CoalOperatingWACM

Wygen III

Coal power plant in Campbell County, Wyoming. 116 MW of nameplate capacity across 1 generator, operated by Black Hills Power, Inc..

Also known as EIA plant 56596

Analyst: free account, 1 question a day.

Wygen 2WyodakWygen 1Neil Simpson IINeil Simpson Gas Turbine #2Wygen III500 m
Open in the map
5 plants within 784 m, from EIA coordinates.

Key facts

Capacity
116 MWNameplate
Generators
1 operatingEIA-860M, August 2026
Operating since
April 2010First generator online
Operator
Black Hills Power, Inc.EIA operator ID 19545
Grid
WACMBalancing authority WACM
Price nodes
None linkedNo verified ISO node
Location
Campbell County, WY44.2919, −105.3806
EIA plant ID
56596EIA plant page

Data as of EIA-860M August 2026 (published 2026-09-24). Capacity is nameplate, not live output.

How much power Wygen III produces

Free · EIA-923

Net generation, 2025

95.0 GWh

95,020 MWh, final

Capacity factor, 2025

9.4%

2024: 65.8%

January to July 2026

Not reported

Provisional. 0 of 7 months reported

Range, 2015 to 2025

95.0–852.0

GWh a year. Low 2025, high 2018

Annual net generation, GWhCapacity factor below each year
Annual net generation from EIA-923
YearNet generation, MWhCapacity factorMonths reported
2000Not reportedNot reported0 of 12
2001Not reportedNot reported0 of 12
2002Not reportedNot reported0 of 12
2003Not reportedNot reported0 of 12
2004Not reportedNot reported0 of 12
2005Not reportedNot reported0 of 12
2006Not reportedNot reported0 of 12
2007Not reportedNot reported0 of 12
2008Not reportedNot reported0 of 12
2009Not reportedNot reported0 of 12
2010598,363Not reported12 of 12
2011821,46580.7%12 of 12
2012855,13183.8%12 of 12
2013837,89382.3%12 of 12
2014838,97782.4%12 of 12
2015773,802Not reported12 of 12
2016821,69980.6%12 of 12
2017772,44476.0%12 of 12
2018852,01583.8%12 of 12
2019762,33475.0%12 of 12
2020843,01382.7%12 of 12
2021831,90381.9%12 of 12
2022805,20879.2%12 of 12
2023794,70878.2%12 of 12
2024670,65065.8%12 of 12
202595,0209.4%12 of 12
2026 (provisional, partial year)Not reportedNot reported0 of 7

* 2026 covers January to July and is provisional. Capacity factor is net generation divided by nameplate capacity times the hours of each reported month.

Power prices and basis

Free account

No verified ISO price node is linked to this plant, or its price history could not load.

Emissions

Free · EPA CAMPD

CO₂, 2025

125,873

US short tons. 2024: 822,209

SO₂, 2025

43

US short tons

NOx, 2025

27

US short tons

CO₂ per MWh, calculated

1.32 t

About 2,649 lb per MWh

1 of 1 EPA units reported CO₂ in 2025 (1), matched to EIA plant 56596 through the EPA–EIA crosswalk. The per-MWh rate is EPA CO₂ divided by EIA-923 net generation. The two reporting boundaries can differ.

Water use

Free · EIA-923 cooling, USGS

Withdrawal, 2024

Not reported

million gallons as reported; not used, see note

Consumption, 2024

Not reported

million gallons

Source

Not reported

Dry cooling

Watershed stress

Very low/none · 0.136

USGS SUI, HUC12 Upper Donkey Creek

0 of 12 cooling months report withdrawal. Dry cooling with no reported withdrawal; not tested. Consumption is below 5% of a large reported withdrawal, so the withdrawal is not used. Blank volumes are unreported, not zero.

Generators

Free · EIA-860M
GeneratorTechnologyNameplate MWOnline since
5Conventional Steam Coal116.0April 2010

Ownership and offtake

Pro
Pro

Ownership and offtake are part of Pro

Owners and their shares, parent companies, and power purchase agreements with their buyers. EIA-860M lists Black Hills Power, Inc. as the operator, which is not always the owner.

Modeled data

Pro

Pro adds modeled values for this plant. Everything above stays free.

Modeled

Generation potential vs reported

Monthly potential at seasonal net capability, next to EIA-923 output. Shows how much of the plant's capability was used.

Analyst and MCP

300 analyst questions a month, plus MCP

Query Wygen III and 14,224 other projects from Claude or your own tools. Free accounts get 1 question a day.

Power plants near Wygen III

More plants operated by Black Hills Power, Inc.

Questions about Wygen III

How much power does Wygen III produce?

Wygen III reported 95,020 MWh (95.0 GWh) of net generation in 2025, a 9.4% capacity factor on 116 MW of nameplate capacity.

Where is Wygen III?

Wygen III is in Campbell County, Wyoming, at 44.2919, −105.3806. It is in the Western Area Power Administration - Rocky Mountain Region balancing area (WACM).

Who operates Wygen III?

EIA-860M for August 2026 lists Black Hills Power, Inc. as the operator (EIA operator ID 19545). The operator is not always the owner.

When did Wygen III start operating?

Its first generator began operating in April 2010, according to EIA-860M.

Sources

  • EIA-860 2025 (final) and EIA-860M August 2026: plant, generators, capacity, operator and location
  • EIA-923 monthly net generation, 2000 to July 2026 (2026 provisional)
  • EPA CAMPD annual emissions through the EPA–EIA crosswalk, 1995 to 2025
  • EIA-923 cooling water 2024 and the USGS surface water supply and use index, Water years 2010-2020 (Oct 2009 to Sep 2020), mean of monthly values

Page updated 2026-10-04 from the InfraMap data build. Methodology · Data sources · EIA plant page