Natural gasOperatingJEA

Greenland Energy Center

Natural gas power plant in Duval County, Florida. 380.8 MW of nameplate capacity across 2 generators, operated by JEA.

Also known as EIA plant 56799

Analyst: free account, 1 question a day.

IKEA Jacksonville Rooftop PV SystemBaptist Medical CenterJ D KennedyJax LNGNorthside Generating StationSeminole MillGreenland10 km
Open in the map
6 plants within 30 km, from EIA coordinates.

Key facts

Capacity
380.8 MWNameplate
Generators
2 operatingEIA-860M, August 2026
Operating since
June 2011First generator online
Operator
JEAEIA operator ID 9617
Grid
JEABalancing authority JEA
Price nodes
None linkedNo verified ISO node
Location
Duval County, FL30.1591, −81.5184
EIA plant ID
56799EIA plant page

Data as of EIA-860M August 2026 (published 2026-09-24). Capacity is nameplate, not live output.

How much power Greenland produces

Free · EIA-923

Net generation, 2025

658 GWh

658,098 MWh, final

Capacity factor, 2025

19.7%

2024: 23.0%

January to July 2026

Not reported

Provisional. 0 of 7 months reported

Range, 2015 to 2025

128.9–770.9

GWh a year. Low 2015, high 2024

Annual net generation, GWhCapacity factor below each year
Annual net generation from EIA-923
YearNet generation, MWhCapacity factorMonths reported
2000Not reportedNot reported0 of 12
2001Not reportedNot reported0 of 12
2002Not reportedNot reported0 of 12
2003Not reportedNot reported0 of 12
2004Not reportedNot reported0 of 12
2005Not reportedNot reported0 of 12
2006Not reportedNot reported0 of 12
2007Not reportedNot reported0 of 12
2008Not reportedNot reported0 of 12
2009Not reportedNot reported0 of 12
2010Not reportedNot reported0 of 12
201165,890Not reported7 of 12
2012128,5933.8%12 of 12
201344,0421.3%12 of 12
201433,0411.0%12 of 12
2015128,9273.9%12 of 12
2016313,5629.4%12 of 12
2017247,9997.4%12 of 12
2018350,16210.5%12 of 12
2019456,24013.7%12 of 12
2020570,93817.1%12 of 12
2021703,12021.1%12 of 12
2022560,28516.8%12 of 12
2023550,55216.5%12 of 12
2024770,87723.0%12 of 12
2025658,09819.7%12 of 12
2026 (provisional, partial year)Not reportedNot reported0 of 7

* 2026 covers January to July and is provisional. Capacity factor is net generation divided by nameplate capacity times the hours of each reported month.

Power prices and basis

Free account

No verified ISO price node is linked to this plant, or its price history could not load.

Emissions

Free · EPA CAMPD

CO₂, 2025

416,619

US short tons. 2024: 493,295

SO₂, 2025

2

US short tons

NOx, 2025

116

US short tons

CO₂ per MWh, calculated

0.63 t

About 1,266 lb per MWh

2 of 2 EPA units reported CO₂ in 2025 (1, 2), matched to EIA plant 56799 through the EPA–EIA crosswalk. The per-MWh rate is EPA CO₂ divided by EIA-923 net generation. The two reporting boundaries can differ.

Water use

Free · EIA-923 cooling, USGS

No EIA cooling-water record for this plant in 2024.

Generators

Free · EIA-860M
GeneratorTechnologyNameplate MWOnline since
1Natural Gas Fired Combustion Turbine190.4June 2011
2Natural Gas Fired Combustion Turbine190.4June 2011

Ownership and offtake

Pro
Pro

Ownership and offtake are part of Pro

Owners and their shares, parent companies, and power purchase agreements with their buyers. EIA-860M lists JEA as the operator, which is not always the owner.

Modeled data

Pro

Pro adds modeled values for this plant. Everything above stays free.

Modeled

Generation potential vs reported

Monthly potential at seasonal net capability, next to EIA-923 output. Shows how much of the plant's capability was used.

Analyst and MCP

300 analyst questions a month, plus MCP

Query Greenland Energy Center and 14,224 other projects from Claude or your own tools. Free accounts get 1 question a day.

Power plants near Greenland

More plants operated by JEA

Questions about Greenland

How much power does Greenland Energy Center produce?

Greenland Energy Center reported 658,098 MWh (658 GWh) of net generation in 2025, a 19.7% capacity factor on 380.8 MW of nameplate capacity.

Where is Greenland Energy Center?

Greenland Energy Center is in Duval County, Florida, at 30.1591, −81.5184. It is in the JEA balancing area (JEA).

Who operates Greenland Energy Center?

EIA-860M for August 2026 lists JEA as the operator (EIA operator ID 9617). The operator is not always the owner.

When did Greenland Energy Center start operating?

Its first generator began operating in June 2011, according to EIA-860M.

Sources

  • EIA-860 2025 (final) and EIA-860M August 2026: plant, generators, capacity, operator and location
  • EIA-923 monthly net generation, 2000 to July 2026 (2026 provisional)
  • EPA CAMPD annual emissions through the EPA–EIA crosswalk, 1995 to 2025

Page updated 2026-10-04 from the InfraMap data build. Methodology · Data sources · EIA plant page