WindOperatingERCOT

Hackberry Wind Farm

Wind power plant in Shackelford County, Texas. 165.6 MW of nameplate capacity across 1 generator, operated by Hackberry Wind LLC.

Also known as Hackberry · EIA plant 56823

Analyst: free account, 1 question a day.

Mesquite Wind Power LLCOCI Alamo 7 LLCAzure Sky SolarPost Oak Wind LLCWAL536Sequoia 1Hackberry Wind Farm25 km
Open in the map
6 plants within 44 km, from EIA coordinates.

Key facts

Capacity
165.6 MWNameplate
Generators
1 operatingEIA-860M, August 2026
Operating since
December 2008First generator online
Operator
Hackberry Wind LLCEIA operator ID 56033
Grid
ERCOTBalancing authority ERCO
Price nodes
1 ERCOT nodeResource nodes with prices
Location
Shackelford County, TX32.7683, −99.4228
EIA plant ID
56823EIA plant page

Data as of EIA-860M August 2026 (published 2026-09-24). Capacity is nameplate, not live output.

How much power Hackberry Wind Farm produces

Free · EIA-923

Net generation, 2025

228 GWh

228,393 MWh, final

Capacity factor, 2025

15.7%

2024: 22.4%

January to July 2026

Not reported

Provisional. 0 of 7 months reported

Range, 2015 to 2025

228.4–463.3

GWh a year. Low 2025, high 2019

Annual net generation, GWhCapacity factor below each year
Annual net generation from EIA-923
YearNet generation, MWhCapacity factorMonths reported
2000Not reportedNot reported0 of 12
2001Not reportedNot reported0 of 12
2002Not reportedNot reported0 of 12
2003Not reportedNot reported0 of 12
2004Not reportedNot reported0 of 12
2005Not reportedNot reported0 of 12
2006Not reportedNot reported0 of 12
2007Not reportedNot reported0 of 12
200844,416Not reported2 of 12
2009498,815Not reported12 of 12
2010441,33430.4%12 of 12
2011355,02324.5%12 of 12
2012435,78430.0%12 of 12
2013482,14733.2%12 of 12
2014514,45535.5%12 of 12
2015441,30930.4%12 of 12
2016459,45531.6%12 of 12
2017436,64430.1%12 of 12
2018361,57724.9%12 of 12
2019463,28331.9%12 of 12
2020418,18328.7%12 of 12
2021383,98826.5%12 of 12
2022333,55123.0%12 of 12
2023352,37624.3%12 of 12
2024325,68022.4%12 of 12
2025228,39315.7%12 of 12
2026 (provisional, partial year)Not reportedNot reported0 of 7

* 2026 covers January to July and is provisional. Capacity factor is net generation divided by nameplate capacity times the hours of each reported month.

Power prices and basis

Free account · ERCOT

Emissions

Free · EPA CAMPD

No EPA emissions units are linked to this plant.

Water use

Free · EIA-923 cooling, USGS

No EIA cooling-water record for this plant in 2024. Plants without steam cooling, such as wind, solar and batteries, do not report cooling water.

Generators

Free · EIA-860M
GeneratorTechnologyNameplate MWOnline since
HWFG1Onshore Wind Turbine165.6December 2008

Ownership and offtake

Pro
Pro

Ownership and offtake are part of Pro

Owners and their shares, parent companies, and power purchase agreements with their buyers. EIA-860M lists Hackberry Wind LLC as the operator, which is not always the owner.

Modeled data

Pro

Pro adds modeled values for this plant. Everything above stays free.

Modeled

Modeled curtailment

A range, not one number. The lower bound counts hours inside the production tax credit window; the upper bound is the no-credit case.

Modeled

Expected vs reported generation

Monthly modeled expected output and physical potential next to EIA-923 reported output.

Analyst and MCP

300 analyst questions a month, plus MCP

Query Hackberry Wind Farm and 14,224 other projects from Claude or your own tools. Free accounts get 1 question a day.

Power plants near Hackberry Wind Farm

Questions about Hackberry Wind Farm

How much power does Hackberry Wind Farm produce?

Hackberry Wind Farm reported 228,393 MWh (228 GWh) of net generation in 2025, a 15.7% capacity factor on 165.6 MW of nameplate capacity.

Where is Hackberry Wind Farm?

Hackberry Wind Farm is in Shackelford County, Texas, at 32.7683, −99.4228. It is in the Electric Reliability Council of Texas, Inc. balancing area (ERCO).

Who operates Hackberry Wind Farm?

EIA-860M for August 2026 lists Hackberry Wind LLC as the operator (EIA operator ID 56033). The operator is not always the owner.

When did Hackberry Wind Farm start operating?

Its first generator began operating in December 2008, according to EIA-860M.

Does InfraMap have power prices for Hackberry Wind Farm?

Yes. InfraMap has ERCOT day-ahead and real-time prices at 1 price node linked to Hackberry Wind Farm, with the hub price and node-to-hub basis. Prices are free with an InfraMap account; pricing node names are part of InfraMap Pro.

Sources

  • EIA-860 2025 (final) and EIA-860M August 2026: plant, generators, capacity, operator and location
  • EIA-923 monthly net generation, 2000 to July 2026 (2026 provisional)
  • ERCOT day-ahead and real-time prices; node and hub assignments as of 2026-10-05
  • Project names from the USGS U.S. Wind Turbine Database

Page updated 2026-10-04 from the InfraMap data build. Methodology · Data sources · EIA plant page