12 of 12 |
| 2020 | 597,835 | 42.3% | 12 of 12 |
| 2021 | 686,543 | 48.7% | 12 of 12 |
| 2022 | 689,694 | 48.9% | 12 of 12 |
| 2023 | 643,228 | 45.6% | 12 of 12 |
| 2024 | 692,051 | 48.9% | 12 of 12 |
| 2025 | 672,453 | 47.7% | 12 of 12 |
| 2026 (provisional, partial year) | Not reported | Not reported | 0 of 7 |
* 2026 covers January to July and is provisional. Capacity factor is net generation divided by nameplate capacity times the hours of each reported month.
Power prices and basis
Free account · SPPEmissions
Free · EPA CAMPDNo EPA emissions units are linked to this plant.
Water use
Free · EIA-923 cooling, USGSNo EIA cooling-water record for this plant in 2024. Plants without steam cooling, such as wind, solar and batteries, do not report cooling water.
Generators
Free · EIA-860M| Generator | Technology | Nameplate MW | Online since |
|---|---|---|---|
| 1 | Onshore Wind Turbine | 161.0 | April 2007 |
Ownership and offtake
ProOwnership and offtake are part of Pro
Owners and their shares, parent companies, and power purchase agreements with their buyers. EIA-860M lists Wildorado Wind, LLC as the operator, which is not always the owner.
Modeled data
ProPro adds modeled values for this plant. Everything above stays free.
Modeled curtailment
A range, not one number. The lower bound counts hours inside the production tax credit window; the upper bound is the no-credit case.
Expected vs reported generation
Monthly modeled expected output and physical potential next to EIA-923 reported output.
300 analyst questions a month, plus MCP
Query Wildorado Wind LLC and 14,224 other projects from Claude or your own tools. Free accounts get 1 question a day.
Power plants near Wildorado Wind
Questions about Wildorado Wind
How much power does Wildorado Wind LLC produce?
Wildorado Wind LLC reported 672,453 MWh (672 GWh) of net generation in 2025, a 47.7% capacity factor on 161 MW of nameplate capacity.
Where is Wildorado Wind LLC?
Wildorado Wind LLC is in Oldham County, Texas, at 35.2919, −102.3031. It is in the Southwest Power Pool balancing area (SWPP).
Who operates Wildorado Wind LLC?
EIA-860M for August 2026 lists Wildorado Wind, LLC as the operator (EIA operator ID 64668). The operator is not always the owner.
When did Wildorado Wind LLC start operating?
Its first generator began operating in April 2007, according to EIA-860M.
Does InfraMap have power prices for Wildorado Wind LLC?
Yes. InfraMap has SPP day-ahead and real-time prices at 1 price node linked to Wildorado Wind LLC, with the hub price and node-to-hub basis. Prices are free with an InfraMap account; pricing node names are part of InfraMap Pro.
Sources
- EIA-860 2025 (final) and EIA-860M August 2026: plant, generators, capacity, operator and location
- EIA-923 monthly net generation, 2000 to July 2026 (2026 provisional)
- SPP day-ahead and real-time prices; node and hub assignments as of 2026-10-05
- Plant names from OpenStreetMap, © OpenStreetMap contributors (ODbL)
- Project names from the USGS U.S. Wind Turbine Database
Page updated 2026-10-04 from the InfraMap data build. Methodology · Data sources · EIA plant page