Key facts

Capacity
213.8 MWNameplate
Generators
1 operatingEIA-860M, August 2026
Operating since
December 2007First generator online
Operator
Old Trail Wind Farm LLCEIA operator ID 55866
Grid
PJMBalancing authority PJM
Price nodes
1 PJM nodeResource nodes with prices
Location
McLean County, IL40.4792, −88.7989
EIA plant ID
56614EIA plant page

Data as of EIA-860M August 2026 (published 2026-09-24). Capacity is nameplate, not live output.

How much power Old Trail Wind Farm produces

Free · EIA-923

Net generation, 2025

556 GWh

556,306 MWh, final

Capacity factor, 2025

29.7%

2024: 30.1%

January to July 2026

363 GWh

Provisional

Range, 2015 to 2025

520.2–616.6

GWh a year. Low 2023, high 2017

Annual net generation, GWhCapacity factor below each year
Annual net generation from EIA-923
YearNet generation, MWhCapacity factorMonths reported
2000Not reportedNot reported0 of 12
2001Not reportedNot reported0 of 12
2002Not reportedNot reported0 of 12
2003Not reportedNot reported0 of 12
2004Not reportedNot reported0 of 12
2005Not reportedNot reported0 of 12
2006Not reportedNot reported0 of 12
2007Not reportedNot reported0 of 12
2008579,235Not reported12 of 12
2009579,853Not reported12 of 12
2010565,16832.6%12 of 12
2011598,43334.5%12 of 12
2012604,89634.8%12 of 12
2013588,59233.9%12 of 12
2014585,86433.8%12 of 12
2015604,31034.8%12 of 12
2016565,51332.5%12 of 12
2017616,62535.6%12 of 12
2018553,13831.9%12 of 12
2019580,74733.5%12 of 12
2020542,03231.2%12 of 12
2021559,823Not reported12 of 12
2022612,23532.7%12 of 12
2023520,23527.8%12 of 12
2024566,05530.1%12 of 12
2025556,30629.7%12 of 12
2026 (provisional, partial year)363,36833.4%7 of 7

* 2026 covers January to July and is provisional. Capacity factor is net generation divided by nameplate capacity times the hours of each reported month.

Power prices and basis

Free account · PJM

Emissions

Free · EPA CAMPD

No EPA emissions units are linked to this plant.

Water use

Free · EIA-923 cooling, USGS

No EIA cooling-water record for this plant in 2024. Plants without steam cooling, such as wind, solar and batteries, do not report cooling water.

Generators

Free · EIA-860M
GeneratorTechnologyNameplate MWOnline since
2Onshore Wind Turbine213.8December 2007

Ownership and offtake

Pro
Pro

Ownership and offtake are part of Pro

Owners and their shares, parent companies, and power purchase agreements with their buyers. EIA-860M lists Old Trail Wind Farm LLC as the operator, which is not always the owner.

Modeled data

Pro

Pro adds modeled values for this plant. Everything above stays free.

Modeled

Modeled curtailment

A range, not one number. The lower bound counts hours inside the production tax credit window; the upper bound is the no-credit case.

Modeled

Expected vs reported generation

Monthly modeled expected output and physical potential next to EIA-923 reported output.

Analyst and MCP

300 analyst questions a month, plus MCP

Query Old Trail Wind Farm and 14,224 other projects from Claude or your own tools. Free accounts get 1 question a day.

Power plants near Old Trail Wind Farm

Questions about Old Trail Wind Farm

How much power does Old Trail Wind Farm produce?

Old Trail Wind Farm reported 556,306 MWh (556 GWh) of net generation in 2025, a 29.7% capacity factor on 213.8 MW of nameplate capacity. From January to July 2026 it reported 363 GWh, which is provisional.

Where is Old Trail Wind Farm?

Old Trail Wind Farm is in McLean County, Illinois, at 40.4792, −88.7989. It is in the PJM Interconnection, LLC balancing area (PJM).

Who operates Old Trail Wind Farm?

EIA-860M for August 2026 lists Old Trail Wind Farm LLC as the operator (EIA operator ID 55866). The operator is not always the owner.

When did Old Trail Wind Farm start operating?

Its first generator began operating in December 2007, according to EIA-860M.

Does InfraMap have power prices for Old Trail Wind Farm?

Yes. InfraMap has PJM day-ahead and real-time prices at 1 price node linked to Old Trail Wind Farm, with the hub price and node-to-hub basis. Prices are free with an InfraMap account; pricing node names are part of InfraMap Pro.

Sources

  • EIA-860 2025 (final) and EIA-860M August 2026: plant, generators, capacity, operator and location
  • EIA-923 monthly net generation, 2000 to July 2026 (2026 provisional)
  • PJM day-ahead and real-time prices; node and hub assignments as of 2026-10-05
  • Project names from the USGS U.S. Wind Turbine Database

Page updated 2026-10-04 from the InfraMap data build. Methodology · Data sources · EIA plant page